International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP7C : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP7C� C�

ITU-R�WP7C

Remote Sensing Systems

Results:366 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 16 ]
Liaison statement to ITU-R Working Parties 1B, 7B, 7C and 7D - WRC-15 Agenda item 1.18 � WP 5B 2012-06-01
[ 15 ]
Liaison statement to Working Party 7C - WRC-15 Agenda item 1.12 - Characteristics for radars operating in the radiodetermination service in the frequency bands 8 700-9 300 MHz and 9 900-10 500 MHz � WP 5B 2012-06-01
[ 14 ]
Recommendations ITU-R F.1245-2 and ITU-R F.1336-3 to be brought to the attention of Study Groups 4 and 7 � SG 5 2012-06-01
[ 13 ]
Liaison statement to Working Party 7C - Characteristics of and protection criteria for stations operating in the fixed service in the frequency bands 8 700-8 750 MHz and 10 000-10 500 MHz � WP 5C 2012-05-29
[ 12 ]
Liaison statement of Working Parties 4A and 7C - Proposed suppression of Recommendations ITU-R F.760-1 and ITU-R F.1502 � WP 5C 2012-05-29
[ 11 ]
Liaison statement to Working Party 7C regarding RNSS-Related issues in preliminary draft revision of Recommendation ITU-R RS.1347 - Feasibility of sharing between radionavigation-satellite service receivers and the Earth exploration-satellite (active) and space research (active) services in the 1 215-1 300 MHz band � WP 4C 2012-05-29
[ 10 ]
Liaison statement to Working Party 7C - WRC-15 Agenda item 9.1.1 � WP 4C 2012-05-28
[ 9 ]
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D (Copy to Working Parties 4B and 3M for information) - WRC-15 Agenda item 1.10 � WP 4C 2012-05-28
[ 8 ]
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D (Copy to Working Parties 4B and 3M for information) - WRC-15 Agenda item 1.10 � WP 4C 2012-05-28
[ 7 ]
Reply liaison statement to Working Party 7C - Comments on "potential interference between the Earth exploration-satellite (active) service in the 1 215-1 300 MHz frequency band and the air-route surveillance radars in the 1 215-1 400 MHz frequency band" � WP 5B 2012-05-25
[ 6 ]
Liaison statement to ITU-R Working Parties 5B and 7C - Proposed changes to Recommendations ITU-R M.824-3 and ITU-R M.1176 and WRC-15 Agenda item 1.12 and Resolution COM 6/18 - Use of the frequency range 9 200-9 500 MHz for maritime radionavigation � International Maritime Organization 2012-05-14
[ 5 ]
Question ITU-R 212-4/5 to be brought to the attention of Study Groups 1, 4 and 7 � SG 5 2012-04-24
[ 4 ]
Recommendation ITU-R F.758-5 to be brought to the attention of Study Groups 4, 6 and 7 � SG 5 2012-04-24
[ 3 ]
Questions ITU-R 1-5/5 and 252/5 to be brought to the attention of Study Groups 1, 4, 6 and 7 � SG 5 2012-04-24
[ 2 ]
Liaison statement to Study Groups 4, 5, 6 and 7, and Working Parties 4A, 4B, 4C, 5A, 5B, 5C 5D, 6A, 7B, 7C and 7D - Preparations for WRC-15 Agenda items 1.1 and 1.2 in response to decisions of CPM15-1 � Chairman, JTG 4-5-6-7 2012-03-26
[ 1 ]
Documents to be carried over from the 2007-2011 study period � WP 7C 2012-01-26
Results:366 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2015-10-23