Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 960 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY] - Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect to systems in the mobile-satellite service in the frequency band 1 518-1 525 MHz
�
� |
Inmarsat Plc.
� |
� |
2018-06-05 |
|
[ 959 ]
�
� |
Proposed revisions to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] - Coexistence and compatibility study between the terrestrial component and the satellite component of IMT in the frequency bands 1 980-2 010 MHz and 2 170-2 200 MHz in different countries (Question ITU-R 201-1/4)
�
� |
Inmarsat Plc.
� |
� |
2018-06-05 |
|
[ 958 ]
�
� |
Proposal to progress on the work towards a preliminary draft new Report ITU-R M.[IMT.[APPROACHES]EXPERIENCES]
�
� |
Mexico
� |
� |
2018-06-05 |
|
[ 957 ]
�
� |
Update on activities in Region 3
�
� |
Region 3 Rapporteur
� |
� |
2018-06-06 |
|
[ 956 ]
�
� |
Proposed updates on the working document towards a preliminary draft new Report ITU-R M.[RADAR&IMT-ADVANCED SHARING] - In band and adjacent band coexistence and compatibility studies between IMT-Advanced systems in 3 300-3 400 MHz and radiolocation systems in 3 100-3 400 MHz
�
� |
Thales SA
� |
� |
2018-06-05 |
|
[ 955 ]
�
� |
Reply liaison statement to Working Party 4A (copy for information to Working Parties 3M, 4C, 5A, 5D, 7B, 7C and 7D) - Clarification of HAPS characteristics and studies
�
� |
WP 5C
� |
AI1.14
� |
2018-06-05 |
|
[ 954 ]
�
� |
Reply liaison statement to Working Party 5D (copy for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - Information on Adaptive Transmit Power Control (ATPC)
�
� |
WP 5C
� |
AI1.14
� |
2018-06-05 |
|
[ 953 ]
�
� |
Proposal on revising working document towards a preliminary draft new Report ITU-R M.[IMT.[APPROACHES]EXPERIENCES]
�
� |
India (Republic of)
� |
� |
2018-06-05 |
|
[ 952 ]
�
� |
Working document towards draft CPM text on WRC-19 agenda item 9.1, issue 9.1.8 (Machine-type communication)
�
� |
India (Republic of)
� |
� |
2018-06-05 |
|
[ 951 ]
�
� |
Working document towards a preliminary draft new Report ITU-R M.[IMT.MTC] - The use of the terrestrial component of International Mobile Telecommunication (IMT) for Narrowband and Broadband Machine-Type Communication
�
� |
India (Republic of)
� |
� |
2018-06-05 |
|
[ 950 ]
�
� |
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (copy for information to Working Parties 3M and 5B) - Progress on WRC-19 agenda item 1.14
�
� |
WP 5C
� |
AI1.14
� |
2018-06-05 |
|
[ 949 ]
�
� |
Transposition references for draft revision 14 of Recommendation ITU-R M.1457
�
� |
Alliance for Telecommunications Industry Solutions
� |
� |
2018-06-04 |
|
[ 948 ]
�
� |
Document "IMT-2020/YYY": Acknowledgement of a candidate submission of an RIT or an SRIT
�
� |
Canada
� |
� |
2018-06-05 |
|
[ 947 ]
�
� |
Progression of the working document towards a preliminary draft revision of Report ITU-R M.2373-0 - Audio-visual capabilities and applications supported by terrestrial IMT systems
�
� |
Canada
� |
Q229/5
� |
2018-06-05 |
|
[ 946 ]
�
� |
Progression of the working document towards a preliminary draft new Report ITU-R M.[IMT.EXPERIENCES] - National experience of some countries in which certain frequency band(s) are allocated to mobile services and identified for IMT systems related to technical, operational and regulatory/procedural aspects
�
� |
Canada
� |
