International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP7B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP7B� C�

ITU-R�WP7B

Space Radiocommunication Applications

Results:416 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 16 ]
Proposed liaison statement requesting technical characteristics for studies to be conducted agenda item 1.3 � United States of America 2016-03-28
[ 15 ]
Draft liaison statement to Working Parties 4C, 5A, 3M regarding WRC-19 agenda item 1.2 (copy to Working Party 3M for information) � United States of America 2016-03-28
[ 14 ]
Working document toward a preliminary draft new Report performing sharing studies to consider in-band power limits for Earth stations operating in the frequency ranges 401-403 MHz and 399.9-400.05 MHz for the MSS, EESS, and MetSat services � United States of America 2016-03-28
[ 13 ]
Proposal for a potential revision of Recommendation ITU-R P.528 & Report ITU-R P.2345 by Working Party 3K & 3M � France 2016-03-28
[ 12 ]
Proposed liaison statement relative to the technical characteristics of mobile, fixed, maritime mobile, broadcasting and mobile satellite services for studies to be conducted under agenda item 1.3 � France 2016-03-28
[ 11 ]
Agenda item 1.3 (WRC-19) � France 2016-03-28
[ 10 ]
Proposed liaison statement to Task Group 5/1 on parameters for WRC-19 agenda item 1.13 � United Kingdom of Great Britain and Northern Ireland 2016-03-24
[ 9 ]
Review of ITU-R Recommendation dealing with EESS/MetSat interference and sharing criteria � European Organisation for the Exploitation of Meteorological Satellites 2016-03-23
[ 8 ]
Proposed modification of the preliminary draft [NEW REPORT OR RECOMMENDATION] ITU-R SA.[DRS_ARCH_FREQ] � Russian Federation 2016-03-22
[ 7 ]
(Rev.1)
Studies on WRC-19 agenda item 1.7 � Netherlands (Kingdom of the) 2016-03-22
[ 6 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] � WP 5D 2016-03-09
[ 5 ]
Organization of Working Party 7B and terms of reference of its Working Groups � Chairman, WP 7B 2016-02-04
[ 4 ]
Working document on the work plan and milestones for agenda item 1.7 � Chairman, WP 7B 2016-02-04
[ 3 ]
Working document on the work plan and milestones for agenda item 1.3 � Chairman, WP 7B 2016-02-04
[ 2 ]
Working document on the work plan and milestones for agenda item 1.2 � Chairman, WP 7B 2016-02-04
[ 1 ]
Documents to be carried over from the 2012-2015 study period � WP 7B 2015-12-08
Results:416 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2021-01-11