Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 189 ]
�
� |
Liaison statement to Working Parties 1A, 5B, 5C, 6A, 7A and 7D - Studies on "Wireless power transmission (WPT)"
�
� |
WP 1B
� |
Q210/1
� |
2016-12-14 |
|
[ 188 ]
�
� |
Reply liaison statement to Working Party 6A - Radio frequency ranges for Wireless Power Transfer (WPT)
�
� |
WP 1B
� |
Q210/1
� |
2016-12-14 |
|
[ 187 ]
�
� |
Liaison statement to Working Parties 1A, 5B and 6A - Studies on WRC-19 agenda item 9.1, issue 9.1.6 (Resolution 958 (WRC-15) Annex item 1) "Wireless power transmission"
�
� |
WP 1B
� |
� |
2016-12-14 |
|
[ 186 ]
�
� |
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transfer (WPT)
�
� |
WP 1A
� |
Q210/1
� |
2016-12-13 |
|
[ 185 ]
�
� |
Reply liaison statement to Working Party 6A (copy to Working Parties 1B, 1C, 5A, 5B, 5C, 7A and 7D) - Radio frequency ranges for Wireless Power Transmission (WPT)
�
� |
WP 1A
� |
Q210/1
� |
2016-12-13 |
|
[ 184 ]
�
� |
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges or wireless power transmission using technologies other than radio frequency beam
�
� |
WP 1A
� |
Q210/1
� |
2016-12-13 |
|
[ 183 ]
�
� |
Liaison statement to Working Parties 5B and 6A - Proposed revision of Recommendation ITU-R SM.1009-1
�
� |
WP 1A
� |
� |
2016-12-13 |
|
[ 182 ]
�
� |
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunications services
�
� |
WP 1A
� |
� |
2016-12-13 |
|
[ 181 ]
�
� |
Liaison statement to Working Parties 1C, 3L, 5A, 5B, 5C, 6A, 7A and 7D - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services (Questions ITU-R 221-2/1 and ITU-R 236/1)
�
� |
WP 1A
� |
Q236/1, Q221-2/1
� |
2016-12-13 |
|
[ 180 ]
�
� |
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison statement on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014)
�
� |
WP 1A
� |
� |
2016-12-13 |
|
[ 179 ]
�
� |
Liaison statement to ITU-D Study Group 1 (SG 1), Question 2/1 (copy to ITU-R Coordination Committee for Vocabulary (CCV); Working Parties 4A, 4B and 4C; Working Parties 5B and 5D; Working Party 6A for information) - Broadband access technologies, including IMT, for developing countries - What is the definition of Broadband?
�
� |
WPs 5A and 5C
� |
� |
2016-12-05 |
|
[ 178 ]
�
� |
Reply liaison statement to Working Party 1A (copied for information to Working Parties 1B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
�
� |
WP 5B
� |
Q210/1
� |
2016-11-28 |
|
[ 177 ]
�
� |
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 agenda item 1.13
�
� |
WP 5A
� |
AI1.13
� |
2016-11-23 |
|
[ 176 ]
�
� |
Reply liaison statement to ITU-R Working Party 6B (copy to Working Party 5D)
�
� |
WP 5A
� |
� |
2016-11-23 |
|
[ 175 ]
�
� |
Liaison statement to Working Party 7C (copied to Working Parties 3L, 5B, 5C and 6A for information) - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range
�
� |
WP 5A
� |
� |
2016-11-23 |
|
[ 174 ]
�
� |
Reply liaison statement to Working Party 6A - Amateur service characteristics in the 50-54 MHz frequency band to be used in sharing studies with the amateur service under agenda item 1.1
�
� |
WP 5A
� |
AI1.1
� |
2016-11-23 |
|
[ 173 ]
�
� |
Reply liaison statement to ITU-D Study Group 2 (copy to Working Parties 1B, 1C, 3L, 4A, 5A, 5C, 6A for information) - ITU-D Question 7/2: strategies and policies concerning human exposure to electromagnetic fields
