International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP-6A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP-6A� C�

ITU-R�WP-6A

Terrestrial Broadcasting Delivery

Results:485 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 85 ]
Proposed revisions to the main body of Report ITU-R BT.2302 � European Broadcasting Union 2020-09-28
[ 84 ]
Preliminary draft revision of Report ITU-R BS.2384-1 - Implementation considerations for the introduction and transition to digital terrestrial sound and multimedia broadcasting � China (People's Republic of) 2020-09-29
[ 83 ]
Preliminary draft revision of Report ITU-R BT.2295-3 - Digital terrestrial broadcasting systems � China (People's Republic of) 2020-09-29
[ 82 ]
Collection of field trials of UHDTV over DTT networks � France 2020-09-28
[ 81 ]
Revision of Report ITU-R BT.2301-2 - National field reports on the introduction of IMT in the bands with co-primary allocation to the broadcasting and the mobile services � France 2020-09-28
[ 80 ]
Preliminary draft revision of Recommendation ITU-R BS.1615 - "Planning parameters" for digital sound broadcasting at frequencies below 30 MHz � United States of America 2020-09-25
[ 79 ]
Information Document: An ATSC 3.0 Broadcast 5G Heterogeneous Network � United States of America 2020-09-25
[ 78 ]
Input on the proposed revision of Report ITU-R BT 2344-2 - Information on technical parameters, operational characteristics and deployment scenarios of SAB/SAP as utilized in broadcasting � United States of America 2020-09-25
[ 77 ]
(Rev.1)
Report of Correspondence Group on activities between February and September 2020 � CG of WP 6A on Rev. Rep. ITU-R BS.2384 and BT.2140 2020-09-23
[ 76 ]
Reply liaison statement to Working Party 1A (copy for information to ITU-R Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7C) - Liaison between ITU-R and CISPR on the protection of radio services in the 6-40 GHz frequency range � WP 7D 2020-09-21
[ 75 ]
(Rev.1)
Report of activities in Correspondence Group � Chairman, CG on Rep./Rec. ITU-R BT.[INTRO-NEWTECH] 2020-09-21
[ 74 ]
Progress Report WRC-23 agenda items 1.4, 1.9, 1.12, and 9.1, topics a) and c) � RG for WRC-23 related AIs AI9.1C), AI9.1A), AI1.9, AI1.4, AI1.12 2020-09-18
[ 73 ]
+Ann.1-5
Report of Rapporteur Group on activities between February and September 2020 � RG on MonteCarloDTT 2020-09-18
[ 72 ]
[Working document towards a ] Preliminary draft revision to Report ITU-R BT.2467 - Methods for the evaluation of the quality of service of second generation DTTB systems � Free TV Australia Ltd. Q132/6 2020-09-16
[ 71 ]
+Ann.2-4
Report of Rapporteur Group on activities between February and September 2020 � RG on WRC-23 AI 1.5 AI1.5 2020-09-16
[ 70 ]
Interim Report on Liaison with CISPR on Protection Requirements for the Broadcasting Service � WP 6A Rapporteur 2020-09-08
[ 69 ]
Initial reply liaison statement to Working Party 5D (copied to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D for information) - WRC-23 agenda item 1.4 � WPs 3J, 3K & 3M AI1.4 2020-08-27
[ 68 ]
Reply liaison statement to Working Party 5B (copied to Working Parties 5A, 5C, 6A and ICAO for information) - WRC-23 agenda item 1.9 - Review of Appendix 27 of the Radio Regulations to accommodate digital aeronautical HF technologies � WP 3L AI1.9 2020-08-27
[ 67 ]
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A - Recommendation ITU-R P.368-9 - Software implementations of ground-wave propagation predictions - GRWAVE and LFMF-SmoothEarth � WP 3L 2020-08-27
[ 66 ]
Liaison statement to Task Group 6/1 (copied to Working Parties 5A, 5B, 5C, 5D and 6A for information) - WRC-23 agenda item 1.5 - Organisation of work of Working Parties 3K and 3M to support Task Group 6/1 � WPs 3K & 3M AI1.5 2020-08-25
[ 65 ]
Liaison statement on new Recommendation ITU-T Y.3531 - Cloud computing functional requirements for machine learning as a service � ITU-T SG13 2020-08-17
[ 64 ]
Liaison statement on invitation to review artificial intelligence standardization roadmap and provide missing or updated information � ITU-T SG13 2020-08-17
[ 63 ]
