Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 66 ]
�
� |
Liaison statement to ITU-T Study Group 15 on narrowband wireless home networking (copy to ITU-R Working Parties 1A and 5A for information) - Working document towards a preliminary draft new Recommendation ITU-R SM.[G.WNB-FREQ]
�
� |
WP 1B
� |
� |
2016-06-23 |
|
[ 65 ]
�
� |
Liaison statement to Working Parties 1A, 5B and 6A - Studies on WRC-19 agenda item 9.1, issue 9.1.6 - "Wireless power transmission for Electric Vehicles (WPT4EV)"
�
� |
WP 1B
� |
AI9.1
� |
2016-06-20 |
|
[ 64 ]
�
� |
WPT activities
�
� |
European Telecommunications Standards Institute
� |
� |
2016-06-17 |
|
[ 63 ]
�
� |
Liaison to ITU-R Working Parties 1A & 1B on Technical Report on UWB worldwide
�
� |
European Telecommunications Standards Institute
� |
� |
2016-06-17 |
|
[ 62 ]
�
� |
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing ....
�
� |
WP 1B
� |
� |
2016-06-13 |
|
[ 61 ]
�
� |
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information)
�
� |
WP 1B
� |
� |
2016-06-13 |
|
[ 60 ]
�
+Ann.1-17� |
Report on the first 2015-2019 meeting of Working Party 1A (Geneva, 2 - 9 June 2016)
�
� |
Chairman, WP 1A
� |
� |
2016-06-08 |
|
[ 59 ]
�
� |
Final list of participants - Working Party 1A (Geneva, 2-9 June 2016)
�
� |
Director, BR
� |
� |
2016-06-08 |
|
[ 58 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5, ITU-R Study Groups 1, 5, 6 and their relevant Working Parties on ongoing collaboration
�
� |
ITU-D SG 2
� |
� |
2016-06-06 |
|
[ 57 ]
�
� |
List of documents issued (Documents 1A/1 - 1A/57)
�
� |
BR Study Groups Department
� |
� |
2016-06-01 |
|
[ 56 ]
�
� |
Report on CISPR activities June 2015 to May 2016
�
� |
Rapporteur, SG 1 RG on Liaison with CISPR
� |
� |
2016-06-01 |
|
[ 55 ]
�
� |
LED lighting interference to broadcasting services
�
� |
European Broadcasting Union
� |
� |
2016-05-26 |
|
[ 54 ]
�
� |
Support for extension of reports on PLT to cover PLT MIMO devices
�
� |
European Broadcasting Union
� |
� |
2016-05-26 |
|
[ 53 ]
�
� |
Comments to the Report of the WP 1A Rapporteur Group on WPT
�
� |
European Broadcasting Union
� |
� |
2016-05-26 |
|
[ 52 ]
�
� |
Proposed revision of the working document towards a preliminary draft new Report ITU-R SM.[WPT.BEAM]
�
� |
Japan
� |
� |
2016-05-26 |
|
[ 51 ]
�
� |
Proposal of work plan and draft outline for CMP text for WRC-19 agenda item 1.15 and liaison statement to Working Parties 3J, 3K and 3M
�
� |
Japan
� |
AI1.15
� |
2016-05-26 |
|
[ 50 ]
�
� |
Work plan for ITU-R Reports of wireless power transmission - Via radio frequency beam
�
� |
Japan
� |
Q210/1
� |
2016-05-26 |
|
[ 49 ]
�
� |
Revision proposal of Report ITU-R SM.2303 to update information and to incorporate assessment process and methodology in studies on the impact of wireless power transmission systems applied to electric vehicles
�
� |
Japan
� |
Q210/1
� |
2016-05-26 |
|
[ 48 ]
�
� |
Proposed modification of Report ITU-R SM.2351-0 on section "Annex 4 - Smart Grid in Brazil"
�
� |
Brazil (Federative Republic of)
� |
� |
2016-05-26 |
|
[ 47 ]
�
� |
Proposal to set up a Rapporteur Group to revise Recommendation ITU-R SM.851-1
�
� |
Italy
,
Vatican City State
� |
� |
2016-05-25 |
|
[ 46 ]
�
� |
Broadband with speed of light - Visible light communication
�
� |
Netherlands (Kingdom of the)
� |
Q238/1
� |
2016-05-25 |
|
[ 45 ]
�
� |
Activities of the Rapporteur Group on coexistence of wired telecommunication with radiocommunication systems (Questions ITU-R 210-3/1, ITU-R 221-2/1 & ITU-R 236/1)
�
� |
Rapporteur, RG wired and radio
� |
� |
2016-05-25 |
|
[ 44 ]
�
� |
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7
�
� |
WP 5A
� |
� |
2016-05-25 |
|
[ 43 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 4A, 5B, 5C and 5D - Study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications
�
� |
WP 5A
� |
� |
2016-05-25 |
|
[ 42 ]
�
� |
Reply liaison statement to Working Party 1A (copy for information to Working Parties 1B, 5B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
�
� |
WP 5A
� |
� |
2016-05-25 |
|
[ 41 ]
�
� |
Proposed revision of Report ITU-R SM.2303-1
�
� |
Korea (Republic of)
� |
� |
2016-05-25 |
|
[ 40 ]
�
� |
Report ITU-R SM.2351-0 - Smart grid utility management systems
�
� |
Institute of Electrical and Electronics Engineers, Inc.
