International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:681 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 281 ]
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3 � United States of America 2013-09-20
[ 280 ]
Liaison statement - Request to provide security contacts � ITU-T SG 17 2013-09-23
[ 279 ]
Feasibility estimation for sharing between fixed-satellite service (Space-to-Earth) and Space operations service (Earth-to-Space) IN 7 GHz band � Russian Federation 2013-09-19
[ 278 ]
Sharing feasibility of the fixed satellite service (Space-to-Earth) with the Earth exploration satellite service (active) in the frequency range 13.25-13.75 GHz � Russian Federation 2013-09-19
[ 277 ]
Working document - Elements to the text of CPM Report, agenda items 9.1.2 and 7 � Russian Federation 2013-09-19
[ 276 ]
Draft liaison statement to Working Party 5C - WRC-15 agenda item 1.6.1 � Russian Federation 2013-09-19
[ 275 ]
Proposed modifications to working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 1 � Russian Federation 2013-09-19
[ 274 ]
The effect of the value of the interference criterion T/T on the number of potentially affected networks � Russian Federation 2013-09-19
[ 273 ]
Recommendation ITU-R SM.1541-5 - Unwanted emissions in the out-of-band domain � SG 1 2013-09-19
[ 272 ]
Proposed modification to Working Document (for Working Party 4B for information purpose only) - Possible modification of Recommendation ITU-R S.1432-1 and development of long-term and short term interference criteria � Japan 2013-09-18
[ 271 ]
Proposed additional element to Working Document on technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7 - Consideration on the difference between ^T/T and C/I � Japan 2013-09-18
[ 270 ]
A preliminary draft revision of Report ITU-R BO.2007-1 - Considerations for the introduction of broadcasting-satellite service high-definition television systems � Japan 279/4 2013-09-18
[ 269 ]
[Some elements of] a Working Document towards a preliminary draft new Report ITU-R S.[ESV] on the interference effect of transmissions for earth stations on board vessels operating in fixed-satellite service networks on terrestrial co-frequency stations � Japan 2013-09-18
[ 268 ]
Working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHz COMPATIBILITY] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space) � Korea (Republic of) 2013-09-17
[ 267 ]
A preliminary draft revision of Report ITU-R BO.2007-1 - Considerations for the introduction of broadcasting satellite service high definition television and ultra high definition television systems � Korea (Republic of) 2013-09-17
[ 266 ]
Proposed modifications to the working document towards Draft CPM Text on WRC-15 agenda item 1.7 � China (People's Republic of) 2013-09-18
[ 265 ]
Working document towards a preliminary draft new Recommendation - Method for determining coordination distances, in the band 5 091-5 150 MHz, between stations operating in the aeronautical radionavigation service and non-geostationary mobile satellite service stations providing feeder uplink services � China (People's Republic of) 2013-09-18
[ 264 ]
Preliminary reflection with regard to the studies under Resolution 11 (WRC-12): Use of satellite orbital slots and associated frequency spectrum to deliver international public telecommunications services � Tanzania (United Republic of) , Uganda (Republic of) 2013-09-18
[ 263 ]
Proposal for amendment to Recommendation ITU R S.1717 - Electronic data file format for earth station antenna patterns � Bulgaria (Republic of) 280/4 2013-09-18
[ 262 ]
Reply liaison statement to Working Party 4A regarding WRC-15 - Agenda item 1.6: FSS deployment model � WP 7C 2013-09-17
[ 261 ]
Information on the preparation of texts for the draft CPM Report to WRC-15 � Chairman, CPM-15 2013-09-10
[ 260 ]
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment of the frequency reuse factor � Luxembourg 2013-08-09
[ 259 ]
