International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1A� C�

ITU-R�WP1A

Spectrum Engineering Techniques

Results:466 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 66 ]
Liaison statement to ITU-T Study Group 15 on narrowband wireless home networking (copy to ITU-R Working Parties 1A and 5A for information) - Working document towards a preliminary draft new Recommendation ITU-R SM.[G.WNB-FREQ] � WP 1B 2016-06-23
[ 65 ]
Liaison statement to Working Parties 1A, 5B and 6A - Studies on WRC-19 agenda item 9.1, issue 9.1.6 - "Wireless power transmission for Electric Vehicles (WPT4EV)" � WP 1B AI9.1 2016-06-20
[ 64 ]
WPT activities � European Telecommunications Standards Institute 2016-06-17
[ 63 ]
Liaison to ITU-R Working Parties 1A & 1B on Technical Report on UWB worldwide � European Telecommunications Standards Institute 2016-06-17
[ 62 ]
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing .... � WP 1B 2016-06-13
[ 61 ]
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information) � WP 1B 2016-06-13
[ 60 ]
+Ann.1-17
Report on the first 2015-2019 meeting of Working Party 1A (Geneva, 2 - 9 June 2016) � Chairman, WP 1A 2016-06-08
[ 59 ]
Final list of participants - Working Party 1A (Geneva, 2-9 June 2016) � Director, BR 2016-06-08
[ 58 ]
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5, ITU-R Study Groups 1, 5, 6 and their relevant Working Parties on ongoing collaboration � ITU-D SG 2 2016-06-06
[ 57 ]
List of documents issued (Documents 1A/1 - 1A/57) � BR Study Groups Department 2016-06-01
[ 56 ]
Report on CISPR activities June 2015 to May 2016 � Rapporteur, SG 1 RG on Liaison with CISPR 2016-06-01
[ 55 ]
LED lighting interference to broadcasting services � European Broadcasting Union 2016-05-26
[ 54 ]
Support for extension of reports on PLT to cover PLT MIMO devices � European Broadcasting Union 2016-05-26
[ 53 ]
Comments to the Report of the WP 1A Rapporteur Group on WPT � European Broadcasting Union 2016-05-26
[ 52 ]
Proposed revision of the working document towards a preliminary draft new Report ITU-R SM.[WPT.BEAM] � Japan 2016-05-26
[ 51 ]
Proposal of work plan and draft outline for CMP text for WRC-19 agenda item 1.15 and liaison statement to Working Parties 3J, 3K and 3M � Japan AI1.15 2016-05-26
[ 50 ]
Work plan for ITU-R Reports of wireless power transmission - Via radio frequency beam � Japan Q210/1 2016-05-26
[ 49 ]
Revision proposal of Report ITU-R SM.2303 to update information and to incorporate assessment process and methodology in studies on the impact of wireless power transmission systems applied to electric vehicles � Japan Q210/1 2016-05-26
[ 48 ]
Proposed modification of Report ITU-R SM.2351-0 on section "Annex 4 - Smart Grid in Brazil" � Brazil (Federative Republic of) 2016-05-26
[ 47 ]
Proposal to set up a Rapporteur Group to revise Recommendation ITU-R SM.851-1 � Italy , Vatican City State 2016-05-25
[ 46 ]
Broadband with speed of light - Visible light communication � Netherlands (Kingdom of the) Q238/1 2016-05-25
[ 45 ]
Activities of the Rapporteur Group on coexistence of wired telecommunication with radiocommunication systems (Questions ITU-R 210-3/1, ITU-R 221-2/1 & ITU-R 236/1) � Rapporteur, RG wired and radio 2016-05-25
[ 44 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7 � WP 5A 2016-05-25
[ 43 ]
Liaison statement to Working Parties 1A, 1B, 4A, 5B, 5C and 5D - Study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications � WP 5A 2016-05-25
[ 42 ]
Reply liaison statement to Working Party 1A (copy for information to Working Parties 1B, 5B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam � WP 5A 2016-05-25
[ 41 ]
Proposed revision of Report ITU-R SM.2303-1 � Korea (Republic of) 2016-05-25
[ 40 ]
Report ITU-R SM.2351-0 - Smart grid utility management systems � Institute of Electrical and Electronics Engineers, Inc. 2016-05-25
[ 39 ]
