Contributions ��
�
Num�ro �
Titre
Source
AI/Question
Filtre...
136-2/6
205/5
205-/5
205-5/5
209-4/5
212-4/5
215-4/5
230-3/5
238-2/5
240/5
241/5
241-1/5
241-2/5
37-5/5
48-6/5
48-7/5
Effacer filtre
Date
�
[ 344 ]
�
�
Liaison statement to Working Party 5C (copy to Working Parties 5A and 7B for information) - WRC-15 agenda item 1.9.1
�
�
WP 4A
�
�
2013-10-22
�
[ 343 ]
�
�
Liaison statement to Working Party 5A - WRC-15 agenda item 1.6
�
�
WP 4A
�
�
2013-10-22
�
[ 342 ]
�
�
Liaison statement to Working Party 1B on development of a draft new Report ITU-R SM.[WHITE-SPACE] - (Copy to Working Party 5A for information) - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities
�
�
WP 5D
�
�
2013-10-18
�
[ 341 ]
�
�
Response to the liaison statement from ITU-R Working Party 5A on the work towards a preliminary draft new Recommendation ITU-R M.[V2X] - Radio interface standards of vehicle-to-vehicle and vehicle-to-infrastructure communication for intelligent transport systems applications
�
�
European Telecommunications Standards Institute
�
�
2013-10-14
�
[ 340 ]
�
�
Liaison statement to Working Party 5B (copy to Working Parties 5A and 5C) - WRC-15 agenda item 1.16 - VDES satellite component
�
�
WP 4C
�
�
2013-10-07
�
[ 339 ]
�
�
Liaison statement on draft revision of Recommendation ITU-R M.1076 "Wireless communication systems for persons with impaired hearing" (reply to Document 5B/110)
�
�
ITU-T JCA-AHF
�
�
2013-10-03
�
[ 338 ]
�
�
Liaison statement on nomination of JCA-AHF representatives
�
�
ITU-T JCA-AHF
�
�
2013-10-02
�
[ 337 ]
�
�
Answer to liaison statement to PPDR External Organizations on the technologies for public protection and disaster relief communications associated with work on WRC-15 agenda item 1.3
�
�
Alcatel-Lucent France
,
Alcatel-Lucent Shanghai Bell
,
Alcatel-Lucent USA Inc.
,
AT&T, Inc.
,
Hitachi, Ltd.
,
Huawei Technologies Co. Ltd.
,
Intel Corporation
,
NEC Corporation
,
Samsung Electronics Co., Ltd.
�
�
2013-09-30
�
[ 336 ]
�
�
Liaison statement to Working Party 4A and the Special Committee - (copy for information to Working Parties 5A and 6A) - WRC-15 agenda item 9.1 (9.1.8)
�
�
WP 7B
�
�
2013-09-24
�
[ 335 ]
�
�
Liaison statement to Working Party 5A - WRC-15 agenda item 1.12
�
�
WP 7C
�
�
2013-09-20
�
[ 334 ]
�
�
Recommendation ITU-R SM.1541-5 - Unwanted emissions in the out-of-band domain
�
�
SG 1
�
�
2013-09-19
�
[ 333 ]
�
�
Liaison statement to ITU-R WP 5A on CRS
�
�
Asia-Pacific Telecommunity
�
�
2013-09-18
�
[ 332 ]
�
�
Liaison statement to ITU-R WP 5A
�
�
Asia-Pacific Telecommunity
�
�
2013-09-18
�
[ 331 ]
�
�
Liaison statement to ITU-R Working Parties 5A, 5B, 5D and Joint Task Group 4-5-6-7 - WRC-15, agenda item 1.1 - Additional comments in relation to frequency bands identified by ITU-R for future assessment of the suitability for IMT
�
�
International Maritime Organization
�
�
2013-09-13
�
[ 330 ]
�
�
Information on the preparation of texts for the draft CPM Report to WRC-15
�
�
Chairman, CPM-15
�
�
2013-09-10
�
[ 329 ]
�
�
Liaison statements on new versions of the Access Network Transport (ANT) Standardization overview and Work plan
�
�
ITU-T SG 15
�
�
2013-07-25
�
[ 328 ]
�
�
