International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP1A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP1A� C�

ITU-R�WP1A

Spectrum Engineering Techniques

Results:466 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 116 ]
Proposed revision of the work plan for ITU-R Reports of wireless power transmission via Radio Frequency Beam � Japan Q210/1 2016-11-15
[ 115 ]
Proposal of a new Report ITU-R SM.[WPT.SPEC.MNGM] "Methodology for spectrum management of wireless power transmission" � Japan Q210/1 2016-11-15
[ 114 ]
Studies on the impact of wireless power transmission for electric vehicles on broadcasting service � Japan Q210/1, AI9.1 2016-11-15
[ 113 ]
Summary of studies on the impact of WPT for electric vehicle applications to radio communication services in Japan � Japan Q210/1 2016-11-15
[ 112 ]
(Rev.1)
Progress Report on "Visible light communication" � Netherlands (Kingdom of the) 2016-11-14
[ 111 ]
Liaison statement to Working Party 1A (copied for information to Working Party 6A and ICAO) - Proposed revision of Recommendation ITU-R SM.1009-1 � WP 5B 2016-11-14
[ 110 ]
Proposed modifications to Report ITU-R SM.2028-1 - Monte Carlo simulation methodology for the use in sharing and compatibility studies between different radio services or systems � European Communications Office 2016-11-11
[ 109 ]
Reply liaison statement to Working Party 5C - Copied to Working Party 1A and Working Party 1B for information - Preliminary draft new Report ITU-R F.[FS/RLS COMPATIBILITY IN 71-86 GHZ] � WP 5B 2016-11-11
[ 108 ]
Some comments on the limits for WPT � Germany (Federal Republic of) Q210/1, AI9.1 2016-11-09
[ 107 ]
Proposed modifications to Report ITU-R SM.2392-0: Inclusion of emerging WPT Technologies for Global or Regional Operation Beam-type Wireless Power Transmission (WPT) systems � United States of America 2016-11-07
[ 106 ]
Proposed modifications to Report ITU-R SM.2303-1: Wireless power transmission using technologies other than radio frequency beam � United States of America 2016-11-07
[ 105 ]
Proposed modifications to draft new Recommendation ITU-R SM.[WPT] - Frequency ranges for global or regional operation and human hazards of Non-Beam Wireless Power Transmission (WPT) systems � United States of America 2016-11-07
[ 104 ]
Proposed contribution to a working document towards a preliminary draft new Report ITU-R SM.[WPT Beam Impacts} - Impact study and human hazard issues for wireless power transmission � United States of America 2016-11-07
[ 103 ]
Working document towards a preliminary draft new Report ITU-R SM.[GENERAL PRINCIPLES AND METHODS FOR SHARING BETWEEN RADIOCOMMUNICATION SERVICES] � United States of America 2016-11-07
[ 102 ]
Views on the proposed revision of Recommendation ITU-R SM.1009-1 � United States of America 2016-11-07
[ 101 ]
Proposed frequency bands for wireless power transmission systems � Robert Bosch GmbH Q210/1 2016-11-07
[ 100 ]
Opinion on revision of Recommendation ITU-R SM.1448 � Netherlands (Kingdom of the) 2016-11-07
[ 99 ]
Liaison statement WPT activities � European Telecommunications Standards Institute 2016-11-02
[ 98 ]
Liaison statement to Working Party 1A - Revision of Recommendation ITU-R SM.851 - Sharing between the broadcasting service and the fixed and/or mobile services in the VHF and UHF bands � WP 6A 2016-11-04
[ 97 ]
Liaison statement to Working Party 1A (copy for information to Working Party 5B) - Proposed revision of Recommendation ITU-R SM.1009-1 � WP 6A 2016-11-04
[ 96 ] �
This document has been withdrawn � WP 6A 2016-11-04
[ 95 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz � WP 4A 2016-11-02
[ 94 ]
Reply liaison statement to Working Party 5B regarding technical characteristics for WRC-19 agenda item 1.9.2 (copy to Working Party 1A for information) � WP 7D AI1.9.2 2016-11-01
[ 93 ]
Liaison statement to Working Party 1A - Technical and operational characteristics of radio astronomy systems in the spectrum band 275-450 GHz � WP 7D 2016-11-01
[ 92 ]
Liaison statement to Working Party 1A (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam � WP 7D Q210/1 2016-11-01
