International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5C : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5C� C�

ITU-R�WP5C

Fixed wireless systems; HF systems in the Fixed and Land Mobile Services

Results:603 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 203 ]
Additional CG Report on the draft revision of Recommendation ITU-R F.758-4 - Draft revision of Recommendation ITU-R F.758-4 with all the modifications to the original text of the Recommendation � Coordinator of CG-Rec758 2009-05-11
[ 202 ]
CG Report on the draft revision of Recommendation ITU-R F.758-4 - Draft revison of Recommendation ITU-R F.758-4 with the modifications made by the CG activity � Coordinator of CG-Rec758 2009-05-11
[ 201 ]
Review of the F-series Recommendations in Document 5/114, which are under the responsibility of Working Party 5A or the joint responsibility of Working Parties 5A and 5C � Japan 2009-05-11
[ 200 ]
Review of certain F-series Recommendations developed by the former Working Party 9D � Japan 2009-05-11
[ 199 ]
Consideration on the working document towards a preliminary draft revision of Recommendation ITU-R F.1336-2 - Reference radiation patterns of omnidirectional, sectoral and other antennas in point-to-multipoint systems for use in sharing studies in the frequency range from 1 GHz to about 70 GHz � Japan 202/9 2009-05-11
[ 198 ]
Preliminary draft revision of Report ITU-R F.2106 - Fixed service applications using free-space optical links � Japan 245/5 2009-05-11
[ 197 ]
[Working document towards a preliminary draft new Report ITU-R F.[CROSS-BORDER]] � Brazil (Federative Republic of) 2009-05-11
[ 196 ]
Review of the SF-series Recommendations contained in document 5/114 � Japan 2009-05-11
[ 195 ]
Review of the F-series Recommendations in Document 5/114, which are under the responsibility of Working Party 5C � Japan 2009-05-11
[ 194 ]
Information regarding studies under Question ITU-R 232-1/7 � United Kingdom of Great Britain and Northern Ireland 2009-05-12
[ 193 ]
Liaison statement to Working Party 5C - Methodology for statistically calculating the interference received by the fixed service from space-to-Earth emissions for frequency bands above about 17 GHz � WP 4A 2009-05-11
[ 192 ]
Liaison statement to Working Party 5C - Consideration of technical and regulatory issues relative to the fixed service in the bands between 71 GHz and 238 GHz (WRC-11 Agenda item 1.8) � WP 4A 2009-05-11
[ 191 ]
Liaison statement to Working Party 5C - Gateway links for high altitude platform stations in the range from 5 850 to 7 075 MHz (WRC-11 Agenda item 1.20) � WP 4A 2009-05-11
[ 190 ]
Proposed guidance on the feasibility of harmonization of spectrum for ENG use � United Arab Emirates 2009-05-10
[ 189 ]
Preliminary draft new Recommendation ITU-R F.[HAPS CHAR] - Technical and operational characteristics of gateway links in the fixed service using high altitude platform stations to be used in sharing studies in the band 5 850-7 075 MHz � Korea (Republic of) 2009-05-11
[ 188 ]
Working document towards a preliminary draft new Recommendation ITU-R F.[HAPS MODELLING] - Interference analysis modelling for sharing between HAPS gateway links and existing services in the range 5 850-7 075 MHz � Korea (Republic of) 2009-05-11
[ 187 ]
Proposed draft reply liaison statement to Working Party 1B on the study of software defined and cognitive radio systems (Agenda 1.19) � Canada 2009-05-07
[ 186 ]
Working document on WRC-11 Agenda item 1.8 for further discussion within Working Party 5C - Fixed wireless services in the band 71 GHz to 238 GHz � Canada 2009-05-07
[ 185 ]
Elements for a reply liaison to Working Party 5B - Fixed radio use of the 138-144 and 154-156 MHz bands related to WRC-11 Agenda item 1.14 � Canada 2009-05-07
[ 184 ]
Modification of Recommendation ITU-R F.1245-1 � Canada 2009-05-07
[ 183 ]
Proposed draft reply liaison statement to Working Party 1A - Interference issues from power line telecommunication systems using electricity supply wiring � Canada 2009-05-07
[ 182 ]
Protection criteria for sharing between the aeronautical mobile service and the fixed service in the band 37-38 GHz � Canada 2009-05-07
[ 181 ]
Working document towards a preliminary draft new Report - Sharing between the aeronautical mobile service and the fixed service in the band 37-38 GHz � France 2009-05-07
[ 180 ]
Preliminary draft revision to Recommendations ITU-R F.1249 and F.1509 � France , Japan 2009-05-07
[ 179 ]
Working document towards draft CPM text on WRC-11 Agenda item 1.12 - Agenda item 1.12 (Working Party 7B / Working Party 4A, Working Party 5B, Working Party 5C, (Working Party 5A)) � France 2009-05-07