Brazilian next generation digital terrestrial television (Information Document) � Brazil (Federative Republic of) 2020-08-10
[ 62 ]
Reply liaison statement to Working Party 5D (copied for information to Working Parties 4A, 4C, 5A, 5B, 6A, 7B, 7C and 7D) - WRC-23 agenda item 1.4 � WP 5C AI1.4 2020-08-07
[ 61 ]
Liaison statement to Working Parties 7C (copied to Working Parties 5C and 6A for information) - Preparations for studies under WRC-23 agenda item 1,12 � WP 5A AI1.12 2020-08-06
[ 60 ]
Reply liaison statement to Working Party 7C (copied for information to Working Parties 5A and 6A) - WRC-23 agenda item 1.12 � WP 5C AI1.12 2020-08-06
[ 59 ]
Liaison statement to Working Parties 3L, 3M, 5A, 5C, 6A and ICAO - WRC-23 agenda item 1,9 - Review of Appendix 27 of the Radio Regulations to accommodate digital aeronautical HF technologies � WP 5B AI1.9 2020-08-06
[ 58 ]
Liaison statement on versatile video coding (VVC) � ITU-T SG16 2020-07-23
[ 57 ]
Liaison statement to ITU-R Study Group 6 - Terms and definitions proposed by ITU-T Study Group 16 � CCT 2020-07-21
[ 56 ]
Liaison statement to ITU-R Study Group 6 (copy to ITU-T Study Groups 9 and 12) - Proposal to add the broadcasting term "Quasi error free" to the ITU Terminology Database � CCT 2020-07-21
[ 55 ]
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups) � Chairman, CCV 2020-07-14
[ 54 ]
Reply liaison statement on work being carried out in ITU-T SG5 on human exposure to EMF from ICTS (reply to ITU-D Q7/2 -SG2RGQ/200) � ITU-T SG5 2020-07-13
[ 53 ]
Reply liaison statement on EMF exposure form bonded cellular devices � ITU-T SG5 2020-06-29
[ 52 ]
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups � Director, BR 2020-06-25
[ 51 ]
Reply liaison statement on the new version of the Access Network Transport (ANT) standard overview and work plan � ITU-T SG9 2020-05-27
[ 50 ]
Liaison statement from SC 29/WG11 to ITU-R Working Party 6B on versatile video coding [SC 29/WG 11N 19205] � International Organization for Standardization 2020-05-15
[ 49 ]
Liaison response from CISPR/H to Working Party 6A on their proposal for changes in the radioservices database of IEC � International Special Committee on Radio Interference 2020-05-07
[ 48 ]
(Rev.1)
Liaison statement to Working Parties 5A, 5B, 5C and 6A - Preparations for studies under WRC-23 agenda item 1.12 � WP 7C AI1.12 2020-04-30
[ 47 ]
Input to Working Parties 1C and 3L and to Correspondence Group 3L-7 (copied for information only to Working Parties 1A and 6A) - Revision of Recommendation ITU-R P.372 to take account of man-made noise indoors � European Broadcasting Union 2020-04-16
[ 46 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, and 7D - Information for studies on WRC-23 agenda item 1.4 � WP 5D AI1.4 2020-03-06
[ 45 ]
Liaison statement to Working Party 4A (copy for information to Working Party 6A) - Preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] � WP 5D 2020-03-06
[ 44 ]
Liaison statement on information WTSA-20 preparation � ITU-T SG5 2020-02-24
[ 43 ]
Liaison on the new version of the Home Network Transport (HNT) standards overview and work plan � ITU-T SG15 2020-02-19
[ 42 ]
+Ann.1-19
Report of the meeting of Working Party 6A (Geneva, 4-12 February 2020) � Chairman, WP 6A 2020-02-12
[ 41 ]
Final List of Participants - Working Party 6A (Geneva, 4-12 February 2020) � Director, BR 2020-02-12
[ 40 ]
Liaison statement from Study Group 6 to ITU-T Study Group 13 (To be considered by Working Party 6A and consolidated by WP 6B for SG 6) - Review of Artificial Intelligence Standardization Roadmap and provide missing or updated information � WP 6C 2020-02-07
[ 39 ]
Proposed text for liaison statements via Study Group 6 - Liaisons to ITU-T FG-AI4EE and to ITU-T TSAG and ITU-D TDAG � Chairman, WP 6C 2020-02-05
[ 38 ]
List of documents issued (Documents 6A/1 - 6A/38) � BR, Study Groups Department 2020-02-03
[ 37 ]
(Rev.1)
Update to Working Party 6A (February 2020) � RG on RF Hazard 2020-02-03
[ 36 ]
(Rev.2)
Proposed organization of the work of Study Group 6 � Chairman, SG 6 2020-01-29
Results:485 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2024-03-13