[ 91 ]
Reply liaison statement to Working Party 1A on WRC-19 agenda item 1.15 (copy to Working Parties 5A and 5D) � WP 7C AI1.15 2016-11-01
[ 90 ]
Reply liaison statement to Working Party 1A - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam � WP 7A 2016-10-28
[ 89 ]
Revision of Recommendation ITU-R SM.1448 based on Recommendation ITU-R P.620 � ATDI 2016-10-24
[ 88 ]
Liaison statement from ITU-D Study Group 2 Question 9/2 to ITU-T and ITU-R Study Groups on ongoing collaboration � ITU-D SG 2 2016-10-24
[ 87 ]
Liaison statement from ITU-D Study Group 2 Question 4/2 to ITU-R Study Group 1 Working Party 1A on collaboration � ITU-D SG 2 2016-10-24
[ 86 ]
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C, 7A and 7D - Radio frequency ranges for wireless power transfer (WPT) � WP 6A Q210/1 2016-10-21
[ 85 ]
Liaison statement on leakage and impact of radio frequency noise from telecommunication systems using metallic conductors � ITU-T SG 5 2016-10-19
[ 84 ]
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5 � ITU-T SG 5 2016-10-18
[ 83 ]
New version of the Home Network Transport (HNT) Standards Overview and Work Plan � ITU-T SG 15 2016-10-06
[ 82 ]
New version of the Access Network Transport (ANT) Standards Overview and Work Plan � ITU-T SG 15 2016-10-06
[ 81 ]
Liaison statement on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) Standards Overviews and Work Plans � ITU-T SG 15 2016-10-06
[ 80 ]
Answer to liaison statement to External Organizations on Report ITU-R SM.[SMART_GRID] on the Smart Grid project � Telefon AB - LM Ericsson , Huawei Technologies Co. Ltd. , Intel Corporation , Ligado NETWORKS LLC , NEC Corporation , Nokia Solutions and Networks Oy , Qualcomm, Inc. , Samsung Electronics Co., Ltd. , Telecom Italia S.p.A. 2016-09-27
[ 79 ]
Liaison statement on recent work by JCA-IoT and SC&C � ITU-T JCA-IoT & SC&C 2016-09-26
[ 78 ]
Reply liaison statement to Working Party 1A on WPT activities � International Electrotechnical Commission 2016-09-23
[ 77 ]
Information on the preparation of texts for the draft CPM Report to WRC-19 � Chairman, CPM-19 2016-09-19
[ 76 ]
Liaison statement to ITU-R Working Party 1A (copy to Working Party 1B and RG-WPT) - Information on current status of study on Question ITU-R 210-3/1 "Wireless power transmission" in APT Wireless Group � Asia-Pacific Telecommunity 2016-09-16
[ 75 ]
Liaison statement - Leakage and impact of radio frequency noise from telecommunication systems using metallic conductors � ITU-T SG9 2016-09-09
[ 74 ]
Reply liaison statement to Working Parties 1A, 5A and 5C (copied for information to Working Parties 4A, 5D, 6A, 7C and 7D) - Propagation characteristics in the frequency range 275-450 GHz in preparation for WRC-19 agenda item 1.15 � WPs 3K and 3M AI1.15 2016-07-06
[ 73 ]
Liaison statement on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014) � ITU-T SG 15 2016-07-06
[ 72 ]
(Rev.1)
Reply liaison statement to Working Party 7D (copied for information to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and Task Group 5/1) - Propagation data and predictions for coexistence and compatibility studies above 50 GHz � WPs 3K and 3M 2016-07-04
[ 71 ]
Liaison statement to Working Parties 1A, 5A and 5C (copied for information to Working Parties 7C and 7D) - Initial considerations on candidate frequency bands for use by systems in the land mobile and fixed services in the range 275-450 GHz � WP 3M AI_1.15, 257/5, 256/5, 228/3 2016-07-04
[ 70 ]
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz � WP 3J 2016-07-01
[ 69 ]
Reply liaison statement to Working Party 1A (copied to Working Parties 1C, 5A, 5B, 5C, 6A, 7A and 7D) - Assessment of the impact of other emissions to radiocommunication services � WP 3L 2016-07-01
[ 68 ]
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D Study period 2014-2017 (copied to ITU-R Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A for information) � WP 5D 2016-06-28
[ 67 ]
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7 � WP 5D AI1.7 2016-06-24
Results:466 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2020-12-15