Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1588 ]
�
(Rev.1)� |
Input for G.8021.1 Clauses 8.1 and 8.2
�
� |
Ciena Corporation
� |
Q9/15
� |
2011-11-18 |
|
[ 1587 ]
�
(Rev.1)� |
Proposal for text concerning packet selection in G.8260
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2011-11-18 |
|
[ 1586 ]
�
(Rev.1)� |
Discussion on reference points and network limits in G.8271
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2011-11-18 |
|
[ 1585 ]
�
(Rev.1)� |
Input for G.8021.1 Clause 8
�
� |
Ciena Corporation
� |
Q9/15
� |
2011-11-18 |
|
[ 1584 ]
�
� |
Withdrawn: Duplicate of C-1585
�
Withdrawn
� |
Ciena Corporation
� |
� |
2011-11-18 |
|
[ 1583 ]
�
(Rev.1)� |
Proposal for network limits in G.8271
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2011-11-18 |
|
[ 1582 ]
�
(Rev.1)� |
Input for G.8021.1 Appendix A
�
� |
Ciena Corporation
� |
Q9/15
� |
2011-11-18 |
|
[ 1581 ]
�
(Rev.1)� |
Proposal for Distributed G.8031 Amendment
�
� |
Fujitsu Network Communications, Inc.
� |
Q9/15
� |
2011-11-18 |
|
[ 1580 ]
�
(Rev.1)� |
Proposal for Distributed G.873.1 Amendment
�
� |
Fujitsu Network Communications, Inc.
� |
Q9/15
� |
2011-11-18 |
|
[ 1579 ]
�
(Rev.1)� |
Comments on the recent G.798 change for the dTLC contribution to aAIS and aTSF
�
� |
PMC-Sierra, Inc.
� |
Q9/15
� |
2011-11-18 |
|
[ 1578 ]
�
(Rev.1)� |
Network Defect Handling for Hitless Adjustment to ODUflex(GFP) (HAO) During Bandwidth Resizing (BWR)
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2011-11-18 |
|
[ 1577 ]
�
(Rev.1)� |
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Measurement Time References
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2011-11-18 |
|
[ 1576 ]
�
(Rev.1)� |
ODUflex related extensions to information model in G.874.1
�
� |
Infinera Corporation
� |
Q14/15
� |
2011-11-18 |
|
[ 1575 ]
�
(Rev.1)� |
Mapping between G.798 atomic functions and G.874.1 managed objects
�
� |
Infinera Corporation
� |
Q14/15
� |
2011-11-18 |
|
[ 1574 ]
�
(Rev.1)� |
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Latency-based Approach
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2011-11-18 |
|
[ 1573 ]
�
(Rev.1)� |
Flexible Rate OTU signal
�
� |
Finisar Corporation
,
Infinera Corporation
,
Verizon Communication Corporation
� |
Q6/15, Q12/15, Q11/15
� |
2011-11-18 |
|
[ 1572 ]
�
(Rev.1)� |
G.inp: Crosstalk management in PET mode
�
� |
Metanoia Technologies, Inc.
� |
Q4/15
� |
2011-11-18 |
|
[ 1571 ]
�
(Rev.1)� |
G.8263 : PEC-S-F state under limits of noise tolerance
�
� |
Cisco Systems, Inc.
� |
Q13/15
� |
2011-11-18 |
|
[ 1570 ]
�
(Rev.1)� |
Utilization of IP mapping for hop-by-hop BC model
�
� |
Cisco Systems, Inc.
� |
Q13/15
� |
2011-11-18 |
|
[ 1569 ]
�
(Rev.1)� |
Two-step clock issue with multicast transmission
�
� |
Cisco Systems, Inc.
� |
Q13/15
� |
2011-11-18 |
|
[ 1568 ]
�
� |
Proposal and Comments on MPLS-TP
�
� |
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
� |
Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15
� |
2011-11-18 |
|
[ 1567 ]
�
� |
Principle of Cooperation and Lines of Responsibility
�
� |
AT&T, Inc.
