International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5A� C�

ITU-R�WP5A

Land mobile service above 30 MHz*(excluding IMT); wireless access in the fixed service; amateur and amateur-satellite services

Results:1092 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 692 ]
Liaison statement to Working Parties 4B, 4C, 5A, 5C, 7B and 7C - Studies relating to the use of the frequency bands 17.7-19.7 GHz (space-to-Earth) and 27.5-29.5 GHz (Earth-to-space) by earth stations in motion communicating with geostationary space stations in the fixed-satellite service under WRC-19 agenda item 1.5 � WP 4A AI1.5 2018-03-21
[ 691 ]
Liaison statement to Working Party 5A - Characteristics of fixed-satellite service (FSS) feeder links (Earth-to-space) of a non-GSO mobile satellite system operating in the 5 150-5 250 MHz band � WP 4A AI1.16 2018-03-21
[ 690 ]
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Draft documents including draft CPM text related to WRC-19 agenda item 1.6, Resolution 159 (WRC-15) � WP 4A AI1.6 2018-03-21
[ 689 ]
Liaison statement to Working Parties 4C, 5A, 7B and 7C - Studies relating to the bringing into use of frequency assignments to all non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services � WP 4A 2018-03-21
[ 688 ]
(Rev.1)
Response to liaison statement to Regional Organisations on PPDR - Consequential amendments in accordance with Resolution 646 (Rev.WRC-15) to Recommendation ITU-R M.2009-1 - Radio interface standards for use by public protection and disaster relief operations in accordance with Resolution 646 (Rev.WRC-15) � Director, BR 2018-03-08
[ 687 ]
(Rev.1)
Response to liaison statement to Regional Organisations on PPDR - Consequential amendments in accordance with Resolution 646 (Rev.WRC-15) to Recommendation ITU-R M.1746 - Harmonized frequency channel plans for the protection of property using data communication � Director, BR 2018-03-08
[ 686 ]
(Rev.1)
Response to liaison statement to Regional Organisations on PPDR - Consequential amendments in accordance with Resolution 646 (Rev.WRC-15) to Recommendation ITU-R M.1637 - Global cross-border circulation of radiocommunication equipment in emergency and disaster relief situations � Director, BR 2018-03-08
[ 685 ]
Liaison statement on ITU inter-Sector coordination � ITU-T (TSAG) 2018-03-05
[ 684 ]
Liaison statement on the new version of the Access Network Transport (ANT) Standards Overview and Work Plan � ITU-T SG 15 2018-02-27
[ 683 ]
Liaison statement on the new version of the Home Network Transport (HNT) Standards Overview and Work Plan � ITU-T SG 15 2018-02-27
[ 682 ]
Liaison statement on ITU inter-Sector coordination on lead SG activities � ITU-T SG 15 2018-02-27
[ 681 ]
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� regarding FSS/MSS/BSS � WP 4B 2018-02-23
[ 680 ]
Liaison statement to Working Party 4B (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding FSS/BSS � WP 4A 2018-02-20
[ 679 ]
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7C) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding RNSS systems � WP 4C 2018-02-20
[ 678 ]
Liaison Statement to Working Party 1A (Copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations � WP 4C 2018-02-19
[ 677 ]
Liaison statement to Working Party 4A (copy for information to Working Parties 5A and 7B) - Simplified regulatory regime for non-GSO satellites with short duration missions � WP 4C 2018-02-19
[ 676 ]
Note from Chairman of Working Party 4C to the Director, Radiocommunication Bureau (copy for information to RAG and Working Parties 4A, 4B, 5A, 7B, 7C) - Cost recovery for non-GSO satellite systems � Chairman, WP 4C 2018-02-16
[ 675 ]
Reply liaison statement to Working Parties 1B and 5A - Work on WRC-19 agenda item 9.1, issue 9.1.8 � WP 5D 2018-02-13
[ 674 ]
Liaison statement reply to ITU-R Working Party 5C (copied for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - WRC-19 agenda item 1.14 � WP 5D 2018-02-12
[ 673 ]
Reply liaison statement to Working Party 5A - IMT-2020 in support of PPDR � WP 5D 2018-02-12
[ 672 ]
Liaison statement to Working Party 5A - Preliminary definitions for consideration for inclusion in the online integrated database of ITU Terms and Definitions � CCV and SCV 2018-02-12
[ 671 ]
Liaison statement - New ITU-T Study Group 13 terms and definitions � ITU-R CCV, ITU-T SCV 2018-02-09
[ 670 ]
