International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:915 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 565 ]
Proposed changes to working document towards draft CPM text for WRC-19 agenda item 1.5 � Australia AI1.5 2018-02-12
[ 564 ]
WRC-19 agenda item 9.1, issue 9.1.9 - Compatibility of fixed-satellite service with IMT-2020 applications of the mobile service in 51.4-52.4 GHz � Australia AI9.1 2018-02-12
[ 563 ]
Working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9 � European Space Agency , European Organisation for the Exploitation of Meteorological Satellites AI9.1 2018-02-09
[ 562 ]
Working document towards a preliminary draft new Report ITU-R S.[50/40 GHz ADJACENT BAND STUDIES] � European Space Agency , European Organisation for the Exploitation of Meteorological Satellites AI1.6 2018-02-09
[ 561 ]
Preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9 � European Space Agency , European Organisation for the Exploitation of Meteorological Satellites AI9.1 2018-02-09
[ 560 ]
Input on preliminary draft CPM text for WRC-19 agenda item 7 - Issue K � Papua New Guinea AI7 2018-02-12
[ 559 ]
Liaison statement - New ITU-T Study Group 13 terms and definitions � ITU-R CCV, ITU-T SCV 2018-02-09
[ 558 ]
Proposed updates to preliminary draft CPM text for WRC-19 agenda item 7 - Issue J � Korea (Republic of) AI7 2018-02-08
[ 557 ]
Proposed modifications to working document toward draft CPM text for WRC-19 agenda item 1.5 � Korea (Republic of) AI1.5 2018-02-08
[ 556 ]
Proposed updates to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] � Korea (Republic of) AI1.5 2018-02-08
[ 555 ]
Update on the sharing study with MS stations and aeronautical ESIM � Korea (Republic of) AI1.5 2018-02-08
[ 554 ]
Modifications to the draft CPM text of agenda item 7, Issue B � Spain , HISPASAT, S.A. AI7 2018-02-07
[ 553 ]
Maritime-ESIM coexistence with FS stations � Germany (Federal Republic of) 2018-02-06
[ 552 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz � Japan AI1.5 2018-02-06
[ 551 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz � Japan AI1.5 2018-02-06
[ 550 ]
Proposed modifications to working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2 � Japan AI9.1 2018-02-06
[ 549 ]
Proposed modifcations to working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] � Japan AI9.1 2018-02-06
[ 548 ]
Proposal for amendments of CPM text - WRC-19 agenda item 7, Issue J - Modification of Section 1, Annex 1 of RR AP30, pfd limit � Japan AI7 2018-02-06
[ 547 ]
Proposal for amendments of CPM text - WRC-19 agenda item 7, Issue G - Updating the reference situation for Region 1 and 3 networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments � Japan AI7 2018-02-06
[ 546 ]
Proposal for the further discussion on working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the brining into use of frequency assignments to non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO FSS satellite systems in certain bands � Japan AI7 2018-02-06
[ 545 ]
Proposed updates to the working document towards draft CPM text for agenda item 9.1, issue 9.1.2 � France AI9.1 2018-02-05
[ 544 ]
Draft Note to Director, Radiocommunication Bureau - Cost recovery for non-Geostationary satellite systems � United States of America 2018-01-26
[ 543 ]
Draft Note to the BR Director - Cost recovery for non-GSO satellite networks � Luxembourg 2018-01-15
[ 542 ]
Cost recovery for non-GSO satellite systems � Director, BR 2018-01-08
[ 541 ]
Liaison statement to Working Parties 1C, 4A and 7C - Standards for broadcasting-satellite receiving equipment � WP 1A 2017-12-12
[ 540 ]
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations � WP 1A 2017-12-12
[ 539 ]
