Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP4C : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP4C� C�

UIT-R�WP4C

Utilisation Efficace de l�Orbite/Spectre pour le SMS et le SRRS

Resultats:474 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Suivant Next
Contributions��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 74 ]
(Rev.1)
Reply liaison statement to Working Party 7D (copied for information to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and Task Group 5/1) - Propagation data and predictions for coexistence and compatibility studies above 50 GHz � WPs 3K and 3M 2016-07-04
[ 73 ]
Reply liaison statement to Working Party 4C (copied for information to Working Party 5D) - Studies related to coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-1 518 MHz � WP 3M 2016-07-04
[ 72 ]
Reply liaison statement to Working Party 5C (copied for information to Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and TG 5/1) - Propagation data and prediction methods required for coexistence and compatibility studies for High-Altitude Platform Stations (HAPS) � WP 3M 2016-07-04
[ 71 ]
Reply liaison statement to Working Party 5D (copied for information to Working Party 4C) - Propagation data and predictions for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band � WPs 3K and 3M 2016-07-01
[ 70 ]
Reply liaison statement to Working Parties 5B and 7B (copied to Working Parties 4A, 4C, 5A, 5C, 5D and 7D for information) - ITU-R propagation models for use in aeronautical propagation scenarios � WPs 3K and 3M 2016-07-01
[ 69 ]
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz � WP 3J 2016-07-01
[ 68 ]
Liaison statement to Working Parties 4A & 4C - Coordination of work on anticipated draft CPM text deadlines for WRC-19 agenda items / issues where Working Party 5D is a jointly responsible group � WP 5D 2016-06-29
[ 67 ]
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies � WP 5D 2016-06-28
[ 66 ]
Reply liaison statement to Working Party 4C - Co-existence and compatibility study between mobile satellite systems and terrestrial IMT-Advanced systems in the 2 GHz band in different countries � WP 5D 2016-06-28
[ 65 ]
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7 � WP 5D AI1.7 2016-06-24
[ 64 ]
Liaison statement to Working Party 4C - Technical measures to ensure coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-1 518 MHz � WP 5D 2016-06-23
[ 63 ]
Liaison statement to Working Party 7B (copied to Working Parties 3M, 4C, 5A, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.3 � WP 5D AI1.3 2016-06-23
[ 62 ]
Liaison response to Working Party 5A (copy to Working Parties 4A, 4B, 4C and ITU-T Study Group 17) - Network security requirements for Public Protection and Disaster Relief and Emergency Communication � WP 5D 2016-06-23
[ 61 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz � WP 1A 2016-06-13
[ 60 ]
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing... � WP 1B 2016-06-13
[ 59 ]
Liaison statement to Working Parties 5A and 5C on infrastructure sharing (copy to Working Parties 4C and 5C) - Innovative regulatory tools to support enhanced shared use of the spectrum � WP 1B 208-1/1 2016-06-13
[ 58 ]
Liaison statement to Working Party 5D (copied for information to Task Group 5/1) - Propagation advice in support of agenda item 1.13: input requested from Working Party 5D � Chairmen, SG 3, WP 3J, WP 3K and WP 3M AI1.13 2016-06-01
[ 57 ]
Liaison statement to Working Parties 4A, 4C, 5B and 5C (copied for information to Working parties 1B, 3J, 3K, 3M and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16 � WP 5A AI1.16 2016-05-25
[ 56 ]
Liaison response to ITU-T SG 17 (copy to Working Parties 4A, 4B, 4C and 5D) - Network security requirements for Public Protection and Disaster Relief and Emergency Communication � WP 5A 2016-05-25
[ 55 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7 � WP 5A AI1.7 2016-05-25
[ 54 ]
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 4C, 5B, 5C, 5D and 6A) - Technical characteristics for WRC-19 agenda item 1.3 � WP 5A AI1.3 2016-05-25
[ 53 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Preparation for WRC-19 agenda item 1.13 � TG 5/1 AI1.13 2016-05-25
