Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1990 ]
�
� |
OTUk-AIS Clarifications
�
� |
Altera Newfoundland Technology Centre (Altera NTC)
� |
Q9/15, Q11/15
� |
2012-08-22 |
|
[ 1989 ]
�
� |
OTLAIS Removal from OTU AIS
�
� |
Altera Newfoundland Technology Centre (Altera NTC)
� |
Q9/15
� |
2012-08-22 |
|
[ 1988 ]
�
� |
ODUkT_TT_Sk STAT Defect Conditions
�
� |
Altera Newfoundland Technology Centre (Altera NTC)
� |
Q9/15
� |
2012-08-22 |
|
[ 1987 ]
�
� |
G.8272 latest draft editorial comments
�
� |
Integrated Device Technology (IDT)
� |
Q13/15
� |
2012-08-22 |
|
[ 1986 ]
�
� |
G.8272 Summary
�
� |
Integrated Device Technology (IDT)
� |
Q13/15
� |
2012-08-22 |
|
[ 1985 ]
�
� |
Time Error Budget to Allocate to Error Inside BC [G.8271 / G.8273.2]
�
� |
Microsemi Semiconductor Corporation
� |
Q13/15
� |
2012-08-22 |
|
[ 1984 ]
�
� |
Thoughts on Options for Syntonization of T-BC without SyncE / T-BC Models
�
� |
Microsemi Semiconductor Corporation
� |
Q13/15
� |
2012-08-22 |
|
[ 1983 ]
�
� |
Move Metrics from G.8261 to G.8260
�
� |
Microsemi Semiconductor Corporation
� |
Q13/15
� |
2012-08-22 |
|
[ 1982 ]
�
� |
Holdover Requirement [G.8263]
�
� |
Microsemi Semiconductor Corporation
� |
Q13/15
� |
2012-08-22 |
|
[ 1981 ]
�
� |
Temperature Profile Appendix [G.8263]
�
� |
Microsemi Semiconductor Corporation
� |
Q13/15
� |
2012-08-22 |
|
[ 1980 ]
�
� |
Proposed Liaison on Control Plane and Data Plane
�
� |
Ciena Canada
� |
Q12/15
� |
2012-08-22 |
|
[ 1979 ]
�
� |
Spectral excursion for advanced modulation formats in G.698.2
�
� |
Ciena Canada
� |
Q6/15
� |
2012-08-22 |
|
[ 1978 ]
�
� |
Comments on G.8032 Supplement
�
� |
Ericsson Canada, Inc.
� |
Q9/15
� |
2012-08-22 |
|
[ 1977 ]
�
� |
Comments on IEEE liaison on MECP
�
� |
Ericsson Canada, Inc.
� |
Q9/15
� |
2012-08-22 |
|
[ 1976 ]
�
� |
Example of changes to G.8021 to support enhanced holdover
�
� |
Ciena Canada
� |
Q13/15
� |
2012-08-22 |
|
[ 1975 ]
�
� |
Further considerations on PRTC modelling
�
� |
Ciena Canada
� |
Q13/15
� |
2012-08-22 |
|
[ 1974 ]
�
� |
Proposal to start work on 40G and 100G applications for G.977 for Submarine Networks
�
� |
Xtera Communications, Inc.
� |
Q8/15
� |
2012-08-22 |
|
[ 1973 ]
�
� |
Use of G.805 to model PRTC and BC clocks
�
� |
Ciena Canada
� |
Q13/15
� |
2012-08-22 |
|
[ 1972 ]
�
� |
G.8113.2
�
� |
Canada
� |
Q10/15
� |
2012-08-22 |
|
[ 1971 ]
�
(Rev.1)� |
Consolidation of G.873.1 and G.798 in respect to ODUk SNCP
�
� |
Alcatel-Lucent Deutschland AG
� |
Q9/15
� |
2012-08-22 |
|
[ 1970 ]
�
(Rev.1)� |
Backward compatible precise delay measurement method for OTN
�
� |
Alcatel-Lucent Deutschland AG
� |
Q9/15, Q11/15
� |
2012-08-22 |
|
[ 1969 ]
�
� |
G.873.1: Control of the Bridge for 1:N ODUk SNCP
�
� |
Alcatel-Lucent Deutschland AG
� |
Q9/15
� |
2012-08-22 |
|
[ 1968 ]
�
� |
G.873.1: Bidirectional Switching for ODUk SNCP
�
� |
Alcatel-Lucent Deutschland AG
� |
Q9/15
� |
2012-08-22 |
|
[ 1967 ]
�
� |
G.873.1: Usage of Reverse Request for bidirectional 1:n ODUk SNCP
�
� |
Alcatel-Lucent Deutschland AG
� |
Q9/15
� |
2012-08-22 |
|
[ 1966 ]
�
� |
Proposed New G.smp Appendix
�
� |
Alcatel-Lucent Deutschland AG
� |
Q9/15
� |
2012-08-22 |
|
[ 1965 ]
�
� |
Request for Response to OIF Liaison Statement (oif2012.265.02) a
�
� |
Alcatel-Lucent USA Inc.