� |
� |
2016-05-25 |
|
[ 39 ]
�
� |
Liaison statement to External Organizations (copy for information to Working Parties 1A and 5D) - Technical and operational characteristics of the land mobile service applications and their spectrum needs associated with work on WRC-19 agenda item 1.15 in the frequency range 275-450 GHz
�
� |
WP 5A
� |
AI1.15
� |
2016-05-24 |
|
[ 38 ]
�
� |
Liaison statement to ITU-R Working Party 1A
�
� |
Director, BR
� |
� |
2016-05-24 |
|
[ 37 ]
�
� |
Liaison statement to External Organizations (copy for information to Working Parties 1A, 3J, 3K, 3M, 5A and 5D, 7C and 7D) - Technical and operational characteristics of the fixed service applications and their spectrum needs associated with work on WRC-19 agenda item 1.15
�
� |
WP 5C
� |
AI1.15
� |
2016-05-24 |
|
[ 36 ]
�
� |
Information of standardization and application of broadband power line communication in China
�
� |
China (People's Republic of)
� |
� |
2016-05-24 |
|
[ 35 ]
�
� |
Draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around and Earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
China (People's Republic of)
� |
� |
2016-05-24 |
|
[ 34 ]
�
� |
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5B and 6A) - WRC-19 agenda item 1.7
�
� |
WP 5C
� |
AI1.7
� |
2016-05-24 |
|
[ 33 ]
�
� |
Liaison statement requesting technical characteristics for WRC-19 agenda item 1.9.2 from Working Parties 4C, 5A, 5C, 6A, 7B and 7D (copy to Working Parties 1A and 3M for information)
�
� |
WP 5B
� |
AI1.9.2
� |
2016-05-23 |
|
[ 32 ]
�
� |
Liaison to ITU-R WP 1A on aeronautical radars and related spectrum masks
�
� |
ETSI
� |
� |
2016-05-20 |
|
[ 31 ]
�
� |
Reply liaison statement to Working Party 5C copied to Working Party 1A and Working Party 1B for information - Preliminary draft new Report ITU-R F.[FS/RLS COMPATIBILITY IN 71-86 GHZ] - P-P/P-MP applications in the fixed service operating in the 71-76 GHz and 81-86 GHz bands and automotive radar applications in the radiolocation service operating in the 76-77.5 GHz and...
�
� |
WP 5B
� |
� |
2016-05-20 |
|
[ 30 ]
�
� |
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5C and 6A) - WRC-19 agenda item 1.7
�
� |
WP 5B
� |
AI1.7
� |
2016-05-20 |
|
[ 29 ]
�
� |
Liaison statement to Working Party 1A (copied to Working Parties 5D and 6A for information) - Liaison with CENELEC on PLT, EMI and WPT
�
� |
WPs 5A, 5B and 5C
� |
� |
2016-05-19 |
|
[ 28 ]
�
� |
Shortcomings of Recommendation ITU-R SM.1009-1
�
� |
Germany (Federal Republic of)
� |
� |
2016-05-19 |
|
[ 27 ]
�
� |
Proposal to develop a new Report on "General principles and methods for sharing between radiocommunication services"
�
� |
United States of America
� |
� |
2016-05-18 |
|
[ 26 ]
�
� |
Draft liaison statement to ITU-R Working Parties 7C and 7D on passive system characteristics in regards to WRC-19 agenda item 1.15
�
� |
United States of America
� |
AI1.15
� |
2016-05-18 |
|
[ 25 ]
�
� |
Draft liaison statement to ITU-R Working Parties 5A and 5C on service characteristics for systems in the range 275-450 GHz
�
� |
United States of America
� |
� |
2016-05-18 |
|
[ 24 ]
�
� |
Draft liaison statement to ITU-R Working Parties 3J, 3K and 3M on propagation characteristics in the range 275 - 450 GHz
�
� |
United States of America
� |
� |
2016-05-18 |
|
[ 23 ]
�
� |
Proposed editorial modifications of Recommendation ITU-R SM.326-7, Recommendation ITU-R SM.328-11, Recommendation ITU-R SM.1446, Recommendation ITU-R SM.1879-2 and Report ITU-R SM.2158-3
�
� |
United States of America
� |
� |
2016-05-18 |
|
[ 22 ]
�
� |
Reply liaison statement to ITU-R Study Group 1 Working Party 1A on WPT - Study Question ITU-R 210-3/1 "Wireless power transmission"
�
� |
International Special Committee on Radio Interference
� |
� |
2016-05-17 |
|
[ 21 ]
�
(Rev.2)� |
Report of the work of Rapporteur Group on Wireless Power Transmission
�
� |
Rapporteur, RG-WPT
� |
Q210/1
� |
2016-05-13 |
|
[ 20 ]
�
� |
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5
�
� |
ITU-T SG 5
� |
� |
2016-05-13 |
|
[ 19 ]
�
� |
Attendance Report of CISPR meeting
�
� |
Liaison Rapporteur with CISPR on WPT
� |
� |
2016-05-12 |
|
[ 18 ]
�
� |
On the characterization of unwanted emissions of broadband digital systems
�
� |
Germany (Federal Republic of)
� |
� |
2016-05-03 |
|
[ 17 ]
�
� |
Liaison statement on the progress of ongoing work on WTDC Resolution 9 (Rev.Dubai, 2014) during the ITU-D study period 2014-2017
�
� |
ITU-R/ITU-D JG on WTDC Res.9
� |
� |
2016-04-25 |
Results:466 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):