Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 664 ]
�
� |
Views on work plan, timeline, process and deliverables fo "IMT-2020" development
�
� |
Japan
� |
� |
2014-06-10 |
|
[ 663 ]
�
� |
Proposals on the revision of Recommendation ITU-R M.1036-4
�
� |
China (People's Republic of)
� |
� |
2014-06-09 |
|
[ 662 ]
�
� |
Proposed modifications on the working document towards a preliminary draft new Report on coexistence of two TDD networks in the 2 300-2 400 MHz band
�
� |
China (People's Republic of)
� |
� |
2014-06-09 |
|
[ 661 ]
�
� |
Proposal for the working document towards a preliminary draft new Report ITU-R M.[IMT Antenna] - Passive and active antenna systems for base stations of IMT systems
�
� |
China (People's Republic of)
� |
� |
2014-06-09 |
|
[ 660 ]
�
� |
Proposal on PDNR ITU-R M.[IMT above 6 GHz]
�
� |
China (People's Republic of)
� |
� |
2014-06-09 |
|
[ 659 ]
�
� |
Proposal on PDNR ITU-R M.[IMT.ARCH] - Architecture and topology of IMT networks
�
� |
Huawei Technologies Co. Ltd.
� |
� |
2014-06-09 |
|
[ 658 ]
�
� |
Draft liaison to Working Party 4C - Working document towards a preliminary draft revision of Recommendation ITU-R M.1036-4
�
� |
China (People's Republic of)
� |
� |
2014-06-09 |
|
[ 657 ]
�
� |
Proposal on the working document for the draft Report ITU-R M.[IMT beyond trafiic]
�
� |
China (People's Republic of)
� |
� |
2014-06-09 |
|
[ 656 ]
�
� |
Proposal on PDNR ITU-R M.[IMT. Future technology trends]
�
� |
China (People's Republic of)
� |
� |
2014-06-09 |
|
[ 655 ]
�
� |
Principles for defining key capabilities and conceptual figures for future IMT
�
� |
China (People's Republic of)
� |
� |
2014-06-09 |
|
[ 654 ]
�
� |
Proposals on PNDR ITU-R IMT [M.Vision]
�
� |
China (People's Republic of)
� |
� |
2014-06-09 |
|
[ 653 ]
�
� |
Proposals on the preliminary draft new Recommendation ITU-R M.[IMT.VISION]
�
� |
Industrial Technology Research Institute, Inc. (ITRI)
� |
� |
2014-06-06 |
|
[ 652 ]
�
� |
U.S. comments on the Document 5D/599, "Work plan, timeline, process and deliverables for "IMT-2020" development"
�
� |
United States of America
� |
� |
2014-06-09 |
|
[ 651 ]
�
� |
Revision of Report ITU-R M.2290-0 - Future spectrum requirements estimate for terrestrial IMT
�
� |
European Broadcasting Union
� |
� |
2014-06-06 |
|
[ 650 ]
�
� |
Proposal for a revised Recommendation on global circulation of IMT terminals
�
� |
Germany (Federal Republic of)
� |
� |
2014-06-06 |
|
[ 649 ]
�
� |
Proposal for the new work plan for SWG.TRAFFIC in order to finalise a Report ITU-R M.[IMT BEYOND2020.TRAFFIC]
�
� |
Alcatel-Lucent International
,
Alcatel-Lucent USA Inc.
� |
� |
2014-06-06 |
|
[ 648 ]
�
� |
Update of section 5.6 toward revision 12 of Recommendation ITU-R M.1457 (Meeting X+2B notification)
�
� |
Institute of Electrical and Electronics Engineers, Inc.
� |
� |
2014-06-05 |
|
[ 647 ]
�
� |
Channelling arrangements for 694-790 MHz for agenda item 1.2
�
� |
Kenya (Republic of)
� |
� |
2014-06-04 |
|
[ 646 ]
�
� |
Liaison statement to Working Party 5D - Working document toward a preliminary draft new Report ITU-R M.[PPDR] "Public protection an disaster relief communications"
�
� |
WP 5A
� |
� |
2014-06-03 |
|
[ 645 ]
�
� |
Liaison statement to Working Party 5D on local coverage operation of broadband wireless access systems in the bands below 6 GHz
�
� |
WP 5A
� |
� |
2014-06-03 |
|
[ 644 ]
�
� |
Liaison statement to ITU-T FG Innovation, TSAG and Study Group 17 (copy for information to ITU-R Study Group 5, Working Parties 5B, 5C and 5D) - New standardization activities for the International Telecommunication Union - Standardization Sector (ITU-T)
�
� |
WP 5A
� |
� |
2014-06-03 |
|
[ 643 ]
�
� |
Liaison statement to Working Parties 1A, 5A, 5C and 5D regarding development of a Report on aout-of-band emissions in the 2 700-2 900 MHz frequency band from sevice operating below 2 690 MHz
�
� |
WP 5B
� |
� |
2014-05-30 |
|
[ 642 ]
�
� |
Liaison statement to Working Party 1B (copied to Working Parties 5B, 5C and 5D for information) - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities
�
� |
WP 5A
� |
� |
2014-05-30 |
|
[ 641 ]
�
� |
Liaison statement to ITU-T Study Groups 5, 9, 15 and ITU-R Working Party 1A (copied for information to ITU-R Working Parties 5A, 5C, 5D and 6A) - Liaison statement on cexistence of wired telecommunications with radiocommunication systems
�
� |
WP 5B
� |
� |
2014-05-30 |
|
[ 640 ]
�
� |
Liaison statement to Working Party 1B (copied for information to ITU-R Working Parties 5A, 5C and 5D) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS]
�
� |
WP 5B
� |
� |
2014-05-30 |
|
[ 639 ]
�
� |
Response to ITU-R Working Party 5D regarding study on technical feasibility of IMT in the bands above 6 GHz
�
� |
Director, BR
� |
� |
2014-05-29 |
|
[ 638 ]
�
� |
Liaison statement to ITU-R Working Parties 5A and 5D ITU-T Study Groups 13 and 15 (copy for information to ITU-D Study Group 2, BBF, MEF] - Working document towards a preliminary draft new Report ITU-R F.[FS.IMT/BB] - Use of fixed sevice for backhaul for IMT and other terrestrial mobile broadband systems
�
� |
WP 5C
� |
� |
2014-05-28 |
|
[ 637 ]
�
� |
Liaison statement to Working Parties 5A and 5D - Preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends
�
� |
WP 5C
� |
� |
2014-05-28 |
|
[ 636 ]
�
(Rev.1)� |
Liaison statement on Assistive Listening Devices (ALD) and the allocation of Mobile Phone Services in the 2.3-2.4 GHz band
�
� |
JCA-AHF
� |
� |
2014-05-26 |
|
[ 635 ]
�
� |
Response to liaison statement to external organizations architecture and topology of IMT networks
�
� |
Alcatel-Lucent USA Inc.
