Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 565 ]
�
� |
Proposed changes to working document towards draft CPM text for WRC-19 agenda item 1.5
�
� |
Australia
� |
AI1.5
� |
2018-02-12 |
|
[ 564 ]
�
� |
WRC-19 agenda item 9.1, issue 9.1.9 - Compatibility of fixed-satellite service with IMT-2020 applications of the mobile service in 51.4-52.4 GHz
�
� |
Australia
� |
AI9.1
� |
2018-02-12 |
|
[ 563 ]
�
� |
Working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9
�
� |
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
� |
AI9.1
� |
2018-02-09 |
|
[ 562 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[50/40 GHz ADJACENT BAND STUDIES]
�
� |
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
� |
AI1.6
� |
2018-02-09 |
|
[ 561 ]
�
� |
Preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9
�
� |
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
� |
AI9.1
� |
2018-02-09 |
|
[ 560 ]
�
� |
Input on preliminary draft CPM text for WRC-19 agenda item 7 - Issue K
�
� |
Papua New Guinea
� |
AI7
� |
2018-02-12 |
|
[ 559 ]
�
� |
Liaison statement - New ITU-T Study Group 13 terms and definitions
�
� |
ITU-R CCV, ITU-T SCV
� |
� |
2018-02-09 |
|
[ 558 ]
�
� |
Proposed updates to preliminary draft CPM text for WRC-19 agenda item 7 - Issue J
�
� |
Korea (Republic of)
� |
AI7
� |
2018-02-08 |
|
[ 557 ]
�
� |
Proposed modifications to working document toward draft CPM text for WRC-19 agenda item 1.5
�
� |
Korea (Republic of)
� |
AI1.5
� |
2018-02-08 |
|
[ 556 ]
�
� |
Proposed updates to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS]
�
� |
Korea (Republic of)
� |
AI1.5
� |
2018-02-08 |
|
[ 555 ]
�
� |
Update on the sharing study with MS stations and aeronautical ESIM
�
� |
Korea (Republic of)
� |
AI1.5
� |
2018-02-08 |
|
[ 554 ]
�
� |
Modifications to the draft CPM text of agenda item 7, Issue B
�
� |
Spain
,
HISPASAT, S.A.
� |
AI7
� |
2018-02-07 |
|
[ 553 ]
�
� |
Maritime-ESIM coexistence with FS stations
�
� |
Germany (Federal Republic of)
� |
� |
2018-02-06 |
|
[ 552 ]
�
� |
Proposed modification to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz
�
� |
Japan
� |
AI1.5
� |
2018-02-06 |
|
[ 551 ]
�
� |
Proposed modification to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz
�
� |
Japan
� |
AI1.5
� |
2018-02-06 |
|
[ 550 ]
�
� |
Proposed modifications to working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2
�
� |
Japan
� |
AI9.1
� |
2018-02-06 |
|
[ 549 ]
�
� |
Proposed modifcations to working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]
�
� |
Japan
� |
AI9.1
� |
2018-02-06 |
|
[ 548 ]
�
� |
Proposal for amendments of CPM text - WRC-19 agenda item 7, Issue J - Modification of Section 1, Annex 1 of RR AP30, pfd limit
�
� |
Japan
� |
AI7
� |
2018-02-06 |
|
[ 547 ]
�
� |
Proposal for amendments of CPM text - WRC-19 agenda item 7, Issue G - Updating the reference situation for Region 1 and 3 networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments
�
� |
Japan
� |
AI7
� |
2018-02-06 |
|
[ 546 ]
�
� |
Proposal for the further discussion on working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the brining into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands
�
� |
Japan
� |
AI7
� |
2018-02-06 |
|
[ 545 ]
�
� |
Proposed updates to the working document towards draft CPM text for agenda item 9.1, issue 9.1.2
�
� |
France
� |
AI9.1
� |
2018-02-05 |
|
[ 544 ]
�
� |
Draft Note to Director, Radiocommunication Bureau - Cost recovery for non-Geostationary satellite systems
�
� |
United States of America
� |
� |
2018-01-26 |
|
[ 543 ]
�
� |
Draft Note to the BR Director - Cost recovery for non-GSO satellite networks
�
� |
Luxembourg
� |
� |
2018-01-15 |
|
[ 542 ]
�
� |
Cost recovery for non-GSO satellite systems
�
� |
Director, BR
� |
� |
2018-01-08 |
|
[ 541 ]
�
� |
Liaison statement to Working Parties 1C, 4A and 7C - Standards for broadcasting-satellite receiving equipment
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 540 ]
�
� |
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 539 ]
�
� |
Liaison statement to CISPR and ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 4A, 4B and 7C) - Interference from broadcasting-satellite receiving equipment