,
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
� |
QALL/15
� |
2011-11-18 |
|
[ 1566 ]
�
� |
Proposed text for G.8121.2 for Performance Monitoring processes
�
� |
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q9/15
� |
2011-11-18 |
|
[ 1565 ]
�
� |
Proposed text for G.8121.2 for Lock Instruct and Loopback processes
�
� |
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q9/15
� |
2011-11-18 |
|
[ 1564 ]
�
(Rev.1)� |
Holdover specification in G.8263
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2011-11-18 |
|
[ 1563 ]
�
(Rev.1)� |
Discussion on Architecture and BMC algorithm for the Time Sync Telecom Profile (G.8275 and G.8275.1)
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2011-11-18 |
|
[ 1562 ]
�
(Rev.1-2)� |
Proposed OAM management added to the new draft recommendation G.8152
�
� |
ZTE Corporation
� |
Q14/15
� |
2011-11-18 |
|
[ 1561 ]
�
(Rev.1)� |
PTP Mapping in the first Time Sync Telecom Profile (G. 8275.1)
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2011-11-18 |
|
[ 1560 ]
�
(Rev.1)� |
Proposal of study point for optical submarine cable system in the next Study Period
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q8/15
� |
2011-11-18 |
|
[ 1559 ]
�
(Rev.1)� |
Proposed text about alarm management added to the new draft recommendation G.8152
�
� |
ZTE Corporation
� |
Q14/15
� |
2011-11-18 |
|
[ 1558 ]
�
(Rev.1)� |
Proposed text about performance management added to the new draft recommendation G.8152
�
� |
ZTE Corporation
� |
Q14/15
� |
2011-11-18 |
|
[ 1557 ]
�
(Rev.1)� |
Proposed text about the pseudo-wire(PW) added to the new draft recommendation G8152
�
� |
ZTE Corporation
� |
Q14/15
� |
2011-11-18 |
|
[ 1556 ]
�
(Rev.1)� |
Information and proposal on MPI measurement
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q5/15
� |
2011-11-18 |
|
[ 1555 ]
�
(Rev.1)� |
Proposal about use cases for MPLS-TP OAM management in G.8152
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2011-11-18 |
|
[ 1554 ]
�
(Rev.1)� |
Proposals about OTN failure and probable cause mapping for G.7710
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2011-11-18 |
|
[ 1553 ]
�
(Rev.1)� |
Comments on the DCN Management for G.7710
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2011-11-18 |
|
[ 1552 ]
�
(Rev.1)� |
Proposal of upgraded multiple wavelength PON network architecture
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2011-11-18 |
|
[ 1551 ]
�
(Rev.1)� |
Consideration on XG-PON coexistence ODN architecture for G.987.1
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2011-11-18 |
|
[ 1550 ]
�
(Rev.1)� |
Proposal to add RS232/RS485 interface service ME in G.988
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2011-11-18 |
|
[ 1549 ]
�
(Rev.1)� |
The support of XGPON for serial devices in the smart grid
�
� |
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
� |
Q2/15
� |
2011-11-18 |
|
[ 1548 ]
�
� |
Withdrawn, duplicate of C-1549
�
Withdrawn
� |
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
� |
Q2/15
� |
2011-11-18 |
|
[ 1547 ]
�
(Rev.1)� |
Proposal on Questions of Q5/15 for next study period
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q5/15
� |
2011-11-18 |
|
[ 1546 ]
�
(Rev.1)� |
Comments and proposal on revision of G.657
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q5/15
� |
2011-11-18 |
|
[ 1545 ]
�
(Rev.1)� |
Proposal for change of test signal in O.173
�
� |
Communications and Information network Association of Japan (CIA
� |
Q15/15
� |
2011-11-18 |
|
[ 1544 ]
�
(Rev.1)� |
Proposal for editorial modifications of Revised Draft O.173
�
� |
Communications and Information network Association of Japan (CIA
� |
Q15/15
� |
2011-11-18 |
|
[ 1543 ]
�
(Rev.1)� |
Proposal for editorial modifications of Draft O.xgponjitter
�
� |
Communications and Information network Association of Japan (CIA
� |
Q15/15
� |
2011-11-18 |
|
[ 1542 ]
�
(Rev.1)� |
G.8080 - SP10 - Call Routing Discussion
�
� |
Ciena Canada
� |
Q14/15, Q12/15
� |
2011-11-17 |
|
[ 1541 ]
�
(Rev.1)� |
G.7044 impact on G.7713
�
� |
Ciena Canada
� |
Q14/15, Q11/15
� |
2011-11-17 |
|
[ 1540 ]
�
(Rev.1)� |
Proposed DRNI work item
�
� |
Ericsson Canada, Inc.
� |
Q9/15
� |
2011-11-17 |
|
[ 1539 ]
�
(Rev.1)� |
Proposed G.8021.1
�
� |
Ericsson Canada, Inc.
� |
Q9/15, Q10/15
� |
2011-11-17 |
Resultats:420 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):