Liaison statement to ITU-R Study Groups 4, 6 and 7 and to ITU-T Study Group 5 - The effect on Telecommunications of an extreme solar event � WP 3L 2013-07-25
[ 258 ]
Liaison statement to Working Party 4A - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments � WP 5D 2013-07-23
[ 257 ]
Liaison statement to Working Parties 5B and 4A - Revision of Recommendation ITU-R M.1580-4 and ITU-R M.1581-4 and start of work towards - Two preliminary draft new Recommendations ITU-R M.[IMT.OOBE.X] on generic unwanted emission characteristics of base stations and mobile stations using the terrestrial radio interfaces of IMT-Advanced � WP 5D 2013-07-22
[ 256 ]
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 1A, 1B, 4A and 5A for information) - Status of compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments � WP 5D 2013-07-17
[ 255 ]
Liaison statement to Study Group 4, Working Party 5B, Study Group 7 and ICAO - Request for measured data in connection with Question ITU-R 233/3 and Recommendation ITU-R P.528 � WP 3K 233/3 2013-07-05
[ 254 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[WHITE-SPACE] - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities � WP 1B 2013-06-21
[ 253 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5C, 5D, 7B, 7C and 7D - WRC-15 agenda item 9.1, Issue 9.1.6 - Resolution 957 (WRC-12) - Studies towards review of the definitions of fixed service, fixed station and mobile station � WP 1B 2013-06-21
[ 252 ]
Liaison statement to Working Party 4C (copy to Working Party 4A) - WRC-15 agenda item 1.10 � WP 5B 2013-06-12
[ 251 ]
Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.6 � WP 5B 2013-06-12
[ 250 ]
Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.8 � WP 5C 2013-06-05
[ 249 ]
Liaison statement to Working Party 4A (copy to Working Parties 5A and 7B for information) - WRC-15 agenda item 1.9.1 � WP 5C 2013-06-05
[ 248 ]
Liaison statement to Working Party 4A - WRC-15 agenda item 1.6 � WP 5C 2013-06-05
[ 247 ]
Liaisons statement to Working Party 4A - Proposed suppression of certain SF-series Recommendations � WP 5C 2013-06-05
[ 246 ]
Liaison statement to Working Party 4A - WRC-15 agenda item 1.6 � WP 5A 2013-06-05
[ 245 ]
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 agenda item 1.1 � WP 5A 2013-06-04
[ 244 ]
Liaison statement on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHF frequency range (COM 16-LS 14) [to ITU-R WP 5A and ITU-T SG 16] � ITU-T JCA-AHF 2013-05-23
[ 243 ]
Liaison statement on nomination of JCA-AHF representatives � ITU-T JCA-AHF 2013-05-14
[ 242 ]
+Ann.1-36
Report on the meeting of Working Party 4A (Geneva, 2-10 May 2013) � Chairman, WP 4A 2013-05-10
[ 241 ]
Final list of participants - Working Party 4A (Geneva, 2-10 May 2013) � Director, BR 2013-05-10
[ 240 ]
Clarification to the survey of status of FSS assignments in the MIFR in the 10.95-30.0 GHz bands (WRC-15 Agenda item 1.5) � Director, BR 2013-05-06
[ 239 ]
Liaison Statement to Working Party 4A - [Preliminary] draft new Report ITU-R S.[VSAT] � WP 4B 2013-05-03
[ 238 ]
Reply liaison statement to Working Party 5B (copy for information to Working Party 4A) - WRC-15 Agenda item 1.5 � WP 4B 2013-05-03
[ 237 ]
List of documents issued (Documents 4A/125 - 4A/237) � Br Study Groups Department 2013-05-01
[ 236 ]
Working document - Examination under � 2.2 of Annex 4 of Appendix 30B � Luxembourg 2013-04-25
[ 235 ]
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO) � Luxembourg 2013-04-25
[ 234 ]
WRC-15 Agenda item 1.6.1/1.6.2: Consideration of the band 14.5 - 14.8 GHz � Intelsat, LLC 2013-04-25
[ 233 ]
US broadcasters'submission in response to the FCC's notice of proposed rule making concerning the amendment of the Commission's rules with regard to commercial operations in the 3 550-3 650 MHz band � North American Broadcasters Association (NABA) 2013-04-24
[ 232 ]
Technical criteria used in application of RR No.9.41 in respect of coordination under RR No.9.7 � Telenor ASA 2013-04-25
Results:681 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2015-11-16