Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 692 ]
�
� |
Liaison statement to Working Parties 4B, 4C, 5A, 5C, 7B and 7C - Studies relating to the use of the frequency bands 17.7-19.7 GHz (space-to-Earth) and 27.5-29.5 GHz (Earth-to-space) by earth stations in motion communicating with geostationary space stations in the fixed-satellite service under WRC-19 agenda item 1.5
�
� |
WP 4A
� |
AI1.5
� |
2018-03-21 |
|
[ 691 ]
�
� |
Liaison statement to Working Party 5A - Characteristics of fixed-satellite service (FSS) feeder links (Earth-to-space) of a non-GSO mobile satellite system operating in the 5 150-5 250 MHz band
�
� |
WP 4A
� |
AI1.16
� |
2018-03-21 |
|
[ 690 ]
�
� |
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Draft documents including draft CPM text related to WRC-19 agenda item 1.6, Resolution 159 (WRC-15)
�
� |
WP 4A
� |
AI1.6
� |
2018-03-21 |
|
[ 689 ]
�
� |
Liaison statement to Working Parties 4C, 5A, 7B and 7C - Studies relating to the bringing into use of frequency assignments to all non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services
�
� |
WP 4A
� |
� |
2018-03-21 |
|
[ 688 ]
�
(Rev.1)� |
Response to liaison statement to Regional Organisations on PPDR - Consequential amendments in accordance with Resolution 646 (Rev.WRC-15) to Recommendation ITU-R M.2009-1 - Radio interface standards for use by public protection and disaster relief operations in accordance with Resolution 646 (Rev.WRC-15)
�
� |
Director, BR
� |
� |
2018-03-08 |
|
[ 687 ]
�
(Rev.1)� |
Response to liaison statement to Regional Organisations on PPDR - Consequential amendments in accordance with Resolution 646 (Rev.WRC-15) to Recommendation ITU-R M.1746 - Harmonized frequency channel plans for the protection of property using data communication
�
� |
Director, BR
� |
� |
2018-03-08 |
|
[ 686 ]
�
(Rev.1)� |
Response to liaison statement to Regional Organisations on PPDR - Consequential amendments in accordance with Resolution 646 (Rev.WRC-15) to Recommendation ITU-R M.1637 - Global cross-border circulation of radiocommunication equipment in emergency and disaster relief situations
�
� |
Director, BR
� |
� |
2018-03-08 |
|
[ 685 ]
�
� |
Liaison statement on ITU inter-Sector coordination
�
� |
ITU-T (TSAG)
� |
� |
2018-03-05 |
|
[ 684 ]
�
� |
Liaison statement on the new version of the Access Network Transport (ANT) Standards Overview and Work Plan
�
� |
ITU-T SG 15
� |
� |
2018-02-27 |
|
[ 683 ]
�
� |
Liaison statement on the new version of the Home Network Transport (HNT) Standards Overview and Work Plan
�
� |
ITU-T SG 15
� |
� |
2018-02-27 |
|
[ 682 ]
�
� |
Liaison statement on ITU inter-Sector coordination on lead SG activities
�
� |
ITU-T SG 15
� |
� |
2018-02-27 |
|
[ 681 ]
�
� |
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� regarding FSS/MSS/BSS
�
� |
WP 4B
� |
� |
2018-02-23 |
|
[ 680 ]
�
� |
Liaison statement to Working Party 4B (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding FSS/BSS
�
� |
WP 4A
� |
� |
2018-02-20 |
|
[ 679 ]
�
� |
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7C) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding RNSS systems
�
� |
WP 4C
� |
� |
2018-02-20 |
|
[ 678 ]
�
� |
Liaison Statement to Working Party 1A (Copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448
and Appendix 7 (Rev.WRC-15) of the Radio Regulations
�
� |
WP 4C
� |
� |
2018-02-19 |
|
[ 677 ]
�
� |
Liaison statement to Working Party 4A (copy for information to Working Parties 5A and 7B) - Simplified regulatory regime for non-GSO satellites with short duration missions
�
� |
WP 4C
� |
� |
2018-02-19 |
|
[ 676 ]
�
� |
Note from Chairman of Working Party 4C to the Director, Radiocommunication Bureau (copy for information to RAG and Working Parties 4A, 4B, 5A, 7B, 7C) - Cost recovery for non-GSO satellite systems
�
� |
Chairman, WP 4C
� |
� |
2018-02-16 |
|
[ 675 ]
�
� |
Reply liaison statement to Working Parties 1B and 5A - Work on WRC-19 agenda item 9.1, issue 9.1.8
�
� |
WP 5D
� |
� |
2018-02-13 |
|
[ 674 ]
�
� |
Liaison statement reply to ITU-R Working Party 5C (copied for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - WRC-19 agenda item 1.14
�
� |
WP 5D
� |
� |
2018-02-12 |
|
[ 673 ]
�
� |
Reply liaison statement to Working Party 5A - IMT-2020 in support of PPDR
�
� |
WP 5D
� |
� |
2018-02-12 |
|
[ 672 ]
�
� |
Liaison statement to Working Party 5A - Preliminary definitions for consideration for inclusion in the online integrated database of ITU Terms and Definitions
�
� |
CCV and SCV
� |
� |
2018-02-12 |
|
[ 671 ]
�
� |
Liaison statement - New ITU-T Study Group 13 terms and definitions
�
� |
ITU-R CCV, ITU-T SCV
� |
� |
2018-02-09 |
|
[ 670 ]
�
� |
Results from the thirteenth meeting of Study Group 5 (20 November 2017) of interest to Working Party 5A
�
� |
Chairman, WP 5A
� |
� |
2018-02-09 |
|