Liaison statement to CISPR and ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 4A, 4B and 7C) - Interference from broadcasting-satellite receiving equipment � WP 1A 2017-12-12
[ 538 ]
Liaison statement to Working Party 4A (copy to Working Party 1C for information) - WRC-19 agenda item 9.1, issue 9.1.7 � WP 1B AI9.1 2017-12-08
[ 537 ]
Liaison statement on information about work that is being carried out which is under study in ITU-T Q3/5; ITU-R and ITU-D � ITU-T SG 5 2017-11-23
[ 536 ]
Liaison statement to Working Party 4A - Updated receiver characteristics of systems in the land mobile service for use in sharing and compatibility studies for WRC-19 agenda item 1.5 � WP 5A AI1.5 2017-11-22
[ 535 ]
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (and copy to Working Parties 3M and 5B for information) - WRC-19 agenda item 1.14 � WP 5C AI1.14 2017-11-22
[ 534 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, Task Group 5/1, 6A, 7B, 7C and 7D - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz � WP 5C 2017-11-22
[ 533 ]
Liaison statement to Working Party 4A - Sharing and compatibility studies regarding WRC-19 agenda item 1.16 � WP 5A AI1.16 2017-11-21
[ 532 ]
Reply liaison statement to Working Party 4A (copied to Working Parties 4C and 7B) - Simplified regulatory regime for non-GSO satellites with short duration missions � WP 5A 2017-11-21
[ 531 ]
Reply liaison statement to Working Party 4A - Use of the frequency bands 17.7-19.7 GHz (space-to-Earth) and 27.5 29.5 GHz (Earth-to-space) by earth stations in motion communicating with geostationary space stations in the fixed-satellite service � WP 5C AI1.5 2017-11-21
[ 530 ]
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5C, 5D, 6A, 7C, 7B, 7D and 3M - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15) � WP 5B AI1.10 2017-11-20
[ 529 ]
Liaison statement to Working Parties 4A, 5A, 5C and 7C - Aeronautical mobile service (AMS) technical characteristics in 21.2-22 GHz � WP 5B 2017-11-20
[ 528 ]
Liaison statement to Working Parties 4A, 4C and 7B - Draft documents including draft CPM text related to WRC-19 agenda item 9.1 issue 9.1.4 - ITU-R Resolution 763 (WRC-15) � WP 5B AI9.1 2017-11-20
[ 527 ]
Reply liaison statement to Working Party 4A - Potential issues with the antenna parameters in Recommendation ITU-R RS.1861 in relation to studies under WRC-19 agenda item 9.1.9 � WP 7C AI 9.1.9 2017-11-02
[ 526 ]
Reply to the BR Director with copy to Working Parties 4A, 4B and 4C - Cost recovery for non-GSO satellite networks � WPs 7B and 7C 2017-11-01
[ 525 ]
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems� � WP 7A 2017-11-01
[ 524 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7 � WP 7B AI1.7 2017-11-01
[ 523 ]
Liaison statement to Working Party 6A (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7 � WP 7B 2017-11-03
[ 522 ]
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 5D) - WRC-19 agenda items 1.6 and 9.1 (issue 9.1.9) � WP 7C AI9.1, AI1.6 2017-10-31
[ 521 ]
Liaison statement to Working Parties 1A, 4A, 5A, 5C and Task Group 5/1 - Apportionment of EESS (passive) protection criteria in Recommendation ITU-R RS.2017 � WP 7C 2017-10-31
[ 520 ]
Reply liaison statement to Working Party 4A: WRC-19 agenda item 1.6 � WP 7D AI1.6 2017-10-30
[ 519 ]
+Ann.1-53
Report on the meeting of Working Party 4A (Geneva, 17-27 October 2017) � Chairman, WP 4A 2017-10-27
[ 518 ]
Final list of participants - Working Party 4A (Geneva, 17-27 October 2017) � Director, BR 2017-10-27
[ 517 ]
Liaison statement to Working Party 7B (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7 � WP 6A AI1.7 2017-10-24
[ 516 ]
Liaison statement to Working Parties 4A and 4C - Performance objectives for satellite connections using adaptive coding and modulation � WP 4B 2017-10-18
Results:915 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2019-10-18