[ 178 ]
WRC-11 Agenda item 1.8 - Compatibility between passive services and the fixed service in the bands 71-76 GHz and 81-86 GHz � France 2009-05-07
[ 177 ]
Working document towards text for the draft Conference Preparatory Meeting Report on WRC-11 Agenda item 1.20 - Potential interference from high altitude platform station (HAPS) feeder links into feeder downlinks in the Mobile-Satellite Service � United States of America 2009-05-06
[ 176 ]
Draft liaison statement to ITU-R Working Party 5A (copy to ITU-R Working Party 5B for information) - On the study of Software-Defined Radio (SDR) and Cognitive Radio Systems (CRS) � United States of America 241-1/5 2009-05-06
[ 175 ]
Working document towards a preliminary draft new Recommendation ITU-R F.[HAPS MODELLING] (WRC-11 Agenda item 1.20) - Earth station and geostationay orbit space station deployment in the 5 850-6 725 MHz band (WRC-11 Agenda item 1.20) � United States of America 2009-05-06
[ 174 ]
Interference modelling between HAPS gateway links and the fixed-satellite service in the 5 850-7 075 MHz band � United States of America 2009-05-06
[ 173 ]
Proposed revisions to Document 5C/129 (Annex 11), and a preliminary draft new Recommendation for evaluation of interference from high altitude platform gateway links to fixed wireless systems in the range 5 850 to 7 025 MHz � United States of America 2009-05-06
[ 172 ]
Studies of the interference from proposed HAPS platform stations to Fixed Service point-to-point receivers in the 6 GHz band � United States of America 2009-05-06
[ 171 ]
Contribution to the considerations of WRC-11 Agenda item 1.13 � United States of America 2009-05-06
[ 170 ]
Analysis of WARC-79, WRC-95 and WRC-97 decisions related to the coordination procedure of frequency assignments for a station of fixed and land mobile services � Russian Federation 2009-05-06
[ 169 ]
Sharing of the Radiolocation Service with the FS in the frequency band 154-156 MHz � Russian Federation 2009-05-06
[ 168 ]
Preliminary result of assess interference from HAPS gateway links into the FSS Plan allotments (Appendix 30B RR) in the frequency band 6725 - 7025 MHz ( WRC-11 Agenda Item 1.20) � Russian Federation 2009-05-06
[ 167 ]
ITU-R Study Group 4 Question to be brought to the attention of Study Groups 5 and 7 � BR Study Group Department 2009-05-04
[ 166 ]
Liaison statement to Coordination Committee for Vocabulary (CCV), Working Parties 4A, 4A, 5A and 5C - Proposed definitions for "integrated MSS system" and "hybrid satellite/terrestrial system" � WP 4B 2009-04-28
[ 165 ]
Clarification of the responsibility for the work on land mobile systems below 3 MHz � Chairmen, WP 5A and WP 5C 2009-04-24
[ 164 ]
Information on activities and output documents of ITU-T Focus Group ICTs & CC � Chairman ITU-T FG ICTs & CC 2009-04-02
[ 163 ]
(Rev.1)
Study on potential interference into fixed service receivers in Region 2 in the 21.4-22 GHz band from broadcasting-satellite service systems in Regions 1 and 3 � Canada 2009-04-01
[ 162 ]
Liaison statement to Working Parties 4A and 5C (copy to Working Party 5A for information) - Draft CPM text on WRC-11 Agenda item 1.12 � WP 7B 2009-03-17
[ 161 ]
Liaison statement to Radiocommunication Study Groups and Working Parties � Chairman, CCV 2009-03-20
[ 160 ]
Liaison statement to ITU-R Study Group 3 and Working Parties 4A, 4C, 5A, 5B, 6A, 7C, 7D (copy to WPs 5C, 5D, 6C and 7B for information) on the study of software-defined radio and cognitive radio systems � WP 1B 2009-03-19
[ 159 ]
Liaison statement - Progress on WRC-11 Agenda item 1.11 - Sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz � WP 7B 2009-03-18
[ 158 ]
Liaison statement - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz � WP 1A 2009-03-17
[ 157 ]
Liaison statement (copy to Working Parties 3M, 5A and 5C for information) - Study of in-band sharing and adjacent band protection of HIBLEO-2 type non-GSO-to-non-GSO inter-satellite links from the emissions of SRS earth stations in the 23 GHz band � WP 7B 2009-03-17
[ 156 ]
Liaison statement to Working Party 5C - Sharing analysis between non-GSO meteorological satellite systems operating in the space-to-Earth direction and fixed service systems in the band 7 850-7 900 MHz � WP 7B 2009-03-17
[ 155 ]
Liaison statement (copy to Working Parties 5A and 5B for information) - Draft CPM text on WRC-11 Agenda item 1.24 � WP 7B 2009-03-17
[ 154 ]
ITU-R Study Group 7 Recommendation to be brought to the attention of Study Group 5 � BR Study Group Department 2009-03-10
Results:603 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2011-12-16