Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 40 ]
�
� |
Comments and modifications to ODN reference architecture in G.multi
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 39 ]
�
� |
FEC NCG in G.Sup39
�
� |
ZTE Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
� |
Q6/15
� |
2013-06-13 |
|
[ 38 ]
�
� |
The improvement of 8B10B line coding of CPRI in G.989.2 Annex A
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 37 ]
�
� |
The requirement of CPRI signal transmission over P2P WDM system in G.989.2 Annex A
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 36 ]
�
� |
Proposal for ONU Activation in dual rate NGPON2
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 35 ]
�
� |
Proposal for dual-rate implementation on NGPON2 PMD
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 34 ]
�
� |
Proposal for administrate channel amendment for dual rate NGPON2
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 33 ]
�
� |
Amendment for bandwidth map in dual rate NGPON2
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2013-06-13 |
|
[ 32 ]
�
� |
Considerations about requirement of beyond 100G in G.sup39
�
� |
ZTE Corporation
� |
Q6/15
� |
2013-06-13 |
|
[ 31 ]
�
� |
Boundary conditions for metro applications in G.698.2
�
� |
Nokia Siemens Networks GmbH & Co. KG
� |
Q6/15
� |
2013-06-12 |
|
[ 30 ]
�
� |
Improvements of G.672
�
� |
Nokia Siemens Networks GmbH & Co. KG
� |
Q7/15
� |
2013-06-12 |
|
[ 29 ]
�
� |
BT proposed revisions to ITU-T G.652 Recommendation
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q5/15
� |
2013-06-12 |
|
[ 28 ]
�
(Rev.1)� |
Spectral excursion measurements for 100Gb/s DP-QPSK signals
�
� |
ADVA Optical Networking
� |
Q6/15
� |
2013-06-06 |
|
[ 27 ]
�
� |
B100G - Power Saving
�
� |
Telefon AB - LM Ericsson
� |
Q6/15, Q11/15
� |
2013-06-05 |
|
[ 26 ]
�
� |
Including Non-Orthogonal SCM in G.Sup.39
�
� |
Telefon AB - LM Ericsson
� |
Q6/15
� |
2013-06-04 |
|
[ 25 ]
�
� |
Participation of African consumers in ITU's standardization work
�
� |
R�CATIC
� |
BSG/15
� |
2013-06-04 |
|
[ 24 ]
�
� |
G.8275.1: Proposed Updates to the Alternate BMCA
�
� |
Juniper Networks
� |
Q13/15
� |
2013-06-04 |
|
[ 23 ]
�
� |
B100G multiplexing hierarchy
�
� |
ZTE Corporation
� |
Q11/15
� |
2013-06-03 |
|
[ 22 ]
�
� |
B100G FEC consideration
�
� |
ZTE Corporation
� |
Q6/15, Q11/15
� |
2013-06-03 |
|
[ 21 ]
�
� |
B100G bit rate option
�
� |
ZTE Corporation
� |
Q11/15
� |
2013-06-03 |
|
[ 20 ]
�
� |
B100G multiplexing consideration
�
� |
ZTE Corporation
� |
Q11/15
� |
2013-06-03 |
|
[ 19 ]
�
� |
B100G minimum OCh rate
�
� |
China Telecommunications Corporation
,
ZTE Corporation
� |
Q6/15, Q11/15
� |
2013-06-03 |
|
[ 18 ]
�
� |
Text Changes in G.8021 for At Risk signalling
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q14/15, Q10/15
� |
2013-05-31 |
|
[ 17 ]
�
� |
Text changes in Y.1731 for At Risk signalling
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q10/15
� |
2013-05-31 |
|
[ 16 ]
�
� |
"At Risk" signalling in Y.1731 Ethernet OAM
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q14/15, Q10/15
� |
2013-05-31 |
|
[ 15 ]
�
(Rev.1)� |
Some considerations for modelling Sub-lambda photonic switched networks (SLPSN)
�
� |
France T�l�com Orange
,
Huawei Technologies Co. Ltd.
,
Portugal Telecom, SGPS, S.A.
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telef�nica, S.A.
,
Telstra Corporation Ltd.
,
Verizon Communication Corporation
� |
Q12/15
� |
2013-05-31 |
|
[ 14 ]
�
� |
LCK/AIS Reception Process in G.8121.2
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q10/15
� |
2013-05-29 |
|
[ 13 ]
�
� |
Modelling of OTN Delay Measurement
�
� |
Alcatel-Lucent USA Inc.
,
Deutsche Telekom AG
� |
Q14/15
� |
2013-05-29 |
|
[ 12 ]
�
� |
Clarification regarding Dataplane Loopback in G.8121.2
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q10/15
� |
2013-05-29 |
|
[ 11 ]
�
� |
Clarification regarding Dataplane Loopback in G.8121
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q10/15
� |
2013-05-29 |
|
[ 10 ]
�
� |
Definition of Diagnostic Adapted Information in G.8121
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q12/15, Q10/15
� |
2013-05-29 |
|
[ 9 ]
�
� |
Description of Sub-processes in G.8121.2
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q10/15
� |
2013-05-29 |
|
[ 8 ]
�
� |
Comparison of sub-process in Clause 8.8 between G.8121.1 and G.8121.2
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q10/15
� |
2013-05-29 |
|
[ 7 ]
�
� |
Proposed Text for Clauses 3 and 5 in G.8121.2
�
� |
Cisco Systems, Inc.
� |
Q9/15, Q10/15
� |
2013-05-29 |
|
[ 6 ]
�
� |
Minor corrections in Y.1731 Clause 9
�
� |
Cisco Systems, Inc.
� |
Q10/15
� |
2013-05-28 |
|
[ 5 ]
�
� |
Allocation of Y.1731 TLV Types for MEF Control Protocols
�
� |
Alcatel-Lucent USA Inc.
,
Cisco Systems, Inc.
� |
Q9/15, Q10/15
� |
2013-05-28 |
|
[ 4 ]
�
� |
Assigning Y.1731 OpCodes for MEF Control Protocols
�
� |
Alcatel-Lucent USA Inc.
,
Cisco Systems, Inc.
� |
Q9/15, Q10/15
� |
2013-05-28 |
|
[ 3 ]
�
� |
Proposal for single OCh's minimum rate for B100G OTN
�
� |
China Unicom
� |
Q11/15
� |
2013-05-28 |
|
[ 2 ]
�
(Rev.1)� |
Fibre optic infrastructure indoor and outdoor installation solution for developing cities.
�
NOTE - The original file was uploaded in error. The correct file is posted as Rev.1.
� |
Rwanda Utilities Regulatory Authority (RURA)
� |
Q16/15
� |
2013-05-23 |
|
[ 1 ]
�
� |
Questions assigned to ITU-T Study Group 15 by WTSA-12
�
� |
WTSA-12
� |
QALL/15
� |
2012-12-19 |
Results:440 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
� |
Multiple Document Download:�Formats and Languages to be included (when available):