Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 253 ]
�
� |
Proposed revisions to draft text for the CPM Report Chapter 3 for WRC-12 agenda item 1.5
�
� |
United States of America
� |
� |
2009-11-10 |
|
[ 252 ]
�
� |
Proposed changes to Annex 8 of the Working Party 5C Chairman's Report (Doc. 5C/217) - Working document towards a preliminary draft new Recommendations ITU-R F.[HAPS MODELLING] - Analysis of the impact of interference into haps gateway links from GSO FSS Earth-to-space links in the 5 850-6 725 MHz frequency band
�
� |
United States of America
� |
� |
2009-11-10 |
|
[ 251 ]
�
� |
Proposed revisions to draft text for the CPM Report - WRC-12 Agenda item 1.5
�
� |
Australia
� |
� |
2009-11-09 |
|
[ 250 ]
�
� |
Liaison statement to Working Party 5C - Gateway links for high altitude platform stations (HAPS) in the frequency band 5 850-7 075 MHz
�
� |
WP 4A
� |
� |
2009-10-14 |
|
[ 249 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Party 6A for information) - Harmonization on electronic news gathering in the satellite frequency bands
�
� |
WP 4A
� |
� |
2009-10-14 |
|
[ 248 ]
�
� |
Liaison statement to Working Party 5C - Disposition of Recommendation ITU-R SF.675-2
�
� |
WP 4A
� |
� |
2009-10-14 |
|
[ 247 ]
�
� |
Liaison statement to Working Party 5C - FSS Characteristics to be used for sharing studies in the 71-76 GHz and 81-86 GHz bands
�
� |
WP 4A
� |
� |
2009-10-14 |
|
[ 246 ]
�
� |
Liaison statement to Working Party 5C - Radio nois in the HF frequency band
�
� |
WP 1C
� |
231/1
� |
2009-10-13 |
|
[ 245 ]
�
� |
Liaison statement to ITU-R Study Group 3 and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D on the progress of WRC-12 Agenda item 1.19
�
� |
WP 1B
� |
� |
2009-10-12 |
|
[ 244 ]
�
� |
Liaison statement - Further work on PLT
�
� |
WP 1A
� |
221-2/1
� |
2009-10-09 |
|
[ 243 ]
�
� |
Liaison statement to Working Party 5C - Preliminary review of certain SF-series Recommendations
�
� |
WP 4A
� |
� |
2009-10-05 |
|
[ 242 ]
�
� |
Liaison statement to Working Party 5C - Information for studies related to WRC-12 Agenda item 1.25
�
� |
WP 4C
� |
� |
2009-10-05 |
|
[ 241 ]
�
� |
Interim Report on the Study Group 5 activity
�
� |
Chairman, SG 5
� |
� |
2009-10-01 |
|
[ 240 ]
�
� |
Liaison statement to Working Party 5C - Preliminary draft revision of Recommendations ITU-R SA.1275-2 and SA.1276-2
�
� |
WP 7B
� |
� |
2009-09-29 |
|
[ 239 ]
�
� |
Liaison statement to ITU-R Working Parties 4A, 5A, and 5C on WRC-12 Agenda item 1.12
�
� |
WP 7B
� |
� |
2009-09-29 |
|
[ 238 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Party 6B for information) - Harmonization of spectrum for use by terrestrial electronic news gathering systems
�
� |
WP 7B
� |
� |
2009-09-29 |
|
[ 237 ]
�
� |
Liaison statement to Working Party 6B (copy to Working Party 5C for information) - Preliminary draft new Recommendation ITU-R BT.[ENGUSER] - User requirements for electronic news gathering
�
� |
WP 7B
� |
� |
2009-09-29 |
|
[ 236 ]
�
� |
Liaison statement to Working Party 5C - Sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz
�
� |
WP 7B
� |
� |
2009-09-29 |
|
[ 235 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Party 5C for information) - Request for advice on parameters needed for compatibility studies between NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11
�
� |
WP 7B
� |
� |
2009-09-28 |
|
[ 234 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Parties 5A and 5B for information) - Draft CPM text on WRC-12 Agenda item 1.24
�
� |
WP 7B
� |
� |
2009-09-28 |
|
[ 233 ]
�
� |