Q229/5
� |
2018-06-05 |
|
[ 945 ]
�
� |
Progression of the working document towards a preliminary draft revision of Recommendation ITU-R M.1036-5 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications (IMT) in the bands identified for IMT in the Radio Regulations (RR)
�
� |
Canada
� |
Q229/5
� |
2018-06-05 |
|
[ 944 ]
�
� |
Proposal for working document towards a preliminary draft revision of Recommendation ITU-R M.1036-5
�
� |
Mexico
� |
� |
2018-06-05 |
|
[ 943 ]
�
� |
Proposal for working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.8 (MTC)
�
� |
Mexico
� |
� |
2018-06-05 |
|
[ 942 ]
�
� |
Update on activities in Region 2
�
� |
Region 2 Rapporteur
� |
� |
2018-06-04 |
|
[ 941 ]
�
� |
Proposed way forward for PDNR ITU-R M.[IMT.EXPERIENCE]
�
� |
France
,
Germany (Federal Republic of)
,
Russian Federation
,
United Kingdom of Great Britain and Northern Ireland
� |
� |
2018-06-04 |
|
[ 940 ]
�
� |
Proposed modifications to working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING]
�
� |
Russian Federation
� |
AI9.1
� |
2018-06-04 |
|
[ 939 ]
�
� |
Proposed updates to the draft CPM text for WRC-19 agenda item 9.1, issue 9.1.1
�
� |
Russian Federation
� |
AI9.1
� |
2018-06-04 |
|
[ 938 ]
�
� |
Proposals on further consideration of working document towards a preliminary draft Report ITU-R M.[IMT.[APPROACHES]EXPERIENCES]
�
� |
Russian Federation
� |
� |
2018-06-04 |
|
[ 937 ]
�
� |
Proposal on editorial modifications to the working document towards a preliminary draft new Report ITU-R M.[IMT.MTC]
�
� |
Germany (Federal Republic of)
,
United Kingdom of Great Britain and Northern Ireland
� |
� |
2018-06-04 |
|
[ 936 ]
�
� |
Adjustments to advanced antenna system (AAS) antenna pattern for adjacent frequency band
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2018-06-04 |
|
[ 935 ]
�
(Rev.1)� |
Liaison statement on work which is under study in ITU-T Q3/5
�
� |
ITU-T SG 5
� |
� |
2018-06-04 |
|
[ 934 ]
�
� |
Liaison statement on considerations of EMC/EMI in relation to IMT
�
� |
ITU-T SG 5
� |
� |
2018-06-04 |
|
[ 933 ]
�
� |
Proposal to develop the summary of the status of the studies and its workplan
�
� |
Korea (Republic of)
� |
� |
2018-06-04 |
|
[ 932 ]
�
� |
Proposal for updates on ITU-R Question, Opinion and Resolutions in terms of IMT
�
� |
Korea (Republic of)
� |
� |
2018-06-04 |
|
[ 931 ]
�
� |
Sharing and compatibility studies between IMT-Advanced systems in 3 300-3 400 MHz and radiolocation systems in 3 100-3 400 MHz
�
� |
Korea (Republic of)
� |
� |
2018-06-04 |
|
[ 930 ]
�
� |
Proposed modifications to working document toward - Draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2
�
� |
Korea (Republic of)
� |
AI9.1.2
� |
2018-06-04 |
|
[ 929 ]
�
� |
Proposed modifications to working document toward - Draft CPM text for WRC-19 agenda item 9.1, issue 9.1.1
�
� |
Korea (Republic of)
� |
AI9.1.1
� |
2018-06-04 |
|
[ 928 ]
�
� |
Trials, tests and projects relating to 5G Broadcast
�
� |
European Broadcasting Union
� |
� |
2018-06-04 |
|
[ 927 ]
�
� |
Proposed revisions to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING] and proposed liaison response from Working Party 5D to Working Party 4C
�
� |
Papua New Guinea
� |
� |
2018-06-04 |
|
[ 926 ]
�
� |
Action to be taken for the preliminary draft new Report ITU-R M.[IMT.EXPERIENCE]
�
� |
Iran (Islamic Republic of)
� |
� |
2018-06-03 |
|
[ 925 ]