Results from the thirteenth meeting of Study Group 5 (20 November 2017) of interest to Working Party 5A � Chairman, WP 5A 2018-02-09
[ 669 ]
Liaison statement on establishment of SAE Cellular V2X Technical Committee and Associated Task Forces � Director, BR 2018-01-08
[ 668 ]
Liaison statement to Working Parties 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15 � WP 1A AI1.15 2017-12-12
[ 667 ]
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations � WP 1A 2017-12-12
[ 666 ]
Liaison statement to Working Parties 3L, 5A, 5B and 6A (copy to Working Party 1B for information) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz] � WP 1A 2017-12-12
[ 665 ]
Liaison statement to Working Parties 1C, 3L and 5B (copy to Working Parties 5A and 5C) - HF radio noise measurements at sea � WP 1A 2017-12-12
[ 664 ]
Reply liaison statement to ITU-T Study Group 15 (copy for information to Working Parties 5A, 5B, 5C, 5D and 6A) - Liaison Activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) Standards Overviews and Work Plans � WP 1A 2017-12-12
[ 663 ]
Reply liaison statement to Working Party 5A (copy to Working Party 5D for information) - Work on WRC-19 agenda item 9.1, issue 9.1.8 � WP 1B AI9.1 2017-12-08
[ 662 ]
Liaison statement on information about work that is being carried out which is under study in ITU-T Q3/5; ITU-R and ITU-D � ITU-T SG 5 2017-11-23
[ 661 ]
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (and copy to Working Parties 3M and 5B for information) - WRC-19 agenda item 1.14 � WP 5C AI1.14 2017-11-22
[ 660 ]
Liaison statement to Working Parties 5A, 5D and 6A - Draft revision of Report ITU-R F.2323-0 � WP 5C 2017-11-22
[ 659 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, Task Group 5/1, 6A, 7B, 7C and 7D - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz � WP 5C 2017-11-22
[ 658 ]
Liaison statement to Working Party 5A - Revision of Recommendation ITU-R F.1105-3 - Fixed wireless systems for disaster mitigation and relief operations � WP 5C 2017-11-21
[ 657 ]
Reply liaison statement to Working Party 7C (copies to Working Parties 5A and 5B for information) - Technical and operational characteristics for fixed wireless systems operating within the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2) � WP 5C AI2.2 2017-11-21
[ 656 ]
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5C, 5D, 6A, 7C, 7B, 7D and 3M - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15) � WP 5B AI1.10 2017-11-20
[ 655 ]
Reply liaison statement to Working Party 5A - Technical and operational characteristics of aeronautical systems relevant to the work under WRC-19 agenda item 1.16 � WP 5B AI1.16 2017-11-20
[ 654 ]
Liaison statement to Working Parties 1A, 1B, 1C, 3L, 5A and 5C - Working document towards a preliminary draft new Report ITU-R M.[HF NOISE AT SEA] � WP 5B 2017-11-20
[ 653 ]
Liaison statement to Working Parties 4A, 5A, 5C and 7C - Aeronautical mobile service (AMS) technical characteristics in 21.2-22 GHz � WP 5B 2017-11-20
[ 652 ]
Liaison statement to ITU-R Working Party 1A (copy to Working Parties 5A, 7C and 7D) - Input as related to WRC-19 agenda item 1.15 � WP 5C AI1.15 2017-11-17
[ 651 ]
Reply liaison statement on the revision of Recommendation ITU-R M.2084-0 (Annex 33 to 5A/469) � Director, BR 2017-11-16
[ 650 ]
+Ann.1-34
Report on the nineteenth meeting of Working Party 5A (Geneva, 6 - 16 November 2017) � Chairman, WP 5A 2017-11-16
[ 649 ]
Final list of participants - Working Party 5A (Geneva, 6-16 November 2017) � Director, BR 2017-11-16
[ 648 ]
Report on the relevant activities in certain countries in Region 3 � Liaison Rapporteur 2017-11-15
[ 647 ]
Liaison statement to Working Parties 5A and 5C - Frequency allocations for autonomous maritime radio devices (AMRD) in the frequency band 156-162.05 MHz � WP 5B 2017-11-10
[ 646 ]
Liaison statement on the amendment of the Terms of Reference of the JCA on multimedia aspects of e-services � ITU-T JCA-MMeS 2017-11-07
[ 645 ]
Report on the recent activities of Wireless World Research Forum (WWRF) � WWRF Liaison Rapporteur 2017-11-06
[ 644 ]
List of documents issued (Documents 5A/469 - 5A/644) � BR Study Groups Department 2017-11-02
[ 643 ]
Liaison statement to Working Parties 4C, 5A, 7B and 7C - WRC-19 agenda item 7, Issues H and I: Additional RR Appendix 4 data elements for non-GSO systems � WP 4A AI7 2017-11-02
Results:1092 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2021-01-11