�
� |
WP 5A
� |
� |
2016-11-18 |
|
[ 172 ]
�
� |
Reply liaison statement to Working Party 1A (copy to Working Parties 1B, 5A, 5B, 6A, 7A and 7D for information) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
�
� |
WP 5C
� |
� |
2016-11-17 |
|
[ 171 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D (copy to Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
�
� |
WP 5C
� |
� |
2016-11-16 |
|
[ 170 ]
�
� |
Reply liaison statement to Working Party 5B on technical characteristics for the fixed service for studies under WRC-19 agenda item 1.9.2 (copy to Working Parties 1A, 3M, 4C, 5A, 6A, 7B and 7D for information)
�
� |
WP 5C
� |
� |
2016-11-16 |
|
[ 169 ]
�
� |
Reply liaison statement to ITU-R Working Parties 1A and 5A (copy to Working Party 6A for information) - Revision of Recommendation ITU-R SM.851 and WRC-19 agenda item 1.1
�
� |
WP 5C
� |
� |
2016-11-16 |
|
[ 168 ]
�
� |
Reply liaison statement to ITU-D Study Group 2, Working Party 1C (copy to Working Parties 1B, 3L, 4A, 5A, 5B, 6A for information) - ITU-D Question 7/2: strategies and policies concerning human exposure to electromagnetic fields
�
� |
WP 5C
� |
� |
2016-11-16 |
|
[ 167 ]
�
� |
Liaison statement to Working Party 1A (copied for information to Working Party 6A and ICAO) - Proposed revision of Recommendation ITU-R SM.1009-1
�
� |
WP 5B
� |
� |
2016-11-14 |
|
[ 166 ]
�
� |
Liaison statement to ITU-R Working Parties 6A and 6C - Global platform for the broadcasting service
�
� |
WP 6B
� |
� |
2016-11-11 |
|
[ 165 ]
�
� |
Liaison statement to ITU-D Study Group 1, Question 2/1 (copy to Coordination Committee for Vocabulary (CCV), Working Parties 4B, 4C, 5A, 5B, 5C, 5D and 6A) - Broadband access technologies, including IMT, for developing countries - What is the definition of Broadband?
�
� |
WP 4A
� |
� |
2016-11-02 |
|
[ 164 ]
�
� |
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7
�
� |
WP 7B
� |
AI1.7
� |
2016-11-01 |
|
[ 163 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 5A, 5B, 5C, 5D, 6A and 7C) - WRC-19 agenda items 1.6 and 9.1, issue 9.1.9
�
� |
WP 7D
� |
AI9.1, AI1.6
� |
2016-11-01 |
|
[ 162 ]
�
� |
Liaison statement to Working Party 1A (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
�
� |
WP 7D
� |
210-3/1
� |
2016-11-01 |
|
[ 161 ]
�
+Ann.1-17� |
Report of the meeting of Working Party 6A (Geneva, 18 - 26 October 2016)
�
� |
Chairman, WP 6A
� |
� |
2016-10-27 |
|
[ 160 ]
�
� |
Final list of participants - Working Party 6A (Geneva, 18-26 October 2016)
�
� |
Director, BR
� |
� |
2016-10-26 |
|
[ 159 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 9/2 to ITU-T and ITU-R Study Groups on ongoing collaboration
�
� |
ITU-D SG 2
� |
� |
2016-10-24 |
|
[ 158 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5, ITU-R Study Group 1, ITU-R Study Group 5, ITU-R Study Group 6 and their relevant Working Parties on ongoing collaboration
�
� |
ITU-D SG 2
� |
� |
2016-10-24 |
|
[ 157 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 5/2 to ITU-R Working Party 6A on Report on ICT experiences and best practices in disaster mitigation and relief
�
� |
ITU-D SG 2
� |
� |
2016-10-24 |
|
[ 156 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 4/2 to ITU-R Study Group 6 Working Party 6A on collaboration
