Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 513 ]
�
� |
Proposed update for "Optical Transport Networks & Technologies Standardization Work Plan"
�
� |
NTT
� |
Q3/15
� |
2007-05-25 |
|
[ 512 ]
�
� |
A proposed modification to the response to DNR in G.8031v2
�
� |
ETRI
� |
Q9/15
� |
2007-05-25 |
|
[ 511 ]
�
� |
G.vdsl: Update of the channel estimation matrix during the insertion of a new user
�
� |
France Telecom
� |
Q4/15
� |
2007-05-25 |
|
[ 510 ]
�
� |
Correspondence activity on the alignment of nomenclature in G.666 and G.650.2
�
� |
Deutsche Telekom
� |
Q5/15, Q7/15
� |
2007-05-25 |
|
[ 509 ]
�
� |
Appendix I of G.666: Polarisation control in front of the PMD emulator
�
� |
Deutsche Telekom
� |
Q7/15
� |
2007-05-25 |
|
[ 508 ]
�
� |
Upgradeability considerations for Supplement G.Sup.41
�
� |
France Telecom
� |
Q8/15
� |
2007-05-25 |
|
[ 507 ]
�
� |
Proposal to Update IETF RFC Reference in G.7712
�
� |
Cisco Systems Inc.
� |
Q14/15
� |
2007-05-25 |
|
[ 506 ]
�
� |
Explanation of G.pacxyz structure for the scope chapter of the recommendations
�
� |
Deutsche Telekom
� |
Q13/15
� |
2007-05-25 |
|
[ 505 ]
�
� |
Synchronization signal and E-SSM path continuity
�
� |
Cisco
� |
Q13/15
� |
2007-05-25 |
|
[ 504 ]
�
� |
Option for E-OAM supporting E-SSM transmission
�
� |
Cisco
� |
Q13/15
� |
2007-05-25 |
|
[ 503 ]
�
� |
G.VDSL: Further information for the SOS proposal
�
� |
Sumitomo Electric Industries Ltd.,
,
NEC Corporation
� |
Q4/15
� |
2007-05-25 |
|
[ 502 ]
�
� |
G.VDSL,Ploam: Modifications in G.993.2 and G.997.1 for SOS functionality
�
� |
Sumitomo Electric Industries Ltd.,
,
NEC Corporation
� |
Q4/15
� |
2007-05-25 |
|
[ 501 ]
�
� |
G.gen: ADSL PEIN Events Captured on BT Lines
�
� |
BT
� |
Q4/15
� |
2007-05-24 |
|
[ 500 ]
�
� |
Proposals for EEC Network Limits (Clause 7.2.1 in G.8261)
�
� |
Ericsson
� |
Q13/15
� |
2007-05-24 |
|
[ 499 ]
�
� |
Proposals for EEC Jitter Limits in G.paclock
�
� |
Ericsson
� |
Q13/15
� |
2007-05-24 |
|
[ 498 ]
�
� |
Proposals for Appendix IX in G.8261
�
� |
Ericsson
� |
Q13/15
� |
2007-05-24 |
|
[ 497 ]
�
� |
Proposals for Test Cases in appendix VI in G.8261
�
� |
Ericsson
� |
Q13/15
� |
2007-05-24 |
|
[ 496 ]
�
� |
Proposals for clause 8.1 in G.8261
�
� |
Ericsson
� |
Q13/15
� |
2007-05-24 |
|
[ 495 ]
�
� |
Proposals for models in Appendix V in G.8261
�
� |
Ericsson
,
Cisco
� |
Q13/15
� |
2007-05-24 |
|
[ 494 ]
�
� |
Proposal to include PMD limit of 40G system for several modulation formats in G.696.1
�
� |
NTT
� |
Q6/15
� |
2007-05-24 |
|
[ 493 ]
�
� |
Proposed modification for G.8131 Amendment
�
� |
Fujitsu
� |
Q9/15
� |
2007-05-24 |
|
[ 492 ]
�
� |
Consideration on T-MPLS connections and its server layer
�
� |
Fujitsu
� |
Q12/15
� |
2007-05-24 |
|
[ 491 ]
�
� |
Proposed update for G.8112
�
� |
Fujitsu
� |
Q12/15, Q11/15
� |
2007-05-24 |
|
[ 490 ]
�
� |
Consideration for GFP UPI in T-MPLS and MPLS
�
� |
Fujitsu
� |
Q11/15
� |
2007-05-24 |
|
[ 489 ]
�
� |
APS protocol for Ethernet Ring Protection (G.8032)
