Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP5A : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP5A� C�

UIT-R�WP5A

Service mobile terrestre au-dessus de 30 MHz* (� l�exclusion des IMT); acc�s hertzien dans le service fixe; service d�amateur et service d�amateur par satellite

Resultats:744 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 �-�Suivant Next
Contributions��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 344 ]
Liaison statement to Working Party 5C (copy to Working Parties 5A and 7B for information) - WRC-15 agenda item 1.9.1 � WP 4A 2013-10-22
[ 343 ]
Liaison statement to Working Party 5A - WRC-15 agenda item 1.6 � WP 4A 2013-10-22
[ 342 ]
Liaison statement to Working Party 1B on development of a draft new Report ITU-R SM.[WHITE-SPACE] - (Copy to Working Party 5A for information) - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities � WP 5D 2013-10-18
[ 341 ]
Response to the liaison statement from ITU-R Working Party 5A on the work towards a preliminary draft new Recommendation ITU-R M.[V2X] - Radio interface standards of vehicle-to-vehicle and vehicle-to-infrastructure communication for intelligent transport systems applications � European Telecommunications Standards Institute 2013-10-14
[ 340 ]
Liaison statement to Working Party 5B (copy to Working Parties 5A and 5C) - WRC-15 agenda item 1.16 - VDES satellite component � WP 4C 2013-10-07
[ 339 ]
Liaison statement on draft revision of Recommendation ITU-R M.1076 "Wireless communication systems for persons with impaired hearing" (reply to Document 5B/110) � ITU-T JCA-AHF 2013-10-03
[ 338 ]
Liaison statement on nomination of JCA-AHF representatives � ITU-T JCA-AHF 2013-10-02
[ 337 ]
Answer to liaison statement to PPDR External Organizations on the technologies for public protection and disaster relief communications associated with work on WRC-15 agenda item 1.3 � Alcatel-Lucent France , Alcatel-Lucent Shanghai Bell , Alcatel-Lucent USA Inc. , AT&T, Inc. , Hitachi, Ltd. , Huawei Technologies Co. Ltd. , Intel Corporation , NEC Corporation , Samsung Electronics Co., Ltd. 2013-09-30
[ 336 ]
Liaison statement to Working Party 4A and the Special Committee - (copy for information to Working Parties 5A and 6A) - WRC-15 agenda item 9.1 (9.1.8) � WP 7B 2013-09-24
[ 335 ]
Liaison statement to Working Party 5A - WRC-15 agenda item 1.12 � WP 7C 2013-09-20
[ 334 ]
Recommendation ITU-R SM.1541-5 - Unwanted emissions in the out-of-band domain � SG 1 2013-09-19
[ 333 ]
Liaison statement to ITU-R WP 5A on CRS � Asia-Pacific Telecommunity 2013-09-18
[ 332 ]
Liaison statement to ITU-R WP 5A � Asia-Pacific Telecommunity 2013-09-18
[ 331 ]
Liaison statement to ITU-R Working Parties 5A, 5B, 5D and Joint Task Group 4-5-6-7 - WRC-15, agenda item 1.1 - Additional comments in relation to frequency bands identified by ITU-R for future assessment of the suitability for IMT � International Maritime Organization 2013-09-13
[ 330 ]
Information on the preparation of texts for the draft CPM Report to WRC-15 � Chairman, CPM-15 2013-09-10
[ 329 ]
Liaison statements on new versions of the Access Network Transport (ANT) Standardization overview and Work plan � ITU-T SG 15 2013-07-25
[ 328 ]
Liaison statement on determination of the ITU-T G.fast PSD specification � ITU-T SG 15 2013-07-24
[ 327 ]
Liaison statement to Working Party 5C and ITU-T Study Groups 13 and 15 (copy for information to Working Party 5A) on development of a draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial mobile broadband systems � WP 5D 2013-07-22
[ 326 ]
Liaison statement to Working Parties 5A and 5C - Improved sectoral antenna pattern approximations in Recommendation ITU-R F.1336 � WP 5D 2013-07-22
[ 325 ]
Liaison statement to ITU-T Study Group 5 (Question 14/5) (copy to ITU-D Study Group 2 and ITU-R Working Party 5A for information) - Use of spectrum and radio technology low cost sustainable telecommunication infrastructure for rural communications in developing countries � WP 5D 2013-07-22
[ 324 ]
Liaison statement to ITU-T Study Group 13 Question 16/13 (copy to ITU-R Study Group 1 and for information to Working Parties 5A, 5B and 5C) � WP 5D 2013-07-22
[ 323 ]
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 1A, 1B, 4A and 5A for information) - Status of compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments � WP 5D 2013-07-17
[ 322 ]
(Rev.1)
Liaison statement to Working Party 5A - Compatibility predictions at 5 MHz � WP 3L 2013-07-01
[ 321 ]
Liaison statement to Working Parties 5A and 6A, and HFCC - Revisions to Recommendation ITU-R P.842 � WP 3L 2013-07-01