,
Qualcomm, Inc.
� |
� |
2014-05-21 |
|
[ 634 ]
�
� |
M.1457-11 update package for TDMA-SC in response to Circular Letter 5/LCCE/42
�
� |
Alliance for Telecommunications Industry Solutions
� |
� |
2014-05-15 |
|
[ 633 ]
�
� |
Further information for updated material on LTE-Advanced toward Rev. 2 of Recommendation ITU-R M.2012
�
� |
Alliance for Telecommunications Industry Solutions
� |
� |
2014-05-15 |
|
[ 632 ]
�
� |
Channelling arrangement for the 694-790 MHz band - WRC-15 agenda item 1.2
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2014-05-14 |
|
[ 631 ]
�
� |
Proposed additions to the working document towards a Handbook on global trends in IMT ITU-R M.[IMT.HANDBOOK]
�
� |
Canada
� |
� |
2014-05-09 |
|
[ 630 ]
�
� |
Possible updating of ITU-R Resolutions and Opinion on IMT
�
� |
Chairman, SG 5
� |
� |
2014-05-08 |
|
[ 629 ]
�
� |
Review of the Study Group 5 Questions assigned to the Working Parties
�
� |
Chairman, SG 5
� |
� |
2014-05-08 |
|
[ 628 ]
�
� |
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5C, 5D, ITU-T Study Group 15 Question 1 and ITU-T Study Group 13 Question 15 - Access technology for broadband telecommunications including IMT, for developing countries
�
� |
ITU-D SG 2
� |
� |
2014-04-29 |
|
[ 627 ]
�
� |
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, Joint Task Group 4-5-6-7 and the Special Commitee as responsible Groups for WRC-15 agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2., 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)
�
� |
World Meteorological Organization
� |
� |
2014-04-28 |
|
[ 626 ]
�
� |
Liaison statement on new versions of the Access Network Transport (ANT) standardization overview and work plan
�
� |
ITU-T SG 15
� |
� |
2014-04-22 |
|
[ 625 ]
�
� |
Update Report on CITEL PCC.II activities
�
� |
CITEL Rapporteur
� |
� |
2014-04-22 |
|
[ 624 ]
�
� |
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4B, 4C, 5A, 5C and 5D) - Development of draft new Recommendation on main functionalities of consumer receivers for worlwide broadcasting roaming
�
� |
WP 6A
� |
� |
2014-04-11 |
|
[ 623 ]
�
� |
Liaison statement to Working Party 5A (copy for information to Working Parties 5C and 5D) - The use of mobile broadband networks for Electronic news gathering (ENG) apllications in the mobile service
�
� |
WP 6A
� |
� |
2014-04-10 |
|
[ 622 ]
�
� |
Liaison statement on fixed service backhaul networks for IMT and other terrestrial mobile broadband systems
�
� |
ITU-T SG 13
� |
� |
2014-04-07 |
|
[ 621 ]
�
� |
Update material for CDMA MC for ITU-R Recommendation ITU-R M.1457-12 (TIA)
�
� |
Director, BR
� |
� |
2014-04-03 |
|
[ 620 ]
�
� |
Liaison statement on initiating collaboration on IMT Systesm work
�
� |
ITU-T SG 13
� |
� |
2014-04-07 |
|
[ 619 ]
�
� |
Liaison statement to Working Party 5D - Channelling arrangements for 694-790 MHz for agenda item 1.2
�
� |
JTG 4-5-6-7
� |
� |
2014-03-26 |
|
[ 618 ]
�
� |
Liaison statement on technical feasibility of IMT in the bands above 6 GHz
�
� |
Director, BR
� |
� |
2014-03-11 |
|
[ 617 ]
�
� |
Liaison statement to WP 5D - Spectrum estimation for terrestrial IMT
�
� |
JTG 4-5-6-7
� |
� |
2014-03-04 |
|
[ 616 ]
�
� |
DECT information regarding the update of Recommendation ITU-R M.1457
�
� |
European Telecommunications Standards Institute
� |
� |
2014-02-24 |
|
[ 615 ]
�
+Ch.1-7� |
Report on the eighteenth meeting of Working Party 5D (Viet Nam, 12-19 February 2014)
�
� |
Chairman, WP 5D
� |
� |
2014-02-24 |
Results:1064 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):