Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 74 ]
�
(Rev.1)� |
Reply liaison statement to Working Party 7D (copied for information to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and Task Group 5/1) - Propagation data and predictions for coexistence and compatibility studies above 50 GHz
�
� |
WPs 3K and 3M
� |
� |
2016-07-04 |
|
[ 73 ]
�
� |
Reply liaison statement to Working Party 4C (copied for information to Working Party 5D) - Studies related to coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-1 518 MHz
�
� |
WP 3M
� |
� |
2016-07-04 |
|
[ 72 ]
�
� |
Reply liaison statement to Working Party 5C (copied for information to Working Parties 4A,
4C, 5A, 5D, 7B, 7C, 7D and TG 5/1) - Propagation data and prediction methods required for coexistence and compatibility studies for High-Altitude Platform Stations (HAPS)
�
� |
WP 3M
� |
� |
2016-07-04 |
|
[ 71 ]
�
� |
Reply liaison statement to Working Party 5D (copied for information to Working Party 4C) -
Propagation data and predictions for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band
�
� |
WPs 3K and 3M
� |
� |
2016-07-01 |
|
[ 70 ]
�
� |
Reply liaison statement to Working Parties 5B and 7B (copied to Working Parties 4A, 4C, 5A, 5C, 5D and 7D for information) - ITU-R propagation models for use in aeronautical propagation scenarios
�
� |
WPs 3K and 3M
� |
� |
2016-07-01 |
|
[ 69 ]
�
� |
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A,
4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
WP 3J
� |
� |
2016-07-01 |
|
[ 68 ]
�
� |
Liaison statement to Working Parties 4A & 4C - Coordination of work on anticipated draft CPM text deadlines for WRC-19 agenda items / issues where Working Party 5D is a jointly responsible group
�
� |
WP 5D
� |
� |
2016-06-29 |
|
[ 67 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies
�
� |
WP 5D
� |
� |
2016-06-28 |
|
[ 66 ]
�
� |
Reply liaison statement to Working Party 4C - Co-existence and compatibility study between mobile satellite systems and terrestrial IMT-Advanced systems in the 2 GHz band in different countries
�
� |
WP 5D
� |
� |
2016-06-28 |
|
[ 65 ]
�
� |
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7
�
� |
WP 5D
� |
AI1.7
� |
2016-06-24 |
|
[ 64 ]
�
� |
Liaison statement to Working Party 4C - Technical measures to ensure coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-1 518 MHz
�
� |
WP 5D
� |
� |
2016-06-23 |
|
[ 63 ]
�
� |
Liaison statement to Working Party 7B (copied to Working Parties 3M, 4C, 5A, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.3
�
� |
WP 5D
� |
AI1.3
� |
2016-06-23 |
|
[ 62 ]
�
� |
Liaison response to Working Party 5A (copy to Working Parties 4A, 4B, 4C and ITU-T Study Group 17) - Network security requirements for Public Protection and Disaster Relief and Emergency Communication
�
� |
WP 5D
� |
� |
2016-06-23 |
|
[ 61 ]
�
� |
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
WP 1A
� |
� |
2016-06-13 |
|
[ 60 ]
�
� |
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing...
�
� |
WP 1B
� |
� |
2016-06-13 |
|
[ 59 ]
�
� |
Liaison statement to Working Parties 5A and 5C on infrastructure sharing (copy to Working Parties 4C and 5C) - Innovative regulatory tools to support enhanced shared use of the spectrum
�
� |
WP 1B
� |
208-1/1
� |
2016-06-13 |
|
[ 58 ]
�
� |
Liaison statement to Working Party 5D (copied for information to Task Group 5/1) - Propagation advice in support of agenda item 1.13: input requested from Working Party 5D
�
� |
Chairmen, SG 3, WP 3J, WP 3K and WP 3M
� |
AI1.13
� |
2016-06-01 |
|
[ 57 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5B and 5C (copied for information to Working parties 1B, 3J, 3K, 3M and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16
�
� |
WP 5A
� |
AI1.16
� |
2016-05-25 |
|
[ 56 ]
�
� |
Liaison response to ITU-T SG 17 (copy to Working Parties 4A, 4B, 4C and 5D) - Network security requirements for Public Protection and Disaster Relief and Emergency Communication
�
� |
WP 5A
� |
� |
2016-05-25 |
|
[ 55 ]
�
� |
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7
�
� |
WP 5A
� |
AI1.7
� |
2016-05-25 |
|
[ 54 ]
�
� |
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 4C, 5B, 5C, 5D and 6A) - Technical characteristics for WRC-19 agenda item 1.3
�
� |
WP 5A
� |
AI1.3
� |
2016-05-25 |
|
[ 53 ]
�
� |
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Preparation for WRC-19 agenda item 1.13
�
� |
TG 5/1
� |
AI1.13
� |
2016-05-25 |
|
[ 52 ]
�
� |
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5B and 6A) - WRC-19 agenda item 1.7
�
� |
WP 5C
� |
AI1.7
� |
2016-05-24 |
|
[ 51 ]
�
� |