Liaison statement on determination of the ITU-T G.fast PSD specification
�
�
ITU-T SG 15
�
�
2013-07-24
�
[ 327 ]
�
�
Liaison statement to Working Party 5C and ITU-T Study Groups 13 and 15 (copy for information to Working Party 5A) on development of a draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial mobile broadband systems
�
�
WP 5D
�
�
2013-07-22
�
[ 326 ]
�
�
Liaison statement to Working Parties 5A and 5C - Improved sectoral antenna pattern approximations in Recommendation ITU-R F.1336
�
�
WP 5D
�
�
2013-07-22
�
[ 325 ]
�
�
Liaison statement to ITU-T Study Group 5 (Question 14/5) (copy to ITU-D Study Group 2 and ITU-R Working Party 5A for information) - Use of spectrum and radio technology low cost sustainable telecommunication infrastructure for rural communications in developing countries
�
�
WP 5D
�
�
2013-07-22
�
[ 324 ]
�
�
Liaison statement to ITU-T Study Group 13 Question 16/13 (copy to ITU-R Study Group 1 and for information to Working Parties 5A, 5B and 5C)
�
�
WP 5D
�
�
2013-07-22
�
[ 323 ]
�
�
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 1A, 1B, 4A and 5A for information) - Status of compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments
�
�
WP 5D
�
�
2013-07-17
�
[ 322 ]
�
(Rev.1) �
Liaison statement to Working Party 5A - Compatibility predictions at 5 MHz
�
�
WP 3L
�
�
2013-07-01
�
[ 321 ]
�
�
Liaison statement to Working Parties 5A and 6A, and HFCC - Revisions to Recommendation ITU-R P.842
�
�
WP 3L
�
�
2013-07-01
�
[ 320 ]
�
�
Liaison statement to the CCV (copy to Working Party 5A) - Definition and translation of the term "white space"
�
�
WP 1B
�
�
2013-06-24
�
[ 319 ]
�
�
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[WHITE-SPACE] - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities
�
�
WP 1B
�
�
2013-06-21
�
[ 318 ]
�
�
Liaison statement to Working Parties 4A, 4C, 5A, 5C, 5D, 7B, 7C and 7D - WRC-15 Agenda item 9.1, Issue 9.1.6 - Resolution 957 (WRC-12) - Studies towards review of the definitions of fixed service, fixed station and mobile station
�
�
WP 1B
�
�
2013-06-21
�
[ 317 ]
�
�
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Activities of ITU-T Study Group 5 related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks
�
�
WP 1A
�
�
2013-06-14
�
[ 316 ]
�
�
Liaison statement to ITU-T Study Group 15 for information and action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T G.fast
�
�
WP 1A
�
�
2013-06-14
�
[ 315 ]
�
�
Liaison statement to Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Streamlining future cooperation within ITU-R and liaison with ITU-T
�
�
WP 1A
�
�
2013-06-14
�
[ 314 ]
�
�
Liaison statement to ITU-T Study Group 9 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-T Study Group 5) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - considerations with respect to work on Recommendation ITU-T J.195 (J.HiNoC-req)
�
�
WP 1A
�
�
2013-06-14
�
[ 313 ]
�
�
Liaison statement to Working Party 4A (copy to Working Parties 5A and 7B for information) - WRC-15 Agenda item 1.9.1
�
�
WP 5C
�
�
2013-06-05
�
[ 312 ]
�
�
Reply liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 5A, 5C and 5D for information) - Preparations for WRC-15 Agenda item 1.1 - Additional technical and operational characteristics
