Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 315 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70-86 GHz
�
� |
ATDI
� |
Q110/5
� |
2017-09-29 |
|
[ 314 ]
�
� |
Reply liaison statement to Working Party 1A on propagation characteristics in the frequency range 275 450 GHz (copy to Working Parties 5A, 5C, 7C and 7D for information)
�
� |
WPs 3J, 3K and 3M
� |
� |
2017-09-06 |
|
[ 313 ]
�
� |
Reply liaison statement to Working Party 5A (copy to Working Parties 5B and 5C) - Propagation models for compatibility studies regarding WRC-19 agenda item 1.16
�
� |
WPs 3K and 3M
� |
AI1.16
� |
2017-09-05 |
|
[ 312 ]
�
� |
Liaison statement to ITU-T Study Group 5, ITU-R Study Groups 1, 4, 5, 6 and their relevant Working Parties on ongoing collaboration
�
� |
ITU-D SG 2
� |
� |
2017-08-28 |
|
[ 311 ]
�
� |
MEF Forum Work on 5G
�
� |
Director, BR
� |
� |
2017-08-02 |
|
[ 310 ]
�
� |
Agenda items with overlapping frequency bands
�
� |
Chairmen, WPs 4A, 5C and TG 5/1
� |
� |
2017-07-20 |
|
[ 309 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations
�
� |
WP 1A
� |
� |
2017-07-10 |
|
[ 308 ]
�
� |
Liaison statement to ITU-R Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15
�
� |
WP 1A
� |
� |
2017-07-10 |
|
[ 307 ]
�
� |
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7A, 7B, 7C & 7D on Resolution 63 (Rev. WRC-12)
�
� |
WP 1A
� |
� |
2017-07-10 |
|
[ 306 ]
�
� |
Reply liaison statement to Working Party 1A (copy for information to Working Parties 3L, 5A, 5B, 5C, 6A, 7A and 7D) - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services
�
� |
WP 1C
� |
� |
2017-07-07 |
|
[ 305 ]
�
� |
Liaison statement to ITU-D Study Group 2, ITU-T Study Group 5 and ITU-R Working Parties 4A, 5A, 5B, 5C, 5D on a preliminary draft new Report ITU-R SM.[EMF-MON] - Electromagnetic field measurements to assess human exposure
�
� |
WP 1C
� |
� |
2017-07-07 |
|
[ 304 ]
�
� |
New version of the Access Network Transport (ANT) Standards Overview and Work Plan
�
� |
ITU-T SG 15
� |
� |
2017-07-07 |
|
[ 303 ]
�
� |
New version of the Home Network Transport (HNT) Standards Overview and Work Plan
�
� |
ITU-T SG 15
� |
� |
2017-07-05 |
|
[ 302 ]
�
� |
Liaison statement on ITU inter-Sector coordination
�
� |
ITU-T SG 15
� |
� |
2017-07-05 |
|
[ 301 ]
�
� |
Liaison statement to Working Party 3K on propagation characteristics in the 275-450 GHz band (copy to Working Parties 3J, 3M, 5A, 5C, 7C and 7D for information)
�
� |
WP 1A
� |
AI1.15
� |
2017-07-05 |
|
[ 300 ]
�
� |
Reply liaison statement to Working Party 5C - WRC-19 agenda item 1.14
�
� |
WP 5D
� |
� |
2017-06-27 |
|
[ 299 ]
�
� |
Liaison statement on information about work being carried out under study in ITU-T Question 3/5
�
� |
ITU-T SG 5
� |
� |
2017-06-23 |
|
[ 298 ]
�
� |
Reply liaison statement to Working Party 7B (copied for information to Working Party 5C and Task Group 5/1) - Response to Working Party 7B Questions and Issues regarding PDN Recommendation ITU-R M.[AMS-CHAR 24]
�
� |
WP 5B
� |
� |
2017-06-19 |
|
[ 297 ]
�
� |
Liaison statement to Working Parties 1A and 7C (copy to Working Parties 5C and 7D for information) - WRC-19 agenda item 1.15
�
� |
WP 5A
� |
AI1.15
� |
2017-06-05 |
|
[ 296 ]
