Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 85 ]
�
� |
Proposed revisions to the main body of Report ITU-R BT.2302
�
� |
European Broadcasting Union
� |
� |
2020-09-28 |
|
[ 84 ]
�
� |
Preliminary draft revision of Report ITU-R BS.2384-1 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting
�
� |
China (People's Republic of)
� |
� |
2020-09-29 |
|
[ 83 ]
�
� |
Preliminary draft revision of Report ITU-R BT.2295-3 - Digital terrestrial broadcasting systems
�
� |
China (People's Republic of)
� |
� |
2020-09-29 |
|
[ 82 ]
�
� |
Collection of field trials of UHDTV over DTT networks
�
� |
France
� |
� |
2020-09-28 |
|
[ 81 ]
�
� |
Revision of Report ITU-R BT.2301-2 - National field reports on the introduction of IMT in the bands with co-primary allocation to the broadcasting and the mobile services
�
� |
France
� |
� |
2020-09-28 |
|
[ 80 ]
�
� |
Preliminary draft revision of Recommendation ITU-R BS.1615 - "Planning parameters" for digital sound broadcasting at frequencies below 30 MHz
�
� |
United States of America
� |
� |
2020-09-25 |
|
[ 79 ]
�
� |
Information Document: An ATSC 3.0 Broadcast 5G Heterogeneous Network
�
� |
United States of America
� |
� |
2020-09-25 |
|
[ 78 ]
�
� |
Input on the proposed revision of Report ITU-R BT 2344-2 - Information on technical parameters, operational characteristics and deployment scenarios of SAB/SAP as utilized in broadcasting
�
� |
United States of America
� |
� |
2020-09-25 |
|
[ 77 ]
�
(Rev.1)� |
Report of Correspondence Group on activities between February and September 2020
�
� |
CG of WP 6A on Rev. Rep. ITU-R BS.2384 and BT.2140
� |
� |
2020-09-23 |
|
[ 76 ]
�
� |
Reply liaison statement to Working Party 1A (copy for information to ITU-R Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7C) - Liaison between ITU-R and CISPR on the protection of radio services in the 6-40 GHz frequency range
�
� |
WP 7D
� |
� |
2020-09-21 |
|
[ 75 ]
�
(Rev.1)� |
Report of activities in Correspondence Group
�
� |
Chairman, CG on Rep./Rec. ITU-R BT.[INTRO-NEWTECH]
� |
� |
2020-09-21 |
|
[ 74 ]
�
� |
Progress Report WRC-23 agenda items 1.4, 1.9, 1.12, and 9.1, topics a) and c)
�
� |
RG for WRC-23 related AIs
� |
AI9.1C), AI9.1A), AI1.9, AI1.4, AI1.12
� |
2020-09-18 |
|
[ 73 ]
�
+Ann.1-5� |
Report of Rapporteur Group on activities between February and September 2020
�
� |
RG on MonteCarloDTT
� |
� |
2020-09-18 |
|
[ 72 ]
�
� |
[Working document towards a ] Preliminary draft revision to Report ITU-R BT.2467 - Methods for the evaluation of the quality of service of second generation DTTB systems
�
� |
Free TV Australia Ltd.
� |
Q132/6
� |
2020-09-16 |
|
[ 71 ]
�
+Ann.2-4� |
Report of Rapporteur Group on activities between February and September 2020
�
� |
RG on WRC-23 AI 1.5
� |
AI1.5
� |
2020-09-16 |
|
[ 70 ]
�
� |
Interim Report on Liaison with CISPR on Protection Requirements for the Broadcasting Service
�
� |
WP 6A Rapporteur
� |
� |
2020-09-08 |
|
[ 69 ]
�
� |
Initial reply liaison statement to Working Party 5D (copied to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D for information) - WRC-23 agenda item 1.4
�
� |
WPs 3J, 3K & 3M
� |
AI1.4
� |
2020-08-27 |
|
[ 68 ]
�
� |
Reply liaison statement to Working Party 5B (copied to Working Parties 5A, 5C, 6A and ICAO for information) - WRC-23 agenda item 1.9 - Review of Appendix 27 of the Radio Regulations to accommodate digital aeronautical HF technologies
�
� |
WP 3L
� |
AI1.9
� |
2020-08-27 |
|
[ 67 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A - Recommendation ITU-R P.368-9 - Software implementations of ground-wave propagation predictions - GRWAVE and LFMF-SmoothEarth
�
� |
WP 3L
� |
� |
2020-08-27 |
|
[ 66 ]
�
� |
Liaison statement to Task Group 6/1 (copied to Working Parties 5A, 5B, 5C, 5D and 6A for information) - WRC-23 agenda item 1.5 - Organisation of work of Working Parties 3K and 3M to support Task Group 6/1
�
� |
WPs 3K & 3M
� |
AI1.5
� |
2020-08-25 |
|
[ 65 ]
�
� |
Liaison statement on new Recommendation ITU-T Y.3531 - Cloud computing functional requirements for machine learning as a service
�
� |
ITU-T SG13
� |
� |
2020-08-17 |
|
[ 64 ]
�
� |
Liaison statement on invitation to review artificial intelligence standardization roadmap and provide missing or updated information
�
� |
ITU-T SG13
� |
� |
2020-08-17 |
|
[ 63 ]
�
� |
Brazilian next generation digital terrestrial television (Information Document)
�
� |
Brazil (Federative Republic of)
� |
� |
2020-08-10 |
|
[ 62 ]
�
� |
