Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 116 ]
�
� |
Proposed revision of the work plan for ITU-R Reports of wireless power transmission via Radio Frequency Beam
�
� |
Japan
� |
Q210/1
� |
2016-11-15 |
|
[ 115 ]
�
� |
Proposal of a new Report ITU-R SM.[WPT.SPEC.MNGM] "Methodology for spectrum management of wireless power transmission"
�
� |
Japan
� |
Q210/1
� |
2016-11-15 |
|
[ 114 ]
�
� |
Studies on the impact of wireless power transmission for electric vehicles on broadcasting service
�
� |
Japan
� |
Q210/1, AI9.1
� |
2016-11-15 |
|
[ 113 ]
�
� |
Summary of studies on the impact of WPT for electric vehicle applications to radio communication services in Japan
�
� |
Japan
� |
Q210/1
� |
2016-11-15 |
|
[ 112 ]
�
(Rev.1)� |
Progress Report on "Visible light communication"
�
� |
Netherlands (Kingdom of the)
� |
� |
2016-11-14 |
|
[ 111 ]
�
� |
Liaison statement to Working Party 1A (copied for information to Working Party 6A and ICAO) - Proposed revision of Recommendation ITU-R SM.1009-1
�
� |
WP 5B
� |
� |
2016-11-14 |
|
[ 110 ]
�
� |
Proposed modifications to Report ITU-R SM.2028-1 - Monte Carlo simulation methodology for the use in sharing and compatibility studies between different radio services or systems
�
� |
European Communications Office
� |
� |
2016-11-11 |
|
[ 109 ]
�
� |
Reply liaison statement to Working Party 5C - Copied to Working Party 1A and Working Party 1B for information - Preliminary draft new Report ITU-R F.[FS/RLS COMPATIBILITY IN 71-86 GHZ]
�
� |
WP 5B
� |
� |
2016-11-11 |
|
[ 108 ]
�
� |
Some comments on the limits for WPT
�
� |
Germany (Federal Republic of)
� |
Q210/1, AI9.1
� |
2016-11-09 |
|
[ 107 ]
�
� |
Proposed modifications to Report ITU-R SM.2392-0: Inclusion of emerging WPT Technologies for Global or Regional Operation Beam-type Wireless Power Transmission (WPT) systems
�
� |
United States of America
� |
� |
2016-11-07 |
|
[ 106 ]
�
� |
Proposed modifications to Report ITU-R SM.2303-1: Wireless power transmission using technologies other than radio frequency beam
�
� |
United States of America
� |
� |
2016-11-07 |
|
[ 105 ]
�
� |
Proposed modifications to draft new Recommendation ITU-R SM.[WPT] - Frequency ranges for global or regional operation and human hazards of Non-Beam Wireless Power Transmission (WPT) systems
�
� |
United States of America
� |
� |
2016-11-07 |
|
[ 104 ]
�
� |
Proposed contribution to a working document towards a preliminary draft new Report ITU-R SM.[WPT Beam Impacts} - Impact study and human hazard issues for wireless power transmission
�
� |
United States of America
� |
� |
2016-11-07 |
|
[ 103 ]
�
� |
Working document towards a preliminary draft new Report ITU-R SM.[GENERAL PRINCIPLES AND METHODS FOR SHARING BETWEEN RADIOCOMMUNICATION SERVICES]
�
� |
United States of America
� |
� |
2016-11-07 |
|
[ 102 ]
�
� |
Views on the proposed revision of Recommendation ITU-R SM.1009-1
�
� |
United States of America
� |
� |
2016-11-07 |
|
[ 101 ]
�
� |
Proposed frequency bands for wireless power transmission systems
�
� |
Robert Bosch GmbH
� |
Q210/1
� |
2016-11-07 |
|
[ 100 ]
�
� |
Opinion on revision of Recommendation ITU-R SM.1448
�
� |
Netherlands (Kingdom of the)
� |
� |
2016-11-07 |
|
[ 99 ]
�
� |
Liaison statement WPT activities
�
� |
European Telecommunications Standards Institute
� |
� |
2016-11-02 |
|
[ 98 ]
�
� |
Liaison statement to Working Party 1A - Revision of Recommendation ITU-R SM.851 - Sharing between the broadcasting service and the fixed and/or mobile services in the VHF and UHF bands
�
� |
WP 6A
� |
� |
2016-11-04 |
|
[ 97 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Party 5B) - Proposed revision of Recommendation ITU-R SM.1009-1
�
� |
WP 6A
� |
� |
2016-11-04 |
|
[ 96 ]
�
� |
This document has been withdrawn
�
� |
WP 6A
� |
� |
2016-11-04 |
|
[ 95 ]
�
� |
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
WP 4A
� |
� |
2016-11-02 |
|
[ 94 ]
�
� |
Reply liaison statement to Working Party 5B regarding technical characteristics for WRC-19 agenda item 1.9.2 (copy to Working Party 1A for information)
�
� |
WP 7D
� |
AI1.9.2
� |
2016-11-01 |
|
[ 93 ]
�
� |
Liaison statement to Working Party 1A - Technical and operational characteristics of radio astronomy systems in the spectrum band 275-450 GHz
�
� |
WP 7D
� |
� |
2016-11-01 |
|
[ 92 ]
�
� |
Liaison statement to Working Party 1A (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
�
� |
WP 7D
� |
Q210/1
� |
2016-11-01 |
|
[ 91 ]
�
� |
Reply liaison statement to Working Party 1A on WRC-19 agenda item 1.15 (copy to Working Parties 5A and 5D)
