Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 515 ]
�
� |
List of documents issued (Documents 4A/364 - 4A/515)
�
� |
BR Study Groups Department
� |
� |
2017-10-17 |
|
[ 514 ]
�
� |
Liaison statement to Working Party 4A - Application of coordination arc in the Ka band under WRC-19 agenda item 7 issue B
�
� |
WP 4C
� |
� |
2017-10-17 |
|
[ 513 ]
�
(Rev.1)� |
Note to the Chairman of Study Group 4 (copy for information to Working Parties 4A and 4B) - Cost recovery for non-GSO satellite networks
�
� |
WP 4C
� |
� |
2017-10-17 |
|
[ 512 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations
�
� |
WP 4C
� |
� |
2017-10-16 |
|
[ 511 ]
�
� |
Reply liaison statement to Task Group 5/1 (copy to WPs 4A, 5B, 7B and 7C for information) - Reply to request for additional information on parameters in support of sharing and compatibility studies with IMT-2020
�
� |
WP 4C
� |
� |
2017-10-16 |
|
[ 510 ]
�
� |
Liaison statement to Working Party 4A - RR Appendix 4 data elements to be provided for non-geostationary satellite systems
�
� |
WP 4C
� |
AI7
� |
2017-10-16 |
|
[ 509 ]
�
� |
Note to the Director, Radiocommunication Bureau (copy for information to Working Party 4A) - Non-geostationary satellites with short duration missions operating in mobile-satellite service (MSS) allocations
�
� |
WP 4C
� |
� |
2017-10-16 |
|
[ 508 ]
�
� |
Liaison statement to Working Party 4A (copy for information to Working Parties 5A and 7B) - Inconsistency between filed RR Appendix 4 C/N objectives and other technical parameters
�
� |
WP 4C
� |
� |
2017-10-16 |
|
[ 507 ]
�
� |
Liaison statement to Working Party 4A - Compatibility studies between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz in different countries in Regions 1 and 3
�
� |
WP 5D
� |
� |
2017-10-11 |
|
[ 506 ]
�
� |
Liaison statement to Task Group 5/1 (copied to Working Parties 4A and 5C for information) - Total integrated gain for the active antenna system (AAS) antenna pattern
�
� |
WP 5D
� |
� |
2017-10-11 |
|
[ 505 ]
�
� |
Guidelines for reporting harmful interference for cases of GSO satellite services
�
� |
World Broadcasting Unions - Technical Committee
� |
� |
2017-10-10 |
|
[ 504 ]
�
� |
FSS technical parameters for sharing studies under WRC-19 agenda item 1.13 and 1.14
�
� |
Inmarsat Plc.
� |
AI1.14, AI1.13
� |
2017-10-10 |
|
[ 503 ]
�
� |
Working document toward a draft new Report - Technical feasibility of NGSO-to-GSO satellite links
�
� |
United States of America
� |
� |
2017-10-10 |
|
[ 502 ]
�
� |
Revisions to working document toward preliminary draft CPM text for WRC-19 agenda item 1.5
�
� |
United States of America
� |
AI1.5
� |
2017-10-10 |
|
[ 501 ]
�
� |
Revisions to working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
�
� |
United States of America
� |
AI1.5
� |
2017-10-10 |
|
[ 500 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[ESIM] - Operation of earth stations in motion (ESIM) in fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz - Protection criteria for feeder links of the MSS in the bands 19.3-19.7 GHz and 29.1-29.5 GHz
�
� |
United States of America
� |
AI1.5
� |
2017-10-10 |
|
[ 499 ]
�
� |
Proposal for CPM text on WRC-19 agenda item 1.4 - Review of Annex 7 to Appendix 30 (Rev. WRC-12)
�
� |
Papua New Guinea
� |
AI1.4
� |
2017-10-10 |
|
[ 498 ]
�
� |
WRC-19 agenda item 7 issue A
�
� |
Luxembourg
� |
AI7
� |
2017-10-10 |
|
[ 497 ]
�
� |
Preliminary draft CPM text for WRC-19 agenda item 1.4 - Agenda item 1.4
�
� |
Luxembourg
� |
AI.4
� |
2017-10-10 |
|
[ 496 ]
�
� |
Preliminary draft new Report for WRC-19 agenda item 1.4 ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR - Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions - Agenda item 1.4
�
� |
Luxembourg
� |
AI1.4
� |
2017-10-10 |
|
[ 495 ]
�
� |
Alternative proposal regarding limitation A3 - Agenda item 1.4
�
� |
Luxembourg
� |
AI1.4
� |
2017-10-10 |
|
[ 494 ]
�
� |
Draft new Recommendation ITU-R S.[GUIDELINES_14.5-14.8 GHZ] - Guidelines to conduct bilateral coordination for explicit agreements, in the frequency band 14.5-14.75 GHz, for Regions 1 and 2 countries, or in the frequency band 14.5-14.8 GHz, for Region 3 countries, in the fixed-satellite service (Earth-to-space) not for feeder links for the broadcasting-satellite service, ...
