International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5D : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5D� C�

ITU-R�WP5D

IMT Systems

Results:1310 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 910 ]
Liaison statement from ITU-D Study Group 2 on disaster relief use cases � ITU-D SG 2 2018-05-21
[ 909 ]
Liaison statement to Working Parties 5A, 5B, 5C and 5D - WRC-19 agenda item 1.3 � WP 7B AI1.3 2018-05-18
[ 908 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations � WP 7B 2018-05-17
[ 907 ]
Liaison statement to Woking Party 5D - Determination of coordination zones around EESS and SRS earth stations � WP 7B 2018-05-17
[ 906 ]
Liaison statement on invitation to update the information in the IMT-2020 roadmap � Chairman, ITU-T JCA-IMT2020 2018-05-14
[ 905 ]
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 5A and 5D) - WRC-19 agenda item 1.3 � WP 6A AI1.3 2018-05-10
[ 904 ]
Liaison statement to Working Party 7B (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7 � WP 6A AI1.7 2018-05-10
[ 903 ]
Liaison statement to ITU-T Study Group 15 (copy for information to Working Parties 1A, 5A, 5B, 5C and 5D) - Liaison activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) Standards Overviews and Work Plans � WP 6A 2018-05-10
[ 902 ]
Further information on updated material on LTE-Advanced toward revision 4 of Recommendation ITU-R M.2012 � Alliance for Telecommunications Industry Solutions 2018-05-07
[ 901 ]
Liaison Statement on 3GPP IMT-2020 Self-evaluation activities � Alliance for Telecommunications Industry Solutions 2018-05-08
[ 900 ]
Liaison statement to Working Parties 7B and 5D - Consideration of exclusion/coordination zones around EESS and SRS earth stations � TG 5/1 2018-05-07
[ 899 ]
Reply liaison statement to ITU-R Working Party 5D on revision of Report ITU-R M.2373 (copy to Working Parties 6A and 6C) - Audio-visual capabilities and applications supported by terrestrial IMT systems � WP 6B 2018-05-04
[ 898 ]
Reply liaison statement to ITU-R Working Party 7A on UTC (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� regarding broadcasting systems � WP 6B 2018-05-04
[ 897 ]
Preliminary position on WRC-19 Agenda � World Meteorological Organization 2018-05-03
[ 896 ]
"Conclusion" section of the draft CPM texts on the 9 issues under WRC-19 agenda item 9.1 � Chairman, CPM 2018-04-30
[ 895 ]
DECT information regarding the update of Recommendation ITU-R M.1457 � European Telecommunications Standards Institute Q229/5 2018-04-30
[ 894 ]
Liaison statement to Working Parties 4B, 5A, 5C, 5D, 7C and 7D regarding WRC-19 agenda item 9.1, issue 9.1.9 � WP 4A AI9.1 2018-03-21
[ 893 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations � WP 4A 2018-03-21
[ 892 ]
Reply liaison statement to Working Party 5C (copy for information to Working Parties 3M, 4C, 5A, 5D, 7B, 7C and 7D) - WRC-19 agenda item 1.14 � WP 4A AI1.14 2018-03-21
[ 891 ]
Liaison statement to Working Party 5B (copy for information to Working Parties 4B, 4C, 5A, 5C, 5D, 6A, 7B, 7C, 7D and 3M) - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15) � WP 4A AI1.10 2018-03-21
[ 890 ]
Liaison statement on the merge of Q1/9 with Q3/9 and related amendment of Q1/9 ToR � ITU-T SG 9 2018-03-21
[ 889 ]
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - WRC-19 agenda item 9.1, issue 9.1.2 � WP 4A AI9.1 2018-03-21
[ 888 ]
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Draft documents including draft CPM text related to WRC-19 agenda item 1.6, Resolution 159 (WRC-15) � WP 4A AI1.6 2018-03-21
[ 887 ]
Liaison statement to Working Party 5D - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries � WP 4C 2018-03-09
[ 886 ]
Liaison statement to Working Party 5D - Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect to systems in the mobile-satellite service in the frequency band 1 518-1 525 MHz � WP 4C 2018-03-09
[ 885 ]