[ 669 ]
�
� |
Liaison statement on establishment of SAE Cellular V2X Technical Committee and Associated Task Forces
�
� |
Director, BR
� |
� |
2018-01-08 |
|
[ 668 ]
�
� |
Liaison statement to Working Parties 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15
�
� |
WP 1A
� |
AI1.15
� |
2017-12-12 |
|
[ 667 ]
�
� |
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 666 ]
�
� |
Liaison statement to Working Parties 3L, 5A, 5B and 6A (copy to Working Party 1B for information) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 665 ]
�
� |
Liaison statement to Working Parties 1C, 3L and 5B (copy to Working Parties 5A and 5C) - HF radio noise measurements at sea
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 664 ]
�
� |
Reply liaison statement to ITU-T Study Group 15 (copy for information to Working Parties 5A, 5B, 5C, 5D and 6A) - Liaison Activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) Standards Overviews and Work Plans
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 663 ]
�
� |
Reply liaison statement to Working Party 5A (copy to Working Party 5D for information) - Work on WRC-19 agenda item 9.1, issue 9.1.8
�
� |
WP 1B
� |
AI9.1
� |
2017-12-08 |
|
[ 662 ]
�
� |
Liaison statement on information about work that is being carried out which is under study in ITU-T Q3/5; ITU-R and ITU-D
�
� |
ITU-T SG 5
� |
� |
2017-11-23 |
|
[ 661 ]
�
� |
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (and copy to Working Parties 3M and 5B for information) - WRC-19 agenda item 1.14
�
� |
WP 5C
� |
AI1.14
� |
2017-11-22 |
|
[ 660 ]
�
� |
Liaison statement to Working Parties 5A, 5D and 6A - Draft revision of Report ITU-R F.2323-0
�
� |
WP 5C
� |
� |
2017-11-22 |
|
[ 659 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, Task Group 5/1, 6A, 7B, 7C and 7D - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
�
� |
WP 5C
� |
� |
2017-11-22 |
|
[ 658 ]
�
� |
Liaison statement to Working Party 5A - Revision of Recommendation ITU-R F.1105-3 - Fixed wireless systems for disaster mitigation and relief operations
�
� |
WP 5C
� |
� |
2017-11-21 |
|
[ 657 ]
�
� |
Reply liaison statement to Working Party 7C (copies to Working Parties 5A and 5B for information) - Technical and operational characteristics for fixed wireless systems operating within the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2)
�
� |
WP 5C
� |
AI2.2
� |
2017-11-21 |
|
[ 656 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5C, 5D, 6A, 7C, 7B, 7D and 3M - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15)
�
� |
WP 5B
� |
AI1.10
� |
2017-11-20 |
|
[ 655 ]
�
� |
Reply liaison statement to Working Party 5A - Technical and operational characteristics of aeronautical systems relevant to the work under WRC-19 agenda item 1.16
�
� |
WP 5B
� |
AI1.16
� |
2017-11-20 |
|
[ 654 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 1C, 3L, 5A and 5C - Working document towards a preliminary draft new Report ITU-R M.[HF NOISE AT SEA]
�
� |
WP 5B
� |
� |
2017-11-20 |
|
[ 653 ]
�
� |
Liaison statement to Working Parties 4A, 5A, 5C and 7C - Aeronautical mobile service (AMS) technical characteristics in 21.2-22 GHz
�
� |
WP 5B
� |
� |
2017-11-20 |
|
[ 652 ]
�
� |
Liaison statement to ITU-R Working Party 1A (copy to Working Parties 5A, 7C and 7D) - Input as related to WRC-19 agenda item 1.15
�
� |
WP 5C
� |
AI1.15
� |
2017-11-17 |
|
[ 651 ]
�
� |
Reply liaison statement on the revision of Recommendation ITU-R M.2084-0 (Annex 33 to 5A/469)
�
� |
Director, BR
� |
� |
2017-11-16 |
|
[ 650 ]
�
+Ann.1-34� |
Report on the nineteenth meeting of Working Party 5A (Geneva, 6 - 16 November 2017)
�
� |
Chairman, WP 5A
� |
� |
2017-11-16 |
|
[ 649 ]
�
� |
Final list of participants - Working Party 5A (Geneva, 6-16 November 2017)
�
� |
Director, BR
� |
� |
2017-11-16 |
|
[ 648 ]
�
� |
Report on the relevant activities in certain countries in Region 3
�
� |
Liaison Rapporteur
� |
� |
2017-11-15 |
|
[ 647 ]
�
� |
Liaison statement to Working Parties 5A and 5C - Frequency allocations for autonomous maritime radio devices (AMRD) in the frequency band 156-162.05 MHz
�
� |
WP 5B
� |
� |
2017-11-10 |
|
[ 646 ]
�
� |
Liaison statement on the amendment of the Terms of Reference of the JCA on multimedia aspects of e-services
�
� |
ITU-T JCA-MMeS
� |
� |
2017-11-07 |
|
[ 645 ]
�
� |
Report on the recent activities of Wireless World Research Forum (WWRF)
�
� |
WWRF Liaison Rapporteur
� |
� |
2017-11-06 |
|
[ 644 ]
�
� |
List of documents issued (Documents 5A/469 - 5A/644)
�
� |
BR Study Groups Department
� |
� |
2017-11-02 |
|
[ 643 ]
�
� |
Liaison statement to Working Parties 4C, 5A, 7B and 7C - WRC-19 agenda item 7, Issues H and I: Additional RR Appendix 4 data elements for non-GSO systems
�
� |
WP 4A
� |
AI7
� |
2017-11-02 |
Results:1092 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):