�
� |
Luxembourg
� |
� |
2017-10-10 |
|
[ 493 ]
�
� |
Sharing and compatibility between ESIM and terrestrial services
�
� |
Austria
,
France
,
Germany (Federal Republic of)
,
Inmarsat Plc.
,
Luxembourg
,
Netherlands (Kingdom of the)
,
Norway
� |
� |
2017-10-10 |
|
[ 492 ]
�
� |
Proposal for amendments of CPM text - WRC-19 agenda item 1.4
�
� |
Egypt (Arab Republic of)
,
Oman (Sultanate of)
,
Saudi Arabia (Kingdom of)
,
United Arab Emirates
� |
AI1.4
� |
2017-10-10 |
|
[ 491 ]
�
� |
Technical characteristics of GSO FSS parameters WRC-19 agenda item 1.6
�
� |
SES WORLD SKIES
� |
AI1.6
� |
2017-10-10 |
|
[ 490 ]
�
� |
Proposed revisions to the working document towards preliminary draft CPM text for WRC-19 agenda item 1.6
�
� |
SES WORLD SKIES
� |
AI1.6
� |
2017-10-10 |
|
[ 489 ]
�
� |
Proposal to revise Recommendation ITU-R S.1782-0, possibilities for global broadband internet access by fixed satellite systems, along with the Recommendation ITU-R S.1783-0, technical and operational features characterizing high-density applications in the fixed-satellite service
�
� |
France
� |
� |
2017-10-10 |
|
[ 488 ]
�
� |
WRC-19 agenda item 7, issue A - Proposal for a milestone-based system to verify compliance of use of frequency assignments to non-Geostationary FSS systems with their associated notified characteristics
�
� |
France
� |
AI7
� |
2017-10-10 |
|
[ 487 ]
�
� |
WRC-19 agenda item 9.1, issue 9.1.3 - Possible regulatory option to address the needs of new non-Geostationary systems in the 3 700-4 200 MHz and 5 925-6 425 MHz frequency bands
�
� |
France
� |
AI9.1
� |
2017-10-10 |
|
[ 486 ]
�
� |
Proposed modifications to the preliminary draft new Report ITU-R S.[SPECTRUM_NEEDS] - WRC-19 agenda item 9.1 issue 9.1.9
�
� |
France
� |
AI9.1
� |
2017-10-10 |
|
[ 485 ]
�
� |
Proposed modifications to the working document towards a preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - WRC-19 agenda item 9.1 issue 9.1.9
�
� |
France
� |
AI9.1
� |
2017-10-10 |
|
[ 484 ]
�
� |
Compatibility studies between a possible new allocation to the FSS in the 51.4 - 52.4 GHz band and the EESS (passive) in the 52.6 - 54.25 GHz band - WRC-19 agenda item 9.1, issue 9.1.9
�
� |
France
� |
AI9.1
� |
2017-10-10 |
|
[ 483 ]
�
� |
Draft CPM text on WRC-19 agenda item 9.1, issue 9.1.9
�
� |
France
� |
AI9.1
� |
2017-10-10 |
|
[ 482 ]
�
� |
Impact of the percentage of time in propagation between a time-invariant transmitter and a receiver
�
� |
France
� |
� |
2017-10-10 |
|
[ 481 ]
�
� |
Working document - Simplified regulatory regime for non-GSO satellites with short duration missions
�
� |
South Africa (Republic of)
� |
� |
2017-10-10 |
|
[ 480 ]
�
� |
Proposed changes to working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue G: Updating the reference situation for networks under RR Appendices 30 and 30A when provisional recording is used
�
� |
Norway
� |
AI7
� |
