Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 511 ]
�
� |
Proposal for draft CPM Report - WRC-23 agenda item 7, Topic C - Protection of geostationary-satellite networks in the mobile-satellite service operating in the 7/8 GHz and 20/30 GHz bands from emissions of non geostationary-satellite systems operating in the same frequency bands and identical directions
�
� |
Germany (Federal Republic of)
� |
AI7C
� |
2022-09-06 |
|
[ 510 ]
�
� |
Preliminary draft CPM text for WRC-23 agenda item 7, Topic J
�
� |
Germany (Federal Republic of)
� |
AI7J
� |
2022-09-06 |
|
[ 509 ]
�
� |
Updates to working document towards a preliminary draft new Report ITU-R S.[SCALING FACTOR] - Studies on the pfd scaling factor to be applied to non-GSO FSS constellations with 1 000 or more space stations operating in the 17.7-19.3 GHz band
�
� |
Germany (Federal Republic of)
� |
� |
2022-09-06 |
|
[ 508 ]
�
� |
Protection of terrestrial services from interference from earth stations on aircraft under WRC-23 agenda item 1.15
�
� |
Germany (Federal Republic of)
� |
AI1.15
� |
2022-09-06 |
|
[ 507 ]
�
� |
Proposed modifications to preliminary draft CPM text for WRC-23 agenda item 1.15
�
� |
Germany (Federal Republic of)
� |
AI1.15
� |
2022-09-06 |
|
[ 506 ]
�
� |
Revisions to working document on WRC-23 agenda item 1.15 -- Sharing studies between earth stations on aircraft communicating with GSO space stations in the 12.75-13.25 GHz band and non-GSO FSS systems
�
� |
Germany (Federal Republic of)
,
Luxembourg
� |
AI1.15
� |
2022-09-06 |
|
[ 505 ]
�
� |
Proposal on elements on a working document towards a new Recommendation/Report ITU-R S.[MITIGATION MEASURES]
�
� |
Ghana
,
Niger (Republic of the)
� |
� |
2022-09-06 |
|
[ 504 ]
�
� |
Proposed modifications to the preliminary drft CPM text and draft new Resolution for WRC-23 agenda item 1.15
�
� |
Russian Federation
� |
AI1.5
� |
2022-09-06 |
|
[ 503 ]
�
� |
Preliminary draft CPM text for WRC-23 agenda item 1.17
�
� |
European Space Agency
,
EUTMETSAT
� |
AI1.17
� |
2022-09-06 |
|
[ 502 ]
�
� |
reliminary draft CPM text and draft new Resolution for WRC-23 agenda item 1.16
�
� |
European Space Agency
,
EUTMETSAT
� |
AI1.16
� |
2022-09-06 |
|
[ 501 ]
�
� |
Preliminary draft CPM text for WRC-23 agenda item 7, Topic F
�
� |
African Telecommunications Union
� |
AI7F
� |
2022-09-05 |
|
[ 500 ]
�
� |
Preliminary draft CPM text for WRC-23 agenda item 7, Topic H
�
� |
African Telecommunications Union
� |
AI7H
� |
2022-09-05 |
|
[ 499 ]
�
� |
Preliminary draft CPM text for WRC-23 agenda item 7, Topoc I - Special agreements under RR Appendix 30B
�
� |
African Telecommunications Union
� |
AI7I
� |
2022-09-05 |
|
[ 498 ]
�
� |
Preliminary draft CPM text for WRC-23 agenda item 7, Topic E
�
� |
African Telecommunications Union
� |
AI7E
� |
2022-09-05 |
|
[ 497 ]
�
� |
Draft revision to Recommendation ITU-R S.1503-3
�
� |
African Telecommunications Union
� |
AI7D
� |
2022-09-05 |
|
[ 496 ]
�
� |
Preliminary draft CPM text for agenda item 7 Topic D2 - Revisions to Appendix 4 to Support Proposed Revisions to Recommendation ITU-R S.1503-3
�
� |
African Telecommunications Union
� |
AI7D2
� |
2022-09-07 |
|
[ 495 ]
�
� |
Proposals to the preliminary draft CPM text and draft new Resolution for WRC-23 agenda item 1.16
�
� |
N/A
� |
� |
2022-09-06 |
|
[ 494 ]
�
� |