Liaison statement to External Organizations (copy for information to Working Parties 1A and 5D) - Technical and operational characteristics of the land mobile service applications and their spectrum needs associated with work on WRC-19 agenda item 1.15 in the frequency range 275-450 GHz � WP 5A AI1.15 2016-05-24
[ 38 ]
Liaison statement to ITU-R Working Party 1A � Director, BR 2016-05-24
[ 37 ]
Liaison statement to External Organizations (copy for information to Working Parties 1A, 3J, 3K, 3M, 5A and 5D, 7C and 7D) - Technical and operational characteristics of the fixed service applications and their spectrum needs associated with work on WRC-19 agenda item 1.15 � WP 5C AI1.15 2016-05-24
[ 36 ]
Information of standardization and application of broadband power line communication in China � China (People's Republic of) 2016-05-24
[ 35 ]
Draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around and Earth station in the frequency bands between 100 MHz and 105 GHz � China (People's Republic of) 2016-05-24
[ 34 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5B and 6A) - WRC-19 agenda item 1.7 � WP 5C AI1.7 2016-05-24
[ 33 ]
Liaison statement requesting technical characteristics for WRC-19 agenda item 1.9.2 from Working Parties 4C, 5A, 5C, 6A, 7B and 7D (copy to Working Parties 1A and 3M for information) � WP 5B AI1.9.2 2016-05-23
[ 32 ]
Liaison to ITU-R WP 1A on aeronautical radars and related spectrum masks � ETSI 2016-05-20
[ 31 ]
Reply liaison statement to Working Party 5C copied to Working Party 1A and Working Party 1B for information - Preliminary draft new Report ITU-R F.[FS/RLS COMPATIBILITY IN 71-86 GHZ] - P-P/P-MP applications in the fixed service operating in the 71-76 GHz and 81-86 GHz bands and automotive radar applications in the radiolocation service operating in the 76-77.5 GHz and... � WP 5B 2016-05-20
[ 30 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5C and 6A) - WRC-19 agenda item 1.7 � WP 5B AI1.7 2016-05-20
[ 29 ]
Liaison statement to Working Party 1A (copied to Working Parties 5D and 6A for information) - Liaison with CENELEC on PLT, EMI and WPT � WPs 5A, 5B and 5C 2016-05-19
[ 28 ]
Shortcomings of Recommendation ITU-R SM.1009-1 � Germany (Federal Republic of) 2016-05-19
[ 27 ]
Proposal to develop a new Report on "General principles and methods for sharing between radiocommunication services" � United States of America 2016-05-18
[ 26 ]
Draft liaison statement to ITU-R Working Parties 7C and 7D on passive system characteristics in regards to WRC-19 agenda item 1.15 � United States of America AI1.15 2016-05-18
[ 25 ]
Draft liaison statement to ITU-R Working Parties 5A and 5C on service characteristics for systems in the range 275-450 GHz � United States of America 2016-05-18
[ 24 ]
Draft liaison statement to ITU-R Working Parties 3J, 3K and 3M on propagation characteristics in the range 275 - 450 GHz � United States of America 2016-05-18
[ 23 ]
Proposed editorial modifications of Recommendation ITU-R SM.326-7, Recommendation ITU-R SM.328-11, Recommendation ITU-R SM.1446, Recommendation ITU-R SM.1879-2 and Report ITU-R SM.2158-3 � United States of America 2016-05-18
[ 22 ]
Reply liaison statement to ITU-R Study Group 1 Working Party 1A on WPT - Study Question ITU-R 210-3/1 "Wireless power transmission" � International Special Committee on Radio Interference 2016-05-17
[ 21 ]
(Rev.2)
Report of the work of Rapporteur Group on Wireless Power Transmission � Rapporteur, RG-WPT Q210/1 2016-05-13
[ 20 ]
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5 � ITU-T SG 5 2016-05-13
[ 19 ]
Attendance Report of CISPR meeting � Liaison Rapporteur with CISPR on WPT 2016-05-12
[ 18 ]
On the characterization of unwanted emissions of broadband digital systems � Germany (Federal Republic of) 2016-05-03
[ 17 ]
Liaison statement on the progress of ongoing work on WTDC Resolution 9 (Rev.Dubai, 2014) during the ITU-D study period 2014-2017 � ITU-R/ITU-D JG on WTDC Res.9 2016-04-25
Results:466 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-15