[ 320 ]
Liaison statement to the CCV (copy to Working Party 5A) - Definition and translation of the term "white space" � WP 1B 2013-06-24
[ 319 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[WHITE-SPACE] - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities � WP 1B 2013-06-21
[ 318 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5C, 5D, 7B, 7C and 7D - WRC-15 Agenda item 9.1, Issue 9.1.6 - Resolution 957 (WRC-12) - Studies towards review of the definitions of fixed service, fixed station and mobile station � WP 1B 2013-06-21
[ 317 ]
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Activities of ITU-T Study Group 5 related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks � WP 1A 2013-06-14
[ 316 ]
Liaison statement to ITU-T Study Group 15 for information and action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T G.fast � WP 1A 2013-06-14
[ 315 ]
Liaison statement to Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Streamlining future cooperation within ITU-R and liaison with ITU-T � WP 1A 2013-06-14
[ 314 ]
Liaison statement to ITU-T Study Group 9 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-T Study Group 5) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - considerations with respect to work on Recommendation ITU-T J.195 (J.HiNoC-req) � WP 1A 2013-06-14
[ 313 ]
Liaison statement to Working Party 4A (copy to Working Parties 5A and 7B for information) - WRC-15 Agenda item 1.9.1 � WP 5C 2013-06-05
[ 312 ]
Reply liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 5A, 5C and 5D for information) - Preparations for WRC-15 Agenda item 1.1 - Additional technical and operational characteristics � WP 5B 2013-06-11
[ 311 ]
Liaison statement to Working Parties 5A and 5D and ITU-T Study Groups 13 and 15 - Development of a draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial mobile broadband systems � WP 5C 2013-06-04
[ 310 ]
Liaison statement to Working Parties 5A and 5D (copy to Working Party 5B) - Studies on availability of frequency bands and/or tuning ranges for worldwide and/or regional harmonization and conditions for their use by terrestrial electronic news gathering systems � WP 5C 2013-06-04
[ 309 ]
Liaison statement to Working Parties 5A and 5B - Potential impact to the fixed service from automotive collision avoidance radar in adjacent frequency bands 76-77 GHz and 77-81 GHz � WP 5C 2013-06-04
[ 308 ]
Liaison statement to Working Party 7B (copy to Working Party 5A and Working Party 5B for information) - Revision of Recommendation ITU-R SA.1626 - Feasibility of sharing between the space research service (space-to-Earth) and the fixed and mobile services in the band 14.8-15.35 GHz � WP 5C 2013-06-04
[ 307 ]
Liaison statement to Working Parties 5A and 7B - Description of certain electronic news gathering (ENG) systems operating in the 2 025-2 110 MHz band � WP 5C 2013-06-04
[ 306 ]
+Ann.1-28
Report on the eleventh meeting of Working Party 5A (Geneva, 20-30 May 2013) � Chairman, WP 5A 2013-05-30
[ 305 ]
(Rev.1)
Final list of participants - Working Party 5A (20-30 May 2013) � Director, BR 2013-05-30
[ 304 ]
Results of the 20th RAG meeting � Chairman, SG 5 2013-05-27
[ 303 ]
Report on relevant activities in certain countries in Region 1 � Liaison Rapporteur 2013-05-24
[ 302 ]
Liaison statement to Working Parties 5A, 5C and 4C - (WRC-15 Agenda item 1.16) � WP 5B 2013-05-24
[ 301 ]
Reply liaison statement to Working Party 5A - Information on stations in the aeronautical mobile service operating near 5 450 kHz for consideration in studies under WRC-15 Agenda item 1.4 � WP 5B 2013-05-24
[ 300 ]
Liaison statement to the JCA-AHF (copy for information to ITU-R WPs 1A, 1B, 5A, 5C and 6A, ITU-T FG-AVA, SGs 2 and 16, ITU-D SGs 1 and 2 and ETSI ERM TG 17) - Reply liaison statement on draft revision of Recommendation ITU-R M.1076 � WP 5B 2013-05-24
[ 299 ]
Liaison statement on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHF frequency range (COM 16-LS 14) [to ITU-R WP 5A and ITU-T SG 16] � ITU-T JCA-AHF 2013-05-23
[ 298 ]
(Rev.1)
List of documents issued (Documents 5A/198 - 298) � BR Study Groups Department 2013-05-17
[ 297 ]
Report on relevant activities in certain countries in Region 3 � Liaison Rapporteur 2013-05-16
[ 296 ]
Report on the recent activities of Wireless World Research Forum (WWRF) � WWRF Liaison Rapporteur 2013-05-16
[ 295 ]
Liaison statement to Working Party 5A - WRC-15 Agenda item 1.6 � WP 4A 2013-05-16
Resultats:744 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2020-12-17