Proposed revision and upgrade of working document towards a preliminary draft new Report on guidance on use of the band 7 025-7 075 MHz for uplink feeder links to satellite digital audio radio service (SDARS) networks for certain countries in Region 2
�
� |
United States of America
� |
� |
2022-09-05 |
|
[ 493 ]
�
� |
Preliminary draft revision to Recommendation ITU-R S.1503-3
�
� |
United States of America
� |
� |
2022-09-05 |
|
[ 492 ]
�
� |
Draft CPM text for agenda item 7 Topic D2 - Revisions to Appendix 4 to Support Proposed Revisions to Recommendation ITU-R S.1503-3
�
� |
United States of America
� |
AI7D
� |
2022-09-05 |
|
[ 491 ]
�
� |
Working document - Proposed updates to Discussions of non-GSO-GSO aggregate interference topics within Working Party 4A and updates towards working document towards a preliminary draft new Report ITU-R S.[AGGREGATE NGSO-GSO INTERFERENCE Q/V] AND Methodology for evaluating aggregate equivalent power flux-density into geostationary satellite networks in the fixed-satellite...
�
� |
United States of America
� |
� |
2022-09-05 |
|
[ 490 ]
�
� |
Proposed updates to preliminary draft CPM text for WRC-23 agenda item 7, Topic J
�
� |
United States of America
� |
AI7J
� |
2022-09-05 |
|
[ 489 ]
�
� |
Sharing studies regarding transmitting non-GSO satellite to satellite link in the frequency band 27.5-30 GHz for the "Within the cone of coverage" scenario under agenda item 1.17
�
� |
United States of America
� |
AI1.17
� |
2022-09-05 |
|
[ 488 ]
�
� |
Preliminary draft CPM text and draft new Resolution for WRC-23 agenda item 1.16
�
� |
United States of America
� |
AI1.16
� |
2022-09-05 |
|
[ 487 ]
�
� |
Working document on WRC-23 agenda item 1.16 [NON-GSO-ESIM] - Operation of earth stations in motion communicating with non-geostationary space stations in the fixed-satellite service allocations at 17.7-18.6 GHz, 18.8-19.3 GHz and 19.7-20.2 GHz (space-to-Earth) and 27.5-29.1 GHz and 29.5-30 GHz (Earth-to-space)
�
� |
United States of America
� |
AI1.16
� |
2022-09-05 |
|
[ 486 ]
�
� |
Proposal for CPM text for WRC-23 agenda item 7, Topic D3
�
� |
United States of America
� |
AI7D3
� |
2022-09-05 |
|
[ 485 ]
�
� |
Methodology for examining characteristics of aeronautical Earth Stations in Motion (ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHz band with respect to conformity with PFD limits
�
� |
United States of America
� |
AI1.5
� |
2022-09-05 |
|
[ 484 ]
�
� |
Proposal for final CPM text for WRC-23 agenda item 7, Topic C
�
� |
United States of America
� |
AI7C
� |
2022-09-05 |
|
[ 483 ]
�
� |
Draft CPM text for WRC-23 agenda item 7, Topic B
�
� |
United States of America
� |
AI7B
� |
2022-09-05 |
|
[ 482 ]
�
� |
Revisions to working document on WRC-23 agenda item 7, Topic B - Non-GSO BIU post milestone procedure
�
� |
United States of America
� |
AI7B
� |
2022-09-05 |
|
[ 481 ]
�
� |
Draft CPM text for WRC-23 agenda item 7, Topic A
�
� |
United States of America
� |
AI7A
� |
2022-09-05 |
|
[ 480 ]
�
� |
Revisions to working document on WRC-23 agenda item 7, Topic A - Tolerances for certain orbital characteristics of non-GSO space stations in the FSS, BSS, and MSS
�
� |
United States of America
� |
AI7A
� |
2022-09-05 |
|
[ 479 ]
�
� |
Working document on WRC-23 agenda item 1.17
�
� |
United States of America
� |
AI1.17
� |
2022-09-05 |
|
[ 478 ]
�
� |
Working document on WRC-23 agenda item 1.17
�
� |
United States of America