Reply liaison statement to Working Party 5D (copied for information to Working Parties 4A, 4C, 5A, 5B, 6A, 7B, 7C and 7D) - WRC-23 agenda item 1.4
�
� |
WP 5C
� |
AI1.4
� |
2020-08-07 |
|
[ 61 ]
�
� |
Liaison statement to Working Parties 7C (copied to Working Parties 5C and 6A for information) - Preparations for studies under WRC-23 agenda item 1,12
�
� |
WP 5A
� |
AI1.12
� |
2020-08-06 |
|
[ 60 ]
�
� |
Reply liaison statement to Working Party 7C (copied for information to Working Parties 5A and 6A) - WRC-23 agenda item 1.12
�
� |
WP 5C
� |
AI1.12
� |
2020-08-06 |
|
[ 59 ]
�
� |
Liaison statement to Working Parties 3L, 3M, 5A, 5C, 6A and ICAO - WRC-23 agenda item 1,9 - Review of Appendix 27 of the Radio Regulations to accommodate digital aeronautical HF technologies
�
� |
WP 5B
� |
AI1.9
� |
2020-08-06 |
|
[ 58 ]
�
� |
Liaison statement on versatile video coding (VVC)
�
� |
ITU-T SG16
� |
� |
2020-07-23 |
|
[ 57 ]
�
� |
Liaison statement to ITU-R Study Group 6 - Terms and definitions proposed by ITU-T Study Group 16
�
� |
CCT
� |
� |
2020-07-21 |
|
[ 56 ]
�
� |
Liaison statement to ITU-R Study Group 6 (copy to ITU-T Study Groups 9 and 12) - Proposal to add the broadcasting term "Quasi error free" to the ITU Terminology Database
�
� |
CCT
� |
� |
2020-07-21 |
|
[ 55 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
�
� |
Chairman, CCV
� |
� |
2020-07-14 |
|
[ 54 ]
�
� |
Reply liaison statement on work being carried out in ITU-T SG5 on human exposure to EMF from ICTS (reply to ITU-D Q7/2 -SG2RGQ/200)
�
� |
ITU-T SG5
� |
� |
2020-07-13 |
|
[ 53 ]
�
� |
Reply liaison statement on EMF exposure form bonded cellular devices
�
� |
ITU-T SG5
� |
� |
2020-06-29 |
|
[ 52 ]
�
� |
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups
�
� |
Director, BR
� |
� |
2020-06-25 |
|
[ 51 ]
�
� |
Reply liaison statement on the new version of the Access Network Transport (ANT) standard overview and work plan
�
� |
ITU-T SG9
� |
� |
2020-05-27 |
|
[ 50 ]
�
� |
Liaison statement from SC 29/WG11 to ITU-R Working Party 6B on versatile video coding [SC 29/WG 11N 19205]
�
� |
International Organization for Standardization
� |
� |
2020-05-15 |
|
[ 49 ]
�
� |
Liaison response from CISPR/H to Working Party 6A on their proposal for changes in the radioservices database of IEC
�
� |
International Special Committee on Radio Interference
� |
� |
2020-05-07 |
|
[ 48 ]
�
(Rev.1)� |
Liaison statement to Working Parties 5A, 5B, 5C and 6A - Preparations for studies under WRC-23 agenda item 1.12
�
� |
WP 7C
� |
AI1.12
� |
2020-04-30 |
|
[ 47 ]
�
� |
Input to Working Parties 1C and 3L and to Correspondence Group 3L-7 (copied for information only to Working Parties 1A and 6A) - Revision of Recommendation ITU-R P.372 to take account of man-made noise indoors
�
� |
European Broadcasting Union
� |
� |
2020-04-16 |
|
[ 46 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, and 7D - Information for studies on WRC-23 agenda item 1.4
�
� |
WP 5D
� |
AI1.4
� |
2020-03-06 |
|
[ 45 ]
�
� |
Liaison statement to Working Party 4A (copy for information to Working Party 6A) - Preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]
�
� |
WP 5D
� |
� |
2020-03-06 |
|
[ 44 ]
�
� |
Liaison statement on information WTSA-20 preparation
�
� |
ITU-T SG5
� |
� |
2020-02-24 |
|
[ 43 ]
�
� |
Liaison on the new version of the Home Network Transport (HNT) standards overview and work plan
�
� |
ITU-T SG15
� |
� |
2020-02-19 |
|
[ 42 ]
�
+Ann.1-19� |
Report of the meeting of Working Party 6A (Geneva, 4-12 February 2020)
�
� |
Chairman, WP 6A
� |
� |
2020-02-12 |
|
[ 41 ]
�
� |
Final List of Participants - Working Party 6A (Geneva, 4-12 February 2020)
�
� |
Director, BR
� |
� |
2020-02-12 |
|
[ 40 ]
�
� |
Liaison statement from Study Group 6 to ITU-T Study Group 13 (To be considered by Working Party 6A and consolidated by WP 6B for SG 6) - Review of Artificial Intelligence Standardization Roadmap and provide missing or updated information
�
� |
WP 6C
� |
� |
2020-02-07 |
|
[ 39 ]
�
� |
Proposed text for liaison statements via Study Group 6 - Liaisons to ITU-T FG-AI4EE and to ITU-T TSAG and ITU-D TDAG
�
� |
Chairman, WP 6C
� |
� |
2020-02-05 |
|
[ 38 ]
�
� |
List of documents issued (Documents 6A/1 - 6A/38)
�
� |
BR, Study Groups Department
� |
� |
2020-02-03 |
|
[ 37 ]
�
(Rev.1)� |
Update to Working Party 6A (February 2020)
�
� |
RG on RF Hazard
� |
� |
2020-02-03 |
|
[ 36 ]
�
(Rev.2)� |
Proposed organization of the work of Study Group 6
�
� |
Chairman, SG 6
� |
� |
2020-01-29 |
Resultats:485 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):