Liaison statement invitation to update the information in the IMT 2020 roadmap � Chairman, ITU-T (JCA-IMT2020) 2018-03-06
[ 884 ]
Liaison statement on ITU inter-Sector coordination � ITU-T (TSAG) 2018-03-05
[ 883 ]
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� regarding FSS/MSS/BSS � WP 4B 2018-02-23
[ 882 ]
Liaison statement to Working Party 4B (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding FSS/BSS � WP 4A 2018-02-20
[ 881 ]
Revision of Recommendation ITU-R SM.329 - EMC/EMI in relation to IMT � ATDI 2018-02-20
[ 880 ]
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7C) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding RNSS systems � WP 4C 2018-02-20
[ 879 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations � WP 4C 2018-02-19
[ 878 ]
Updated material on IMT-2000 CDMA DS and IMT-2000 CDMA TDD for revision 14 of Recommendation ITU-R M.1457 � Alliance for Telecommunications Industry Solutions 2018-02-16
[ 877 ]
Liaison statement on the results of the 1st meeting of the ITU-T Focus Group on machine learning for future networks including 5G (FG ML5G) � ITU-T FG ML5G 2018-02-08
[ 876 ]
Liaison statement - New ITU-T Study Group 13 terms and definitions � ITU-R CCV, ITU-T SCV 2018-02-09
[ 875 ]
+Ch.1-7
Report on the twenty-ninth meeting of Working Party 5D (Seoul, Korea, 31 January - 7 February 2018) � Chairman, WP 5D 2018-02-08
[ 874 ]
Final List of Participants - ITU-R Working Party 5D � Director, BR 2018-02-07
[ 873 ]
(Rev.1)
Report on the recent activities of Wireless World Research Forum (WWRF) � WWRF Liaison Rapporteur 2018-01-30
[ 872 ]
Update on recent activities within CEPT � ITU Region 1 (CEPT) Rapporteur 2018-01-30
[ 871 ]
(Rev.1)
Update Report on CITEL PCC.II activities � CITEL Rapporteur Q229/5 2018-01-27
[ 870 ]
Update on activities in Region 3 � Region 3 Rapporteur 2018-01-26
[ 869 ]
Proposed modifications to working document towards a preliminary draft new Report ITU-R M.[REP.MSS & IMT L-BAND COMPATIBILITY] � Emirates Telecommunication Corporation - Etisalat 2018-01-24
[ 868 ]
(Rev.1)
Correspondence received regarding the update of Recommendation ITU-R M.1457 to Revision 14 ("Certification B") and ("Certification C") � Director, BR 2018-01-24
[ 867 ]
3GPP initial technology submission of 3GPP 5G solution for IMT-2020 � Alliance for Telecommunications Industry Solutions 2018-01-24
[ 866 ]
Modification of working document towards a preliminary draft new Report ITU-R M.[IMT.MTC] and ITU-R M. [IMT.BY,INDUSTRIES] � United Arab Emirates 2018-01-24
[ 865 ]
Advanced antenna system (AAS) antenna pattern for the use in sharing studies between IMT-2020 and near adjacent frequency band services � United Kingdom of Great Britain and Northern Ireland 2018-01-24
[ 864 ]
Use of IMT-2020 parameters in sharing & compatibility studies � Intel Corporation , Nokia Corporation , Telefon AB - LM Ericsson 2018-01-24
[ 863 ]
3GPP initial technology submission of 3GPP 5G solution for IMT-2020 (TTA) � Director, BR 2018-01-24
[ 862 ]
Reply liaison statement to Working Party 5B - Sharing and compatibility studies between IMT-Advanced systems in 3 300-3 400 MHz and radiolocation systems in 3 100-3 400 MHz � Cameroon (Republic of) , Egypt (Arab Republic of) , Kenya (Republic of) , Nigeria (Federal Republic of) , Rwanda (Republic of) , South Africa (Republic of) , Uganda (Republic of) , Zimbabwe (Republic of) 2018-01-24
[ 861 ]
Proposals to the working document towards a preliminary draft new Report ITU-R M.[RADAR&IMT-Advanced sharing] - Sharing and compatibility studies between IMT-Advanced systems in 3 300-3 400 MHz and radiolocation systems in 3 100-3 400 MHz � Cameroon (Republic of) , Egypt (Arab Republic of) , Kenya (Republic of) , Nigeria (Federal Republic of) , Rwanda (Republic of) , South Africa (Republic of) , Uganda (Republic of) , Zimbabwe (Republic of) 2018-01-24
Results:1310 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2022-06-07