,
Xtera Communications, Inc.
� |
Q9/15, Q14/15
� |
2012-08-22 |
|
[ 1964 ]
�
� |
Proposed modification to existing Flyer "Optical Fibre and Cable"
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q5/15
� |
2012-08-20 |
|
[ 1963 ]
�
� |
Consideration on OTL interface for OTU5
�
� |
Fujitsu Limited
� |
Q11/15
� |
2012-08-17 |
|
[ 1962 ]
�
� |
Flexible high speed interfaces
�
� |
Ericsson UK
� |
Q11/15
� |
2012-08-16 |
|
[ 1961 ]
�
� |
Traffic Differentiation in Transport Networks
�
� |
Ericsson UK
� |
Q9/15, Q12/15
� |
2012-08-16 |
|
[ 1960 ]
�
� |
Self Configuring Networks
�
� |
Ericsson UK
� |
Q9/15
� |
2012-08-16 |
|
[ 1959 ]
�
(Rev.1)� |
Bandwidth- Load sharing
�
� |
Ericsson UK
� |
Q9/15
� |
2012-08-16 |
|
[ 1958 ]
�
(Rev.1)� |
G.8273.2: Discussion on text for Sections 6 through 9.
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2012-08-15 |
|
[ 1957 ]
�
� |
Examples for ODU SMP scenarios
�
� |
Huawei Technologies Co. Ltd.
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q9/15
� |
2012-08-14 |
|
[ 1956 ]
�
� |
Proposal for determined text G.9955 Annex A : Interleaver
�
� |
ERDF
,
STMicroelectronics
� |
Q4C/15
� |
2012-08-12 |
|
[ 1955 ]
�
(Rev.1)� |
Proposal for consented text G.9956 Annex A - Cor1 : Timestamp definition
�
� |
ERDF
,
STMicroelectronics
� |
Q4C/15
� |
2012-08-12 |
|
[ 1954 ]
�
� |
Proposal for consented text G.9956 Annex A - Cor1 : Short Address in Neighbour table
�
� |
ERDF, STMicroelectronics
,
STMicroelectronics
� |
Q4C/15
� |
2012-08-11 |
|
[ 1953 ]
�
� |
Introducing the concept of security in G.697
�
� |
Telefon AB - LM Ericsson
� |
Q6/15
� |
2012-08-10 |
|
[ 1952 ]
�
� |
Considerations about security at the optical layer
�
� |
Telefon AB - LM Ericsson
� |
Q6/15
� |
2012-08-10 |
|
[ 1951 ]
�
� |
Not used
�
Withdrawn: Reposted as TD677/PLEN
� |
N/A
� |
� |
2012-08-09 |
|
[ 1950 ]
�
� |
Not used
�
Withdrawn: Reposted as TD676/PLEN
� |
N/A
� |
� |
2012-08-09 |
|
[ 1949 ]
�
(Rev.1)� |
G.hnem: Proposal for the inclusion of PRIME Service Specific Convergence Layer for IPv6 in consented G.9956 Cor1 Annex B
�
� |
STMicroelectronics
� |
Q4C/15
� |
2012-08-08 |
|
[ 1948 ]
�
(Rev.1)� |
G.8273.3: Noise Error Definition for T-TC to control impact of traffic.
�
� |
Calnex Solutions Limited
,
China Unicom
� |
Q13/15
� |
2012-08-08 |
|
[ 1947 ]
�
(Rev.1)� |
G.8273.2: T-BC Noise Error Definition to control impact of traffic.
�
� |
Calnex Solutions Limited
,
China Unicom
� |
Q13/15
� |
2012-08-08 |
|
[ 1946 ]
�
(Rev.1)� |
G.8273.2: Phase Transient interface applicability.
�
� |
Calnex Solutions Limited
� |
Q13/15
� |
2012-08-08 |
|
[ 1945 ]
�
� |
Comments on Prysmian contribution for the preparation for consent of Rec. G.657
�
� |
Telecom Italia S.p.A.
� |
Q5/15
� |
2012-07-30 |
|
[ 1944 ]
�
� |
Proposed changes to facilitate future approval of draft new Recommendation G.9980 (according to WTSA-08 Resolution 1, Section 9.5.5)
�
� |
Germany
� |
Q4C/15, Q4B/15, Q4A/15, Q2/15, Q1/15
� |
2012-07-13 |
|
[ 1943 ]
�
� |
Germany's considerations regarding the proceedings of draft new Recommendation G.9980
�
� |
Germany
� |
QALL/15
� |
2012-07-10 |
|
[ 1942 ]
�
(Rev.1)� |
ZTE Proposal for L.64 on appendix III and IV
�
� |
ZTE Corporation
� |
Q17/15
� |
2012-07-09 |
|
[ 1941 ]
�
� |
Proposed Revisions to the Appendix III and IV in the Draft Revised Rec. ITU-T L.64
�
� |
Huawei Technologies Co. Ltd.
� |
� |
2012-07-03 |
Results:452 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):