International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2011-02-14�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2011-02-14)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-102012-05-112011-12-052011-09-162010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:418 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 1118 ]
Required information for non-linear effects estimation for Situation 2 of G.680 � ZTE Corporation Q6/15 2011-01-27
[ 1117 ]
Considerations on Maximum spectral excursion and Maximum ripple in G.698.2 � ZTE Corporation Q6/15 2011-01-27
[ 1116 ]
Proposals on granularity of the flexible grids in G.694.1 � ZTE Corporation Q6/15 2011-01-27
[ 1115 ]
Proposal to include additional RIN-related reference point for G.sdapp � ETRI Q6/15 2011-01-27
[ 1114 ]
Future revision of Recommendation ITU-T G.657 � Draka Communications Q5/15 2011-01-26
[ 1113 ]
(Rev.1)
Comments on content of clauses 8 and 9 of G.tpoam � Ericsson Q9/15 2011-01-26
[ 1112 ]
Automatic election of RPL and RPL Owner in G.8032 � Korea (Republic of) Q9/15 2011-01-26
[ 1111 ]
Event message timer for G.8032 interconnected ring � Korea (Republic of) Q9/15 2011-01-26
[ 1110 ]
Proposed text for end-to-end service resilience between Ethernet ring and MPLS-TP ring � Korea (Republic of) Q9/15 2011-01-26
[ 1109 ]
Proposed modification to G.8031/Y.1342 state transition tables for received far-end request � Korea (Republic of) Q9/15 2011-01-26
[ 1108 ]
Hold-off timer operation in G.808.1 � Korea (Republic of) Q9/15 2011-01-26
[ 1107 ]
Proposed modification to G.8031/Y.1342 state transition tables for SD-triggered protection � Korea (Republic of) Q9/15 2011-01-26
[ 1106 ]
40GE&100GE PCS BIP8 monitoring handling requirements in G.798 � China Telecom, Huawei Technologies Q9/15 2011-01-25
[ 1105 ]
Proposal about SD triggered protection switching for packet transport technologies � China Telecom Q9/15 2011-01-25
[ 1104 ]
Further consideration of the adaptive Bandwidth Adjustment scheme � Ericsson Q9/15, Q10/15 2011-01-25
[ 1103 ]
Withdrawn: Corrections to Recommendation ITU-T G.8262 (2010) � Calnex Solutions Q13/15 2011-01-24
[ 1102 ]
Specifying a Boundary Clock performance � Calnex Solutions Q13/15 2011-01-24
[ 1101 ]
Clarification proposal to draft Metrics Appendix text in WD107 � Calnex Solutions Q13/15 2011-01-24
Results:418 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25