�
� |
Reply liaison statement to ITU-R Working Party 5C - Progress on WRC-19 agenda item 1.1
�
� |
WP 5A
� |
� |
2017-06-05 |
|
[ 295 ]
�
� |
Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copy to Working Parties 4A, 4C, 5C and 5D) - Regulatory tools to support enhanced shared use of the spectrum
�
� |
WP 5A
� |
� |
2017-06-05 |
|
[ 294 ]
�
� |
Liaison statement to Working Party 4C (copy for information to Working Party 5C) - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
�
� |
WP 5A
� |
� |
2017-06-05 |
|
[ 293 ]
�
� |
Reply liaison statement to Working Party 1A and 1B (copied for information to Working Parties 5A and 5C) - Wireless power transmission
�
� |
WP 5B
� |
� |
2017-06-05 |
|
[ 292 ]
�
+Ann.1-29� |
Report on the meeting of Working Party 5C (Geneva, 22-31 May 2017)
�
� |
Chairman, WP 5C
� |
� |
2017-05-31 |
|
[ 291 ]
�
� |
Final List of Participants - Working Party 5C (Geneva, 22-31 May 2017)
�
� |
Director, BR
� |
� |
2017-05-31 |
|
[ 290 ]
�
� |
List of documents issued (Documents 5C/173 - 5C/290)
�
� |
BR Study Groups Department
� |
� |
2017-05-19 |
|
[ 289 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Party 4B for information) - FSS/BSS technical parameters for sharing studies under WRC-19 agenda item 1.14 (HAPS)
�
� |
WP 4A
� |
AI1.14
� |
2017-05-19 |
|
[ 288 ]
�
� |
Liaison statement to working Parties 5A, 5C, 5D, 7C and 7D (copy to Working Parties 4B and 3M) - WRC-19 agenda item 9.1, issue 9.1.9
�
� |
WP 4A
� |
AI9.1
� |
2017-05-19 |
|
[ 287 ]
�
� |
Reply liaison statement to Working Parties 5A, 5C and 5D - Status of the working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]
�
� |
WP 4A
� |
� |
2017-05-19 |
|
[ 286 ]
�
� |
Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copy for information to Working Parties 4C, 5A, 5C and 5D) - Regulatory tools to support enhanced shared use of the spectrum
�
� |
WP 4A
� |
� |
2017-05-19 |
|
[ 285 ]
�
� |
Liaison statement to Working Party 5C - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
�
� |
WP 4A
� |
� |
2017-05-19 |
|
[ 284 ]
�
� |
Information Note to Working Parties 5A, 5B, 5C and 5D - Protection criteria of the fixed and mobile services for the VHF/UHF multilateral coordination in the Central American and Caribbean areas
�
� |
Director, BR
� |
� |
2017-05-16 |
|
[ 283 ]
�
� |
Proposed revisions to the working document toward draft CPM text on WRC-19 agenda item 1.14
�
� |
Germany (Federal Republic of)
� |
AI1.14
� |
2017-05-16 |
|
[ 282 ]
�
� |
Working document towards preliminary draft new Recommendation ITU-R F.[HAPS_BROAD_CONNECT] - HAPS parameters and protection criteria for broadband connectivity in the bands 38-39.5 GHz and 27.9-28.2/31-31.3 and 21.4-22 GHz, 24.25-27.5 GHz (Region 2)
�
� |
Germany (Federal Republic of)
� |
AI1.14
� |
2017-05-15 |
|
[ 281 ]
�
� |
Working document towards a preliminary draft new Report ITU-R F.[HAPS-SPECTRUM-REQ] - Spectrum requirements for broadband applications of HAPS in the fixed service
�
� |
Germany (Federal Republic of)
� |
AI1.14
� |
2017-05-15 |
|
[ 280 ]
�
� |