�
� |
UTC application in IMT systems
�
� |
United States of America
� |
� |
2018-06-01 |
|
[ 924 ]
�
� |
Working document towards a PDN Report ITU-R M.[IMT.MTC] on the use of the terrestrial component of international mobile telecommunication (IMT) for narrowband and broadband machine-type communication (MTC)
�
� |
United States of America
� |
� |
2018-06-01 |
|
[ 923 ]
�
� |
Working document towards draft CPM text for WRC-19 issue 9.1.8 (MTC)
�
� |
United States of America
� |
� |
2018-06-01 |
|
[ 922 ]
�
� |
Working document towards a preliminary draft new Report ITU-R M.[IMT.[APPROACHES]EXPERIENCES] - National [approaches, best practices and/or] experience of some countries in which certain frequency band(s) are allocated to mobile services and identified for IMT systems related to technical, operational and regulatory/procedural aspects
�
� |
United States of America
� |
� |
2018-06-01 |
|
[ 921 ]
�
� |
Evaluation activity update (TTA SPG 33)
�
� |
Director, BR
� |
� |
2018-06-01 |
|
[ 920 ]
�
� |
Reply liaison statement to Working Party 5D (copy for information to Working Party 1B) - Work on WRC-19 agenda item 9.1, issue 9.1.8
�
� |
WP 5A
� |
AI9.1
� |
2018-06-01 |
|
[ 919 ]
�
� |
Reply liaison statement to Working Parties 1A and 4C (copy for information to Working Parties 4A, 5D, 7B, and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations
�
� |
WPs 5A, 5B, 5C
� |
� |
2018-05-31 |
|
[ 918 ]
�
� |
Reply liaison statement to Working Party 7A (copy for information to Working Parties 5A and 5D) - Coordinated universal time application in the systems of the maritime mobile service, including global maritime distress and safety service, aeronautical mobile service and radiodetermination service
�
� |
WP 5B
� |
� |
2018-05-30 |
|
[ 917 ]
�
� |
Reply liaison statement to Working Party 5D - Work progress on the coexistence conditions between IMT and systems operating in the aeronautical mobile service in the frequency band 4 800-4 990 MHz
�
� |
WP 5B
� |
� |
2018-05-28 |
|
[ 916 ]
�
� |
Reply liaison statement to ITU-R Working Party 5C (copy for information to Working Parties 3M, 4A, 4C, 5B, 5D, 7B, 7C, 7D and Task Group 5/1) - WRC-19 agenda item 1.14
�
� |
WP 5A
� |
AI1.14
� |
2018-05-25 |
|
[ 915 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 1/1 to ITU-R Study Group 5 Working Party 5D on collaboration
�
� |
ITU-D SG 1
� |
� |
2018-05-24 |
|
[ 914 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 1/1 to ITU-R Study Groups 1, 4 and 5 on collaboration
�
� |
ITU-D SG 1
� |
� |
2018-05-24 |
|
[ 913 ]
�
� |
Reply liaison on IMT-2020 in support of PPDR
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
,
Huawei Technologies Co. Ltd.
,
Qualcomm, Inc.
,
Telecom Italia S.p.A.
,
Telefon AB - LM Ericsson
� |
� |
2018-05-21 |
|
[ 912 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - Status of WRC-19 agenda item 1.7
�
� |
WP 7B
� |
AI1.7
� |
2018-05-21 |
|
[ 911 ]
�
(Rev.1)� |
Reply liaison statement to Working Party 4A (copy to Working Parties 5B, 5C, 5D, 6A, 7B, 7C for information) - Working document towards a preliminary draft new Report ITU-R S.[50/40 GHz adjacent band studies] - Protection of EESS (passive) and RAS systems for non-GSO fixed satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands
�
� |
WP 7D
� |
AI1.6
� |
2018-05-21 |
Results:1310 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):