International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Meeting�2013-07-01�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�(2013-07-01)�

ITU-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting� from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-192016-02-152015-06-222014-11-242014-03-242013-12-062013-02-01

Results:440 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 90 ]
Application scenarios for low-cost DWDM metro systems � Italy Q6/15 2013-06-14
[ 89 ]
Requirements for low-cost DWDM metro systems � Italy Q6/15 2013-06-14
[ 88 ]
Proposal about compatibility issues for the revision of G.65x Recommendations on optical fibres � Italy Q5/15 2013-06-14
[ 87 ]
Operational examples of 2-stage ODU SMP APS protocol � Tellabs Oy Q9/15 2013-06-13
[ 86 ]
Resource availability notifications in ODU shared mesh protection � Tellabs Oy Q9/15 2013-06-13
[ 85 ]
Proposed changes to Recommendation G.977 for 40G and 100G systems � Ciena Canada Q8/15 2013-06-13
[ 84 ]
Proposal for Update to G.977 considering 40G and 100G Coherent Systems � Ciena Canada Q8/15 2013-06-13
[ 83 ]
How to handle unused PTP fields in BMCA/G.781 [G.8275.1] � Microsemi Semiconductor Corporation Q13/15 2013-06-13
[ 82 ]
Noise Generation & Noise Transfer Text [G.8273.2] � Microsemi Semiconductor Corporation Q13/15 2013-06-13
[ 81 ]
Adding Applicable Interfaces to PRTC [G.8272] � Microsemi Semiconductor Corporation Q13/15 2013-06-13
[ 80 ]
Wander Generation Variable Temperature [G.8263] � Microsemi Semiconductor Corporation Q13/15 2013-06-13
[ 79 ]
Clarification of Holdover Requirements for PEC-S [G.8263] � Microsemi Semiconductor Corporation Q13/15 2013-06-13
[ 78 ]
Using G.781 for Time Profile [G.827x] � Microsemi Semiconductor Corporation Q13/15 2013-06-13
[ 77 ]
Compliant & Non-Compliant Networks (Re-routes, Outage, Congestion) with FPP [G.8260, G.8261.1] � Microsemi Semiconductor Corporation Q13/15 2013-06-13
[ 76 ]
Proposal to change the approval process for G.8113.1 and G.8113.2 from TAP to AAP � Canada Q10/15 2013-06-13
[ 75 ]
Spectral excursion analysis for advanced modulation formats � Ciena Canada Q6/15 2013-06-13
[ 74 ]
Effective frequency slot characterisation � Ciena Canada Q6/15, Q12/15 2013-06-13
[ 73 ]
G.It: Discussion on accuracy of multi-component measurements � Microsemi Semiconductor Corporation Q4/15 2013-06-13
[ 72 ]
G.It: Request for revision of G.996.2 3-element capacitance measurement accuracies � Microsemi Semiconductor Corporation Q4/15 2013-06-13
[ 71 ]
G.8273.2 latest draft - editorial comments � Integrated Device Technology (IDT) Q13/15 2013-06-13
[ 70 ]
G.8273 latest draft - editorial comments � Integrated Device Technology (IDT) Q13/15 2013-06-13
[ 69 ]
G.8263 Holdover � Integrated Device Technology (IDT) Q13/15 2013-06-13
[ 68 ]
(Rev.1-2)
Proposal of SDN-based transport network standardization � FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 67 ]
(Rev.1-3)
Proposal of research on NBI functionality of controller in SDN-based transport network � FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 66 ]
(Rev.1-2)
The research of the functions features of the transport network controller � China Unicom , FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 65 ]
(Rev.1-2)
Proposal of research on transport network resource virtualization or abstraction � FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 64 ]
(Rev.1-2)
Proposal of research resource partitioning of SDN-based transport network � FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 63 ]
(Rev.1-2)
Proposal of research on coexistence and interworking between current transport network and SDN-based network � FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 62 ]
(Rev.1-2)
Proposal of research Secure Channel in SDN-based transport network � FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 61 ]
(Rev.1-2)
Proposal of research architecture for network management, controller and transport plane � China Unicom , FiberHome Technologies Group Q14/15, Q12/15 2013-06-13
[ 60 ]
(Rev.1-3)
Comments on CCCV mode in G.8121.2 � FiberHome Technologies Group Q10/15 2013-06-13
[ 59 ]
G.8263 Wander Generation � Integrated Device Technology (IDT) Q13/15 2013-06-13
[ 58 ]
(Rev.1-3)
Comments on Ring Protection Function in G.8052 � FiberHome Technologies Group Q14/15 2013-06-13
[ 57 ]
Security in Optical Transport Networks � Altera Newfoundland Technology Centre (Altera NTC) Q11/15 2013-06-13
[ 56 ]
Getting a 'point to point modem proof' PON ranging process � Orange Q2/15 2013-06-13
[ 55 ]
PON-Id fuelled power saving capabilities � Orange Q2/15 2013-06-13
[ 54 ]
Detection of point to point modems on a PON � Orange Q2/15 2013-06-13
[ 53 ]
Necessity to Support External Commands in ODU SMP Protocol � China Mobile Communications Corporation , Huawei Technologies Co. Ltd. Q9/15 2013-06-13
[ 52 ]
MPLS-TP shared ring protection(MSRP) implementation and test result � China Mobile Communications Corporation Q9/15 2013-06-13
[ 51 ]
PWE3 Dual-Homing Protection Requirements � China Mobile Communications Corporation Q9/15 2013-06-13
[ 50 ]
Proposal for PTP clockclasses � China Mobile Communications Corporation Q13/15 2013-06-13
[ 49 ]
Proposal for HRM hops and BC constant time error � China Mobile Communications Corporation Q13/15 2013-06-13
[ 48 ]
(Rev.1)
Proposal to reserve Priority 1 in BMCA � China Mobile Communications Corporation Q13/15 2013-06-13
[ 47 ]
(Rev.1)
ODU SMP with centralized control plane � China Mobile Communications Corporation Q9/15 2013-06-13
[ 46 ]
(Rev.1)
Proposal for different correlation structures for SDN-based transport network controller and path computation element (PCE) � China Unicom Q12/15 2013-06-13
[ 45 ]
Optical transceiver performance for the new CWDM applications with multi sub-channel interface � Ericsson-LG , SK Telecom Q6/15 2013-06-13
[ 44 ]
(Rev.1)
Proposal for revision of recommendation ITU-T L.60 � FiberHome Technologies Group Q16/15 2013-06-13
[ 43 ]
Consideration for Interworking between Ethernet Linear Protection in G.MDSP � China Unicom Q9/15 2013-06-13
[ 42 ]
(Rev.1)
Proposal to add related description of PMDQ in ITU-T Recommendation G.650.2(2007) � FiberHome Technologies Group , Ministry of Information and Industry of China Q5/15 2013-06-13
[ 41 ]
Definition of serial data interface comunication ME in G.988 � FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation Q2/15 2013-06-13
Results:440 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-2-4