�
� |
ITU-D SG 2
� |
� |
2016-10-24 |
|
[ 155 ]
�
� |
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5
�
� |
ITU-T SG 5
� |
� |
2016-10-18 |
|
[ 154 ]
�
� |
List of documents issued (Documents 6A/36 - 6A/154)
�
� |
BR Study Groups Department
� |
� |
2016-10-17 |
|
[ 153 ]
�
� |
Report of the Chairman on RG 11 activity
�
� |
RG - 11
� |
� |
2016-10-17 |
|
[ 152 ]
�
� |
Liaison statement to Working Party 4A (copied for information to Working Parties 3J, 3K, 3M, 4C, 5A, 6A, 7B and Task Group 5/1) - Modelling and simulation of IMT networks for use in sharing and compatibility studies
�
� |
WP 5D
� |
� |
2016-10-17 |
|
[ 151 ]
�
� |
Liaison statement to Study Group 6 and Working Party 6A (copy to Study Group 5) - Revisions to Report ITU-R BT.2337 - Sharing and compatibility studies between digital terrestrial television broadcasting and terrestrial mobile broadband applications, including IMT, in the frequency band 470-694/698 MHz
�
� |
WP 5D
� |
� |
2016-10-17 |
|
[ 150 ]
�
� |
Liaison statement to ITU-D Study Group 1 Question 2/1, to ITU-R Coordination Committee for Vocabulary (CCV), Working Parties 4A, 4B, 4C, 5A, 5B, 5C and 6A on broadband definition - Broadband access technologies, including IMT, for developing countries - What is the definition of Broadband
�
� |
WP 5D
� |
� |
2016-10-17 |
|
[ 149 ]
�
� |
Liaison statement to Working Parties 6A and 6B - Audio-visual capabilities and applications supported by terrestrial IMT systems
�
� |
WP 5D
� |
� |
2016-10-17 |
|
[ 148 ]
�
� |
First Report from the Rapporteur Group of Working Party 6A on RF Hazard
�
� |
RG on RF Hazard
� |
� |
2016-10-17 |
|
[ 147 ]
�
� |
DVB specification for the use of video and audio coding in broadcasting applications
�
� |
Director, BR
� |
� |
2016-10-13 |
|
[ 146 ]
�
� |
Report on recent developments on WPT under issue 9.1.6 of WRC-19
�
� |
Rapp. on WPT Issues
� |
� |
2016-10-11 |
|
[ 145 ]
�
� |
Report on recent developments concerning PLT systems and general EMC-related interference issues (Question ITU-R 221/1)
�
� |
SG 6 Rapp. on PLT Issues
� |
� |
2016-10-11 |
|
[ 144 ]
�
� |
Preliminary draft revision to Recommendation ITU-R BS.1114-9 - Systems for terrestrial digital sound broadcasting to vehicular, portable and fixed receivers in the frequency range 30-3 000 MHz
�
� |
European Broadcasting Union
� |
� |
2016-10-11 |
|
[ 143 ]
�
� |
Correction of Table 2.7 in Report BT.2254-2 (Length of guard interval for DVB-T2 in a 1.7 MHz channel raster)
�
� |
European Broadcasting Union
� |
� |
2016-10-11 |
|
[ 142 ]
�
� |
Proposed revision of Recommendation ITU-R SM.1009-1
�
� |
British Broadcasting Corporation (BBC)
,
European Broadcasting Union
� |
� |
2016-10-11 |
|
[ 141 ]
�
� |
Comparison of measured and calculated C/N values in Report BT.2254 and C/N values for time-variant Rayleigh channels for DVB-T2
�
� |
Norddeutscher Rundfunk (NDR)
,
Zweites Deutsches Fernsehen
� |
� |
2016-10-11 |
|
[ 140 ]
�
� |
Proposed revision to Report ITU-R BT.2337-0 - Sharing and compatibility studies between digital terrestrial television broadcasting and terrestrial mobile broadband applications, including IMT, in the frequency band 470-694/698 MHz
�
� |
CBS Corporation
� |
� |
2016-10-11 |
Resultats:589 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):