[ 52 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5B and 6A) - WRC-19 agenda item 1.7 � WP 5C AI1.7 2016-05-24
[ 51 ]
Liaison statement requesting technical characteristics for WRC-19 agenda item 1.9.2 from Working Parties 4C, 5A, 5C, 6A, 7B and 7D (copy to Working Parties 1A and 3M for information) � WP 5B 2016-05-23
[ 50 ]
Liaison statement to Working Parties 3K & 3M (copy for information to Working Parties 5A, 5C, 5D, 4A, 4C, 7B and 7D) - Questions for Working Parties 3K and 3M on ITU-R propagation Recommendations used by Working Party 5B � WP 5B 2016-05-23
[ 49 ]
Liaison statement to Working Party 4C - Introduction of additional mobile-satellite service systems into the Global Maritime Distress Safety System (GMDSS) � WP 5B 2016-05-23
[ 48 ]
Liaison statement to ITU-R Working Parties 3M, 4A, 4C, 5A, 5D, 7B, 7C and 7D (for information to Task Group 5/1) - WRC-19 agenda item 1.14 � WP 5C AI1.14 2016-05-20
[ 47 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5C and 6A) - WRC-19 agenda item 1.7 � WP 5B AI1.7 2016-05-20
[ 46 ]
Liaison statement to Telecommunication Standardization Advisory Group and ITU-R Working Party 4C � WP 5B 2016-05-18
[ 45 ]
Liaison statement on Recommendation ITU-T K.106 (K.mhn) � ITU-T SG 5 2016-05-13
[ 44 ]
Liaison statement to WP 5C concerning WRC-19 agenda item 1.14 - (copy to WP 4A, WP 4C, WP 5A, WP 5D, WP 7D, WP 3M for information) � WP 7B AI1.14 2016-04-12
[ 43 ]
+Ann.1-15
Report on the meeting of Working Party 4C (Geneva, 6-12 April 2016) � Chairman, WP 4C 2016-04-12
[ 42 ]
Final list of participants - Working Party 4C (Geneva, 6-12 April 2016) � Director, BR 2016-04-12
[ 41 ]
Liaison statement to Working Party 5A (Working Parties 4A, 4C, 5B, and 5C copied for information) - Information pertaining to EESS (active) in the 5 GHz range to be considered under WRC-19 agenda item 1.16 � WP 7C AI1.16 2016-04-11
[ 40 ]
Liaison statement to Working Party 5C for WRC-19 agenda item 1.14 sharing studies (copy to Working Parties 4A, 4C, 5A, 5D, 7D, 3M) � WP 7C AI1.14 2016-04-11
[ 39 ]
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information) � WP 7D 2016-04-11
[ 38 ]
Liaison statement to Working Parties 4C and 5B (copy to the Joint IMO/ITU Experts Group) - Compatibility of the radio astronomy service with satellite-provided global maritime distress and safety systems (WRC-19 AI 1.8) � WP 7D AI1.8 2016-04-08
[ 37 ]
Liaison statement requesting technical characteristics for WRC-19 agenda item 1.3 from Working Parties 4C, 5A, 5B, 5C, 5D and 6A (copy to Working Party 3M for information) � WP 7B 2016-04-07
[ 36 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C and 6A concerning WRC-19 agenda item 1.7 (copy for information to Working Party 1A, Working Party 3M and Working Party 4B) - WRC-19 agenda item 1.7 � WP 7B AI1.7 2016-04-07
[ 35 ]
Liaison statement to Working Party 4C regarding WRC-19 agenda item 1.2 (copy to Working Parties 3M and 5A for information) � WP 7B 2016-04-07
[ 34 ]
List of documents issued (Documents 4C/1 - 4C/34) � BR Study Groups Department 2016-04-05
[ 33 ]
Liaison statement to Radiocommunication Study Groups and Working Parties � Chairman, CCV 2016-04-01
[ 32 ]
Proposed revisions to preliminary draft new Report ITU-R M.[ADS-MSS] � Inmarsat Plc. 2016-03-30
[ 31 ]
Proposed updates to the coexistence and compatibility between the satellite and terrestrial components of IMT in the 2 GHz band � Inmarsat Plc. 201-1/4 2016-03-30
[ 30 ]
Technical measures to ensure coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-2 518 MHz � Inmarsat Plc. 2016-03-30
[ 29 ]
Agenda item 1.2 (WRC-19) � France 2016-03-30
[ 28 ]
Draft liaison statement to Working Party 7C regarding preliminary draft new Recommendation ITU-R RS.[EESS_RNSS_METH] � France 2016-03-30
[ 27 ]
Reply to liaison statement to ITU-T Study Group 9 - Coexistence of wired telecommunications and RNSS systems � France 2016-03-30
[ 26 ]
[Preliminary] draft new Report ITU-R M.[ADS-MSS] - Use of existing mobile-satellite service systems for aircraft tracking � France 2016-03-30
[ 25 ]
Protection criterion for MSS Earth Stations in the 1 518-1 525 MHz band � France 2016-03-30
Resultats:474 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2021-01-11