Liaison statement requesting technical characteristics for WRC-19 agenda item 1.9.2 from Working Parties 4C, 5A, 5C, 6A, 7B and 7D (copy to Working Parties 1A and 3M for information)
�
� |
WP 5B
� |
� |
2016-05-23 |
|
[ 50 ]
�
� |
Liaison statement to Working Parties 3K & 3M (copy for information to Working Parties 5A, 5C, 5D, 4A, 4C, 7B and 7D) - Questions for Working Parties 3K and 3M on ITU-R propagation Recommendations used by Working Party 5B
�
� |
WP 5B
� |
� |
2016-05-23 |
|
[ 49 ]
�
� |
Liaison statement to Working Party 4C - Introduction of additional mobile-satellite service systems into the Global Maritime Distress Safety System (GMDSS)
�
� |
WP 5B
� |
� |
2016-05-23 |
|
[ 48 ]
�
� |
Liaison statement to ITU-R Working Parties 3M, 4A, 4C, 5A, 5D, 7B, 7C and 7D (for information to Task Group 5/1) - WRC-19 agenda item 1.14
�
� |
WP 5C
� |
AI1.14
� |
2016-05-20 |
|
[ 47 ]
�
� |
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5C and 6A) - WRC-19 agenda item 1.7
�
� |
WP 5B
� |
AI1.7
� |
2016-05-20 |
|
[ 46 ]
�
� |
Liaison statement to Telecommunication Standardization Advisory Group and ITU-R Working Party 4C
�
� |
WP 5B
� |
� |
2016-05-18 |
|
[ 45 ]
�
� |
Liaison statement on Recommendation ITU-T K.106 (K.mhn)
�
� |
ITU-T SG 5
� |
� |
2016-05-13 |
|
[ 44 ]
�
� |
Liaison statement to WP 5C concerning WRC-19 agenda item 1.14 - (copy to WP 4A, WP 4C, WP 5A, WP 5D, WP 7D, WP 3M for information)
�
� |
WP 7B
� |
AI1.14
� |
2016-04-12 |
|
[ 43 ]
�
+Ann.1-15� |
Report on the meeting of Working Party 4C (Geneva, 6-12 April 2016)
�
� |
Chairman, WP 4C
� |
� |
2016-04-12 |
|
[ 42 ]
�
� |
Final list of participants - Working Party 4C (Geneva, 6-12 April 2016)
�
� |
Director, BR
� |
� |
2016-04-12 |
|
[ 41 ]
�
� |
Liaison statement to Working Party 5A (Working Parties 4A, 4C, 5B, and 5C copied for information) - Information pertaining to EESS (active) in the 5 GHz range to be considered under WRC-19 agenda item 1.16
�
� |
WP 7C
� |
AI1.16
� |
2016-04-11 |
|
[ 40 ]
�
� |
Liaison statement to Working Party 5C for WRC-19 agenda item 1.14 sharing studies (copy to Working Parties 4A, 4C, 5A, 5D, 7D, 3M)
�
� |
WP 7C
� |
AI1.14
� |
2016-04-11 |
|
[ 39 ]
�
� |
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information)
�
� |
WP 7D
� |
� |
2016-04-11 |
|
[ 38 ]
�
� |
Liaison statement to Working Parties 4C and 5B (copy to the Joint IMO/ITU Experts Group) - Compatibility of the radio astronomy service with satellite-provided global maritime distress and safety systems (WRC-19 AI 1.8)
�
� |
WP 7D
� |
AI1.8
� |
2016-04-08 |
|
[ 37 ]
�
� |
Liaison statement requesting technical characteristics for WRC-19 agenda item 1.3 from Working Parties 4C, 5A, 5B, 5C, 5D and 6A (copy to Working Party 3M for information)
�
� |
WP 7B
� |
� |
2016-04-07 |
|
[ 36 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C and 6A concerning WRC-19 agenda item 1.7 (copy for information to Working Party 1A, Working Party 3M and Working Party 4B) - WRC-19 agenda item 1.7
�
� |
WP 7B
� |
AI1.7
� |
2016-04-07 |
|
[ 35 ]
�
� |
Liaison statement to Working Party 4C regarding WRC-19 agenda item 1.2 (copy to Working Parties 3M and 5A for information)
�
� |
WP 7B
� |
� |
2016-04-07 |
|
[ 34 ]
�
� |
List of documents issued (Documents 4C/1 - 4C/34)
�
� |
BR Study Groups Department
� |
� |
2016-04-05 |
|
[ 33 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties
�
� |
Chairman, CCV
� |
� |
2016-04-01 |
|
[ 32 ]
�
� |
Proposed revisions to preliminary draft new Report ITU-R M.[ADS-MSS]
�
� |
Inmarsat Plc.
� |
� |
2016-03-30 |
|
[ 31 ]
�
� |
Proposed updates to the coexistence and compatibility between the satellite and terrestrial components of IMT in the 2 GHz band
�
� |
Inmarsat Plc.
� |
201-1/4
� |
2016-03-30 |
|
[ 30 ]
�
� |
Technical measures to ensure coexistence between the MSS in the frequency band 1 518-1 525 MHz and IMT in the frequency band 1 492-2 518 MHz
�
� |
Inmarsat Plc.
� |
� |
2016-03-30 |
|
[ 29 ]
�
� |
Agenda item 1.2 (WRC-19)
�
� |
France
� |
� |
2016-03-30 |
|
[ 28 ]
�
� |
Draft liaison statement to Working Party 7C regarding preliminary draft new Recommendation ITU-R RS.[EESS_RNSS_METH]
�
� |
France
� |
� |
2016-03-30 |
|
[ 27 ]
�
� |
Reply to liaison statement to ITU-T Study Group 9 - Coexistence of wired telecommunications and RNSS systems
�
� |
France
� |
� |
2016-03-30 |
|
[ 26 ]
�
� |
[Preliminary] draft new Report ITU-R M.[ADS-MSS] - Use of existing mobile-satellite service systems for aircraft tracking
�
� |
France
� |
� |
2016-03-30 |
|
[ 25 ]
�
� |
Protection criterion for MSS Earth Stations in the 1 518-1 525 MHz band
�
� |
France
� |
� |
2016-03-30 |
Results:474 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):