�
�
WP 5B
�
�
2013-06-11
�
[ 311 ]
�
�
Liaison statement to Working Parties 5A and 5D and ITU-T Study Groups 13 and 15 - Development of a draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial mobile broadband systems
�
�
WP 5C
�
�
2013-06-04
�
[ 310 ]
�
�
Liaison statement to Working Parties 5A and 5D (copy to Working Party 5B) - Studies on availability of frequency bands and/or tuning ranges for worldwide and/or regional harmonization and conditions for their use by terrestrial electronic news gathering systems
�
�
WP 5C
�
�
2013-06-04
�
[ 309 ]
�
�
Liaison statement to Working Parties 5A and 5B - Potential impact to the fixed service from automotive collision avoidance radar in adjacent frequency bands 76-77 GHz and 77-81 GHz
�
�
WP 5C
�
�
2013-06-04
�
[ 308 ]
�
�
Liaison statement to Working Party 7B (copy to Working Party 5A and Working Party 5B for information) - Revision of Recommendation ITU-R SA.1626 - Feasibility of sharing between the space research service (space-to-Earth) and the fixed and mobile services in the band 14.8-15.35 GHz
�
�
WP 5C
�
�
2013-06-04
�
[ 307 ]
�
�
Liaison statement to Working Parties 5A and 7B - Description of certain electronic news gathering (ENG) systems operating in the 2 025-2 110 MHz band
�
�
WP 5C
�
�
2013-06-04
�
[ 306 ]
�
+Ann.1-28 �
Report on the eleventh meeting of Working Party 5A (Geneva, 20-30 May 2013)
�
�
Chairman, WP 5A
�
�
2013-05-30
�
[ 305 ]
�
(Rev.1) �
Final list of participants - Working Party 5A (20-30 May 2013)
�
�
Director, BR
�
�
2013-05-30
�
[ 304 ]
�
�
Results of the 20th RAG meeting
�
�
Chairman, SG 5
�
�
2013-05-27
�
[ 303 ]
�
�
Report on relevant activities in certain countries in Region 1
�
�
Liaison Rapporteur
�
�
2013-05-24
�
[ 302 ]
�
�
Liaison statement to Working Parties 5A, 5C and 4C - (WRC-15 Agenda item 1.16)
�
�
WP 5B
�
�
2013-05-24
�
[ 301 ]
�
�
Reply liaison statement to Working Party 5A - Information on stations in the aeronautical mobile service operating near 5 450 kHz for consideration in studies under WRC-15 Agenda item 1.4
�
�
WP 5B
�
�
2013-05-24
�
[ 300 ]
�
�
Liaison statement to the JCA-AHF (copy for information to ITU-R WPs 1A, 1B, 5A, 5C and 6A, ITU-T FG-AVA, SGs 2 and 16, ITU-D SGs 1 and 2 and ETSI ERM TG 17) - Reply liaison statement on draft revision of Recommendation ITU-R M.1076
�
�
WP 5B
�
�
2013-05-24
�
[ 299 ]
�
�
Liaison statement on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHF frequency range (COM 16-LS 14) [to ITU-R WP 5A and ITU-T SG 16]
�
�
ITU-T JCA-AHF
�
�
2013-05-23
�
[ 298 ]
�
(Rev.1) �
List of documents issued (Documents 5A/198 - 298)
�
�
BR Study Groups Department
�
�
2013-05-17
�
[ 297 ]
�
�
Report on relevant activities in certain countries in Region 3
�
�
Liaison Rapporteur
�
�
2013-05-16
�
[ 296 ]
�
�
Report on the recent activities of Wireless World Research Forum (WWRF)
�
�
WWRF Liaison Rapporteur
�
�
2013-05-16
�
[ 295 ]
�
�
Liaison statement to Working Party 5A - WRC-15 Agenda item 1.6
�
�
WP 4A
�
�
2013-05-16
Resultats:744 documents R�sultats :�
Pr�c�dent �-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
�-�Suivant
�
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):