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 538 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Party 1C for information) - WRC-19 agenda item 9.1, issue 9.1.7
�
� |
WP 1B
� |
AI9.1
� |
2017-12-08 |
|
[ 537 ]
�
� |
Liaison statement on information about work that is being carried out which is under study in ITU-T Q3/5; ITU-R and ITU-D
�
� |
ITU-T SG 5
� |
� |
2017-11-23 |
|
[ 536 ]
�
� |
Liaison statement to Working Party 4A - Updated receiver characteristics of systems in the land mobile service for use in sharing and compatibility studies for WRC-19 agenda item 1.5
�
� |
WP 5A
� |
AI1.5
� |
2017-11-22 |
|
[ 535 ]
�
� |
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (and copy to Working Parties 3M and 5B for information) - WRC-19 agenda item 1.14
�
� |
WP 5C
� |
AI1.14
� |
2017-11-22 |
|
[ 534 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, Task Group 5/1, 6A, 7B, 7C and 7D - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
�
� |
WP 5C
� |
� |
2017-11-22 |
|
[ 533 ]
�
� |
Liaison statement to Working Party 4A - Sharing and compatibility studies regarding WRC-19 agenda item 1.16
�
� |
WP 5A
� |
AI1.16
� |
2017-11-21 |
|
[ 532 ]
�
� |
Reply liaison statement to Working Party 4A (copied to Working Parties 4C and 7B) - Simplified regulatory regime for non-GSO satellites with short duration missions
�
� |
WP 5A
� |
� |
2017-11-21 |
|
[ 531 ]
�
� |
Reply liaison statement to Working Party 4A - Use of the frequency bands 17.7-19.7 GHz (space-to-Earth) and 27.5 29.5 GHz (Earth-to-space) by earth stations in motion communicating with geostationary space stations in the fixed-satellite service
�
� |
WP 5C
� |
AI1.5
� |
2017-11-21 |
|
[ 530 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5C, 5D, 6A, 7C, 7B, 7D and 3M - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15)
�
� |
WP 5B
� |
AI1.10
� |
2017-11-20 |
|
[ 529 ]
�
� |
Liaison statement to Working Parties 4A, 5A, 5C and 7C - Aeronautical mobile service (AMS) technical characteristics in 21.2-22 GHz
�
� |
WP 5B
� |
� |
2017-11-20 |
|
[ 528 ]
�
� |
Liaison statement to Working Parties 4A, 4C and 7B - Draft documents including draft CPM text related to WRC-19 agenda item 9.1 issue 9.1.4 - ITU-R Resolution 763 (WRC-15)
�
� |
WP 5B
� |
AI9.1
� |
2017-11-20 |
|
[ 527 ]
�
� |
Reply liaison statement to Working Party 4A - Potential issues with the antenna parameters in Recommendation ITU-R RS.1861 in relation to studies under WRC-19 agenda item 9.1.9
�
� |
WP 7C
� |
AI 9.1.9
� |
2017-11-02 |
|
[ 526 ]
�
� |
Reply to the BR Director with copy to Working Parties 4A, 4B and 4C - Cost recovery for non-GSO satellite networks
�
� |
WPs 7B and 7C
� |
� |
2017-11-01 |
|
[ 525 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems�
�
� |
WP 7A
� |
� |
2017-11-01 |
|
[ 524 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7
�
� |
WP 7B
� |
AI1.7
� |
2017-11-01 |
|
[ 523 ]
�
� |
Liaison statement to Working Party 6A (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7
�
� |
WP 7B
� |
� |
2017-11-03 |
|
[ 522 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 5D) - WRC-19 agenda items 1.6 and 9.1 (issue 9.1.9)
�
� |
WP 7C
� |
AI9.1, AI1.6
� |
2017-10-31 |
|
[ 521 ]
�
� |
Liaison statement to Working Parties 1A, 4A, 5A, 5C and Task Group 5/1 - Apportionment of EESS (passive) protection criteria in Recommendation ITU-R RS.2017
�
� |
WP 7C
� |
� |
2017-10-31 |
|
[ 520 ]
�
� |
Reply liaison statement to Working Party 4A: WRC-19 agenda item 1.6
�
� |
WP 7D
� |
AI1.6
� |
2017-10-30 |
|
[ 519 ]
�
+Ann.1-53� |
Report on the meeting of Working Party 4A (Geneva, 17-27 October 2017)
�
� |
Chairman, WP 4A
� |
� |
2017-10-27 |
|
[ 518 ]
�
� |
Final list of participants - Working Party 4A (Geneva, 17-27 October 2017)
�
� |
Director, BR
� |
� |
2017-10-27 |
|
[ 517 ]
�
� |
Liaison statement to Working Party 7B (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7
�
� |
WP 6A
� |
AI1.7
� |
2017-10-24 |
|
[ 516 ]
�
� |
Liaison statement to Working Parties 4A and 4C - Performance objectives for satellite connections using adaptive coding and modulation
�
� |
WP 4B
� |
� |
2017-10-18 |
Resultados :915 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):