2017-10-10 |
|
[ 479 ]
�
� |
Studies on protection of FS links in EACO countries
�
� |
Burundi (Republic of)
,
Kenya (Republic of)
,
Rwanda (Republic of)
,
South Sudan (Republic of)
,
Tanzania (United Republic of)
,
Uganda (Republic of)
� |
AI1.5
� |
2017-10-10 |
|
[ 478 ]
�
� |
Justification statistics of RR Appendix 30B - On WRC-19, Issue E and New Issues X and Y
�
� |
Iran (Islamic Republic of)
� |
AI7
� |
2017-10-10 |
|
[ 477 ]
�
� |
Study of interference by a non-GSO system to a GSO system in Q/V frequency band
�
� |
Iran (Islamic Republic of)
� |
AI1.6
� |
2017-10-10 |
|
[ 476 ]
�
� |
Implementation of IMT system in frequency band 1 452-1 492 MHz Region 1
�
� |
Iran (Islamic Republic of)
� |
� |
2017-10-10 |
|
[ 475 ]
�
� |
Mobile Satellite-Service feeder link characteristics for studies regarding WRC-19 agenda item 1.16
�
� |
Globalstar, Inc.
� |
AI1.16
� |
2017-10-10 |
|
[ 474 ]
�
� |
Draft reply liaison statement to Working Party 1B - Studies on managing transmissions of terminals to be limited to authorised terminals
�
� |
United States of America
� |
� |
2017-10-10 |
|
[ 473 ]
�
� |
Agenda item 7, issue C - Issues for which consensus was readily achieved in ITU-R - Studies concerning the return of frequency notices under Radio Regulation (RR) no. 11.38 (C5)
�
� |
United States of America
� |
AI7
� |
2017-10-10 |
|
[ 472 ]
�
� |
Updates to working document towards preliminary draft CPM for WRC-19 agenda item 9.1, issue 9.1.3 - WRC-19 agenda item 9.1, issue 9.1.3
�
� |
United States of America
� |
AI9.1
� |
2017-10-10 |
|
[ 471 ]
�
� |
Proposed updates to preliminary draft CPM text for WRC-19 agenda item 1.6
�
� |
United States of America
� |
AI1.6
� |
2017-10-10 |
|
[ 470 ]
�
� |
Proposed updates to working document towards a preliminary draft new Report on sharing between 50/40 GHz GSO networks and non-GSO systems - WRC-19 agenda item 1.6
�
� |
United States of America
� |
AI1.6
� |
2017-10-10 |
|
[ 469 ]
�
� |
Proposed updates to working document towards a preliminary draft new Recommendation ITU-R S.[50/40 GHz FSS SHARING METHODOLOGY]
�
� |
United States of America
� |
AI1.6
� |
2017-10-10 |
|
[ 468 ]
�
� |
Preliminary draft CPM text for WRC-19 agenda item 1.4 - Agenda item 1.4
�
� |
United States of America
� |
AI1.4
� |
2017-10-10 |
|
[ 467 ]
�
� |
Preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions
�
� |
United States of America
� |
AI1.4
� |
2017-10-10 |
|
[ 466 ]
�
� |
Working document towards a preliminary draft new Recommendation/Report on statistical methodologies to estimate the interferences from land earth stations in motion (L-ESIM) communicating with geostationary space stations in the fixed-satellite service into mobile service (MS) stations operating in the 27.5-29.5 GHz frequency band
�
� |
United States of America
� |
AI1.5
� |
2017-10-10 |
Results:915 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):