Working document towards a preliminary draft new Report ITU-R F.[BROADBAND-HAPS-CONNECT-SHARING] - Interference analysis for sharing between broadband HAPS connectivity gateway and user links in the fixed service and other systems/services in the ranges 38 -39.5 GHz and 27.9-28.2/31-31.3 GH and 21.4-22 GHz, 24.25-27.5 GHz (Region2) and adjacent /nearby bands
�
� |
Germany (Federal Republic of)
� |
AI1.14
� |
2017-05-15 |
|
[ 279 ]
�
� |
Preliminary draft revision of Recommendation ITU-R F.699
�
� |
France
� |
� |
2017-05-15 |
|
[ 278 ]
�
� |
Proposed text for reply liaison statement to Working Party 5B (Doc. 5C/179) - New compatibility studies between earth stations on board unmanned aircraft and the fixed service in the 10.95-12.75 GHz (space-to-Earth) and in the 14-14.47 GHz (Earth-to-space) frequency bands
�
� |
France
� |
� |
2017-05-15 |
|
[ 277 ]
�
� |
Revision of Recommendation ITU-R F.758-6 - System parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference
�
� |
France
� |
� |
2017-05-15 |
|
[ 276 ]
�
� |
Proposals with regard to Revision of ITU-R Recommendation F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
�
� |
France
� |
� |
2017-05-15 |
|
[ 275 ]
�
� |
Working document towards a preliminary draft new Report ITU-R.[HAPS-SPECTRUM-REQ]
�
� |
France
� |
� |
2017-05-15 |
|
[ 274 ]
�
� |
Summary of the studies to be performed for agenda item 1.14 of WRC-19
�
� |
France
� |
� |
2017-05-15 |
|
[ 273 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R F.[SPECIFIC BROADBAND HAPS] - Technical and operational characteristics of specific broadband high altitude platform stations in the bands 6 440-6 520 MHz, 27.9-28.2 GHz and 31-31.3 GHz to be used in sharing studies
�
� |
France
� |
� |
2017-05-15 |
|
[ 272 ]
�
� |
Working document towards a preliminary draft new Report ITU-R F. [SPECIFIC-BROADBAND- HAPS-SHARING] - Interference analysis for sharing between specific broadband HAPS gateway and user links in the fixed service and other systems/services in the ranges 6 440-6 520 MHz, 27.9-28.2 GHz and 31-31.3 GHz
�
� |
France
� |
� |
2017-05-15 |
|
[ 271 ]
�
� |
Working document towards a preliminary draft new Report ITU-R F.[BROADBAND-HAPS-CONNECT-SHARING] - Interference analysis for sharing between broadband HAPS connectivity gateway and user links in the fixed service and other systems/services in the ranges 38-39.5 GHz and 27.9-28.2/31-31.3 GHz and 21.4-22 GHz, 24.25-27.5 GHz (Region 2), 47.2-47.5 GHz 47.9-48.2 GHz and adjacent band
�
� |
France
� |
� |
2017-05-15 |
|
[ 270 ]
�
� |
Working document toward draft CPM text on WRC-19 agenda item 1.14 - (WP 5C/WP 4A, WP 4C, WP 5A, WP 5D, WP 7B, WP 7C, (WP 3M), (WP 7D))
�
� |
France
� |
� |
2017-05-15 |
|
[ 269 ]
�
� |
Support for studies addressing HAPS spectrum requirements
�
� |
Senegal (Republic of)
� |
� |
2017-05-15 |
|
[ 268 ]
�
� |
[Working document towards a] Preliminary draft new Recommendation ITU-R F.[PERFORM]
�
� |
China (People's Republic of)
� |
� |
2017-05-15 |
|
[ 267 ]
�
� |
Proposals on working document towards a preliminary draft new Report ITU-R F.[BROADBAND_HAPS]
�
� |
China (People's Republic of)
� |
� |
2017-05-15 |
|
[ 266 ]
�
� |
Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
�
� |
N/A
� |
Q110/5
� |
2017-05-15 |
Results:665 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):