International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1B� C�

ITU-R�WP1B

Spectrum Management Methodologies and Economic Strategies

Results:383 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 33 ]
Liaison statement to Working Party 6A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda 1.1 � WP 5A AI1.1 2016-05-25
[ 32 ]
Reply liaison statement to Working Party 1A (copy for information to Working Parties 1B, 5B 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam � WP 5A 2016-05-25
[ 31 ]
Sustainable socio-economic spectrum management � Canada Q205/1 2016-05-25
[ 30 ]
Progressing the working document towards a preliminary draft new Report ITU-R SM.[INNOVATIVE REGULATORY TOOLS] "Innovative regulatory tools to support enhanced shared use of the spectrum" � Canada 2016-05-25
[ 29 ]
Initial considerations on WRC-19 agenda item 9.1, issue 9.1.7 - Studies on management of unauthorized operation of earth station terminals � China (People's Republic of) AI9.1 2016-05-24
[ 28 ]
Preliminary draft revision of Recommendation ITU-R SM.1046 - An alternative method of spectrum utilization efficiency of a land mobile system � China (People's Republic of) 2016-05-24
[ 27 ]
Proposals on WRC-19 agenda item 9.1 (issue 9.1.6) � China (People's Republic of) AI9.1 2016-05-24
[ 26 ]
Reply liaison statement to Working Party 5C copied to Working Parties 1A and 1B for information - Preliminary draft new Report ITU-R F.[FS/RLS COMPATIBILITY IN 71-86 GHZ] - P-P/P-MP applications in the fixed service operating in the 71-76 GHz and 81-86 GHz bands and automotive radar applications in the radiolocation service operating in the 76-77.5 GHz and 78-81 GHz bands � WP 5B 2016-05-20
[ 25 ]
Reply liaison statement to ITU-T Study Group 5, ITU-R Working Parties 5D and 6A (copy for information to Working Parties 3L, 1B, 1C and ITU-D Study Group 2) - Human exposure to electromagnetic fields (EMFS) � WPs 5A, 5B and 5C 2016-05-20
[ 24 ]
Preliminary draft revision of Recommendation ITU-R SM.1413-3 - Radiocommunication Data Dictionary (RDD) � United Kingdom of Great Britain and Northern Ireland 2016-05-20
[ 23 ]
Proposed modifications to the working document towards preliminary draft new Report/Recommendation ITU-R SM.[SRD-CATEGORIES] - Global harmonization of SRD categories � United States of America 2016-05-18
[ 22 ]
Report of the activities of the Correspondence Group (CG) on SRD on Classification � Chairman, CG on SRD Classification 2016-05-17
[ 21 ]
Working Party 1B Rapporteur Group on cognitive radio system spectrum management challenges - Rapporteur's Report � Rapporteur, RG on CRS SM challenges 2016-05-13
[ 20 ]
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5 � ITU-T SG 5 2016-05-13
[ 19 ]
Attendance Report of CISPR meeting � Liaison Rapporteur with CISPR on WPT 2016-05-12
[ 18 ]
Draft editorial modification of Report ITU-R SM.2153 � ATDI 2016-05-09
[ 17 ]
Liaison statement on the progress of ongoing work on WTDC Resolution 9 (Rev.Dubai, 2014) during the ITU-D study period 2014-2017 � ITU-R/ITU-T JG on WTDC Res.9 2016-04-25
[ 16 ]
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam � WP 7D Q210/1 2016-04-13
[ 15 ]
Working document on the work plan and milestones for the ITU-R studies on item 2 of the Annex to Resolution 958 (WRC-15), (WRC-19 agenda item 9.1, issue 9.1.7) - Studies on managing uplink transmissions of terminals to those authorized terminals � Chairman, WP 1B AI9.1 2016-04-13
[ 14 ]
Working document on the work plan and milestones for the ITU-R studies on item 1 of the Annex to Resolution 958 (WRC-15) (WRC-19 agenda item 9.1, issue 9.1.6) - Studies concerning wireless power transmission (WPT) for electric vehicles � Chairman, WP 1B AI9.1 2016-04-13
[ 13 ]
Liaison statement to Radiocommunication Study Groups and Working Parties � Chairman, CCV 2016-04-01
[ 12 ]
RF Human exposure - Exposure distances around Point to Point Systems � ATDI 2016-03-29
[ 11 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C AND 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] � WP 5D 2016-03-09
[ 10 ]
Liaison statement to WP 1B (copy to ITU-D SG 1 and ITU-R WP 5A for information) - Working document towards a preliminary draft new Report ITU-R SM.[INNOVATIVE REGULATORY TOOLS] � WP 5D 2016-03-09
[ 9 ]
Reply liaison statement to ITU-T Study Group 5, ITU-D Study Group 2, ITU-R Working Party 6A (copy for information to Working Parties 3L, 1B, 1C, 5A, 5B, 5C) on information about work that is being carried out within work under study in ITU-T Q7/5 (Human exposure to electromagnetic fields (EMFS) due to radio systems and mobile equipment) � WP 5D 2016-03-08
[ 8 ]
Reply liaison statement to IRG-AVA (copy for information to ITU-R Working Parties 1B, 5A, 6A, Study Group 5, ITU-T Study Groups 9 and 16) - Barriers to wireless connections for hearing aids and medical devices � WP 5D 2016-03-08
[ 7 ]
Proposed changes to Report ITU-R SM.2012-4 (2014) "Economic aspects of spectrum management " � Russian Federation 2016-03-01
[ 6 ]
Working document towards a preliminary draft new Report ITU-R SM.[INNOVATIVE REGULATORY TOOLS] � Russian Federation 2016-03-01
[ 5 ]
Liaison statement on request to consider the hearing aids issue on Wireless Power Transmission (WPT) work � ITU-T JCA-AHF 2016-02-12
[ 4 ]
Liaison statement to Working Party 5A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda item 1.1 � WP 6A AI1.1 2016-02-03
[ 3 ]
Liaison statement on new ITU-T SG 20 � ITU-T SG 20 2015-12-15
[ 2 ]
Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5 � ITU-T SG 5 2015-12-08
[ 1 ]
Documents to be carried over from the 2012-2015 study period � WP 1B 2015-12-08
Results:383 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-16