�
� |
WP 7C
� |
AI1.15
� |
2016-11-01 |
|
[ 90 ]
�
� |
Reply liaison statement to Working Party 1A - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
�
� |
WP 7A
� |
� |
2016-10-28 |
|
[ 89 ]
�
� |
Revision of Recommendation ITU-R SM.1448 based on Recommendation ITU-R P.620
�
� |
ATDI
� |
� |
2016-10-24 |
|
[ 88 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 9/2 to ITU-T and ITU-R Study Groups on ongoing collaboration
�
� |
ITU-D SG 2
� |
� |
2016-10-24 |
|
[ 87 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 4/2 to ITU-R Study Group 1 Working Party 1A on collaboration
�
� |
ITU-D SG 2
� |
� |
2016-10-24 |
|
[ 86 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C, 7A and 7D - Radio frequency ranges for wireless power transfer (WPT)
�
� |
WP 6A
� |
Q210/1
� |
2016-10-21 |
|
[ 85 ]
�
� |
Liaison statement on leakage and impact of radio frequency noise from telecommunication systems using metallic conductors
�
� |
ITU-T SG 5
� |
� |
2016-10-19 |
|
[ 84 ]
�
� |
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5
�
� |
ITU-T SG 5
� |
� |
2016-10-18 |
|
[ 83 ]
�
� |
New version of the Home Network Transport (HNT) Standards Overview and Work Plan
�
� |
ITU-T SG 15
� |
� |
2016-10-06 |
|
[ 82 ]
�
� |
New version of the Access Network Transport (ANT) Standards Overview and Work Plan
�
� |
ITU-T SG 15
� |
� |
2016-10-06 |
|
[ 81 ]
�
� |
Liaison statement on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) Standards Overviews and Work Plans
�
� |
ITU-T SG 15
� |
� |
2016-10-06 |
|
[ 80 ]
�
� |
Answer to liaison statement to External Organizations on Report ITU-R SM.[SMART_GRID] on the Smart Grid project
�
� |
Telefon AB - LM Ericsson
,
Huawei Technologies Co. Ltd.
,
Intel Corporation
,
Ligado NETWORKS LLC
,
NEC Corporation
,
Nokia Solutions and Networks Oy
,
Qualcomm, Inc.
,
Samsung Electronics Co., Ltd.
,
Telecom Italia S.p.A.
� |
� |
2016-09-27 |
|
[ 79 ]
�
� |
Liaison statement on recent work by JCA-IoT and SC&C
�
� |
ITU-T JCA-IoT & SC&C
� |
� |
2016-09-26 |
|
[ 78 ]
�
� |
Reply liaison statement to Working Party 1A on WPT activities
�
� |
International Electrotechnical Commission
� |
� |
2016-09-23 |
|
[ 77 ]
�
� |
Information on the preparation of texts for the draft CPM Report to WRC-19
�
� |
Chairman, CPM-19
� |
� |
2016-09-19 |
|
[ 76 ]
�
� |
Liaison statement to ITU-R Working Party 1A (copy to Working Party 1B and RG-WPT) - Information on current status of study on Question ITU-R 210-3/1 "Wireless power transmission" in APT Wireless Group
�
� |
Asia-Pacific Telecommunity
� |
� |
2016-09-16 |
|
[ 75 ]
�
� |
Liaison statement - Leakage and impact of radio frequency noise from telecommunication systems using metallic conductors
�
� |
ITU-T SG9
� |
� |
2016-09-09 |
|
[ 74 ]
�
� |
Reply liaison statement to Working Parties 1A, 5A and 5C (copied for information to Working Parties 4A, 5D, 6A, 7C and 7D) - Propagation characteristics in the frequency range 275-450 GHz in preparation for WRC-19 agenda item 1.15
�
� |
WPs 3K and 3M
� |
AI1.15
� |
2016-07-06 |
|
[ 73 ]
�
� |
Liaison statement on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014)
�
� |
ITU-T SG 15
� |
� |
2016-07-06 |
|
[ 72 ]
�
(Rev.1)� |
Reply liaison statement to Working Party 7D (copied for information to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and Task Group 5/1) - Propagation data and predictions for coexistence and compatibility studies above 50 GHz
�
� |
WPs 3K and 3M
� |
� |
2016-07-04 |
|
[ 71 ]
�
� |
Liaison statement to Working Parties 1A, 5A and 5C (copied for information to Working Parties 7C and 7D) - Initial considerations on candidate frequency bands for use by systems in the land mobile and fixed services in the range 275-450 GHz
�
� |
WP 3M
� |
AI_1.15, 257/5, 256/5, 228/3
� |
2016-07-04 |
|
[ 70 ]
�
� |
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A,
4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
WP 3J
� |
� |
2016-07-01 |
|
[ 69 ]
�
� |
Reply liaison statement to Working Party 1A (copied to Working Parties 1C, 5A, 5B, 5C, 6A, 7A and 7D) - Assessment of the impact of other emissions to radiocommunication services
�
� |
WP 3L
� |
� |
2016-07-01 |
|
[ 68 ]
�
� |
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D Study period 2014-2017 (copied to ITU-R Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A for information)
�
� |
WP 5D
� |
� |
2016-06-28 |
|
[ 67 ]
�
� |
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7
�
� |
WP 5D
� |
AI1.7
� |
2016-06-24 |
Results:466 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):