� |
AI1.17
� |
2022-09-05 |
|
[ 477 ]
�
� |
Working document on WRC-23 agenda item 1.17
�
� |
United States of America
� |
AI1.17
� |
2022-09-05 |
|
[ 476 ]
�
� |
Proposed revisions to working document towards draft CPM text for WRC-23 agenda item 1.19
�
� |
United States of America
� |
AI1.19
� |
2022-09-05 |
|
[ 475 ]
�
� |
Aspects of interference management for inclusion in the draft CPM text for WRC-23 agenda item 1.15
�
� |
United States of America
� |
AI1.15
� |
2022-09-05 |
|
[ 474 ]
�
� |
Preliminary draft CPM text for WRC-23 agenda item 1.17
�
� |
United States of America
� |
AI1.17
� |
2022-09-05 |
|
[ 473 ]
�
� |
Working document on WRC-23 agenda item 1.17
�
� |
United States of America
� |
AI1.17
� |
2022-09-05 |
|
[ 472 ]
�
� |
Sharing and compatibility studies for working document related to WRC-23 agenda item 1.17
�
� |
United States of America
� |
AI1.17
� |
2022-09-05 |
|
[ 471 ]
�
� |
Annex 2 to working document on WRC-3 agenda item 1.17
�
� |
United States of America
� |
AI1.17
� |
2022-09-05 |
|
[ 470 ]
�
� |
Compatibility studies between GSO FSS services and satellite-to-satellite links in 27.5-30 GHz
�
� |
Australia
� |
� |
2022-09-05 |
|
[ 469 ]
�
� |
Revisions to the working document for agenda item 1.16 - Mechanisms for ESIM operation to mitigate interference when approaching an administration's territory that has not given authorisation or operating outside of accepted parameters
�
� |
Australia
� |
AI1.16
� |
2022-09-05 |
|
[ 468 ]
�
� |
Revisions to the working document for agenda item 1.15 - Mechanisms for ESIM operation to mitigate interference when approaching an administration's territory that has not given authorisation or operating outside of accepted parameters
�
� |
Australia
� |
AI1.15
� |
2022-09-05 |
|
[ 467 ]
�
� |
Revisions to working document on WRC-23 agenda item 1.15 - Studies on the differences between PFD Mask Proposals for A-ESIM Operations in the frequency band 12.75-13.25 GHz
�
� |
Australia
� |
AI1.15
� |
2022-09-05 |
|
[ 466 ]
�
� |
Studies on use of Earth stations in motion in relation to sharing and compatibility with fixed service and non-GSO fixed-satellite service in the frequency band 12.75-13.25 GHz
�
� |
China (People's Republic of)
� |
AI1.15
� |
2022-09-05 |
|
[ 465 ]
�
� |
Sharing and compatibility study between maritime Earth station in motion (M-ESIM) communicating with non-Geostationary satellites and stations in the fixed service in the frequency band 27.5-29.1 GHz under WRC-23 agenda item 1.16
�
� |
China (People's Republic of)
� |
AI1.16
� |
2022-09-05 |
|
[ 464 ]
�
� |
Proposed modification to the working document towards a draft CPM text and draft new Resolution for WRC-23 agenda item 1.16
�
� |
China (People's Republic of)
� |
AI1.16
� |
2022-09-05 |
|
[ 463 ]
�
� |
Proposals on preliminary draft CPM text for WRC-23 agenda item 7, Topic A
�
� |
China (People's Republic of)
� |
AI7A
� |
2022-09-05 |
|
[ 462 ]
�
� |
Preliminary draft CPM text for WRC-23 agenda item 7, Topic C - Protection of geostationary satellite networks in the mobile-satellite service operating in the 7/8 GHz and 20/30 GHz bands from emissions of non geostationary satellite systems operating in the same frequency bands and identical directions
�
� |
China (People's Republic of)
� |
AI7C
� |
2022-09-05 |
Results:911 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):