�
� |
Fujitsu
� |
Q9/15
� |
2007-05-24 |
|
[ 488 ]
�
� |
Comments and proposed modification for draft G.8132
�
� |
Fujitsu
� |
Q9/15
� |
2007-05-24 |
|
[ 487 ]
�
� |
Proposed work plan for Q9
�
� |
Fujitsu
� |
Q9/15
� |
2007-05-24 |
|
[ 486 ]
�
� |
Comments on APS MEG level in G.8032
�
� |
Hitachi
� |
Q9/15
� |
2007-05-24 |
|
[ 485 ]
�
� |
Proposal of text modification in G.8031
�
� |
Hitachi
� |
Q9/15
� |
2007-05-24 |
|
[ 484 ]
�
� |
Comment on Connectivity Monitoring in G.8011.4
�
� |
Hitachi
� |
Q11/15
� |
2007-05-24 |
|
[ 483 ]
�
� |
Proposed structure for G.pacmod
�
� |
Nortel
� |
Q13/15
� |
2007-05-24 |
|
[ 482 ]
�
� |
Clarification to sections in current draft of G.paclock
�
� |
Nortel
� |
Q13/15
� |
2007-05-24 |
|
[ 481 ]
�
� |
Additional considerations for specification of STM-256 jitter in G.783 and G.825
�
� |
Nortel
� |
Q13/15
� |
2007-05-24 |
|
[ 480 ]
�
� |
SSM processing time considerations
�
� |
Nortel
� |
Q13/15
� |
2007-05-24 |
|
[ 479 ]
�
� |
G.vdsl: VDSL2 FEXT Cancellation Performance Estimates in Remote Deployments
�
� |
Actelis Networks
� |
Q4/15
� |
2007-05-24 |
|
[ 478 ]
�
� |
Request for Home Nework study in SG15
�
� |
Japan
� |
Q1/15
� |
2007-05-24 |
|
[ 477 ]
�
� |
ADSL2plus Performance Impact Experiments with L2 Mode Fluctuating Crosstalk
�
� |
BT
� |
Q4/15
� |
2007-05-24 |
|
[ 476 ]
�
� |
Powerline Channel Data
�
� |
Intel Corp.
,
Intellon Corp.
,
Gigle Semiconductor
,
Conexant Systems, Inc.
� |
Q4/15
� |
2007-05-24 |
|
[ 475 ]
�
� |
G.hn System Requirements
�
� |
Intel Corp.
� |
Q4/15
� |
2007-05-24 |
|
[ 474 ]
�
� |
A proposed modification to Signal Degrade in G.8031v2
�
� |
ETRI
� |
Q9/15
� |
2007-05-24 |
|
[ 473 ]
�
� |
G.hn: A Proposal to incorporate CCMP encryption for Network Security
�
� |
Infineon Technologies AG
� |
Q4/15
� |
2007-05-24 |
|
[ 472 ]
�
� |
Relations between interface types of Packet Transport Networks
�
� |
Deutsche Telekom
� |
Q11/15
� |
2007-05-24 |
|
[ 471 ]
�
� |
VS Technical Clarification
�
� |
Huawei Technologies Co., Ltd
,
China Telecom Co., Ltd
� |
Q12/15
� |
2007-05-24 |
|
[ 470 ]
�
� |
Trigger events for auditing process
�
� |
Huawei Technologies Co., Ltd
� |
Q14/15
� |
2007-05-24 |
|
[ 469 ]
�
� |
1+1/1:1 protection switching mechanism for RMPS
�
� |
Huawei Technologies Co., Ltd
� |
Q9/15
� |
2007-05-24 |
|
[ 468 ]
�
� |
Requirement of partial protection switching for RMPS
�
� |
Huawei Technologies Co., Ltd
� |
Q9/15
� |
2007-05-24 |
|
[ 467 ]
�
� |
Proposal for an over-clocked OTN structure (supplement) recommendation
�
� |
Huawei Technologies Co., Ltd
� |
Q11/15
� |
2007-05-24 |
|
[ 466 ]
�
� |
Proposals for multi-lane 100GE transport
�
� |
Huawei
� |
Q11/15
� |
2007-05-24 |
|
[ 465 ]
�
� |
Proposal on OAM model and Ring APS for Ethernet ring protection
�
� |
Huawei
� |
Q9/15
� |
2007-05-24 |
|
[ 464 ]
�
� |
Proposal on OAM Model for T-MPLS SPRing
�
� |
Huawei Technologies Co., Ltd
� |
Q9/15
� |
2007-05-24 |
Resultados :913 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):