Liaison statement to Working Parties 5B, 5C and 3L - Considerations relating to sharing studies and CPM text in support of WRC-12 Agenda item 1.16 (Resolution 671 (WRC-07))
�
� |
WP 7C
� |
� |
2009-09-25 |
|
[ 232 ]
�
� |
Reply liaison statement to Working Party 5C - Information regarding studies under Question ITU-R 232-1/7
�
� |
WP 7C
� |
232/7
� |
2009-09-25 |
|
[ 231 ]
�
� |
Liaison statement to Working Party 5C - WRC-12 Agenda item 1.20 - HAPS gateway links
�
� |
WP 7D
� |
� |
2009-09-14 |
|
[ 230 ]
�
� |
Liaison statement to Working Party 5C - Sharing analysis between non-GSO meteorological satellite systems operating in the space-to-Earth direction and fixed service systems in the band 7 850-7 900 MHz
�
� |
WP 7B
� |
� |
2009-09-14 |
|
[ 229 ]
�
� |
ABU views on WRC-12 Agenda items 1.4, 1.5, 1.10, 1.13, 1.14, 1.15, 1.19, 1.22, 1.25
�
� |
Asia-Pacific Broadcasting Union (ABU)
� |
� |
2009-09-07 |
|
[ 228 ]
�
� |
Liaison statement - Report of the 1st meeting of the Focus Group on Future Networks (FG-FN)
�
� |
Chairman, ITU-T Focus Group on FN
� |
� |
2009-07-28 |
|
[ 227 ]
�
� |
Result of the proposed suppression of Recommendation ITU-R SF.675
�
� |
Chairmen, SGs 4 & 5
� |
� |
2009-07-27 |
|
[ 226 ]
�
� |
Result of the proposed suppression of certain F-series Recommendations
�
� |
Chairman, SG 5
� |
� |
2009-07-16 |
|
[ 225 ]
�
� |
Liaison statement to ITU-R Working Parties 1B and 5A (copy to Working Parties 5B and 5C for information) - On the study of software-defined radio (SDR) and cognitive radio systems (CRS)
�
� |
WP 5D
� |
� |
2009-07-06 |
|
[ 224 ]
�
� |
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C, 7D and Joint Task Group 5-6 - Development of a Handbook on propagation information for the prediction of interference and coordination distance
�
� |
WP 3M
� |
� |
2009-06-18 |
|
[ 223 ]
�
� |
Liaison statement to Working Party 5C - Preliminary draft revision of Recommendation ITU-R F.1335 - Technical and operational considerations in the phased transitional approach for bands shared between the mobile-satellite service and the fixed service at 2 GHz
�
� |
WP 3M
� |
� |
2009-06-18 |
|
[ 222 ]
�
� |
Liaison statement to Working Party 4A on WRC-11 Agenda item 1.13 (copy to Working Party 5C and Working Party 6B)
�
� |
WP 5A
� |
� |
2009-06-08 |
|
[ 221 ]
�
� |
Liaison statement to Working Party 1B on the study of software-defined radio and cognitive radio systems (copy for information to WPs 5B, 5C and 5D)
�
� |
WP 5A
� |
� |
2009-05-28 |
|
[ 220 ]
�
� |
Liaison statement to Working Party 5C - Guidance to administrations in their bilateral/multilateral coordination/negotiations dealing with sharing between stations of fixed and/or land mobile services with stations of other terrestrial services operating in the neighbouring countries
�
� |
WP 5A
� |
� |
2009-05-27 |
|
[ 219 ]
�
� |
Construction of the web page for the analytical list of the Study Group 5 Recommendations
�
� |
Chairman, SG 5
� |
� |
2009-05-27 |
|
[ 218 ]
�
� |
Liaison statement to Working Party 5B (copy to Working Party 5C for information) - WRC-11 Agenda item 1.14
�
� |
WP 5A
� |
� |
2009-05-27 |
|
[ 217 ]
�
+Ann.1-20� |
Report of the third meeting of Working Party 5C (Geneva, 18 - 27 May 2009)
�
� |
Chairman, WP 5C
� |
� |
2009-05-27 |
|
[ 216 ]
�
� |
Final List of Participants - Working Party 5C (Geneva, 18-27 May 2009)
�
� |
Director, BR
� |
� |
2009-05-27 |
|
[ 215 ]
�
� |
Liaison statement - Proection criteria and system parameters for fixed and mobile systems operating between 3 and 50 MHz
�
� |
WP 5B
� |
� |
2009-05-25 |
|
[ 214 ]
�
� |
Reply Liaison statement to ITU-R Working Party 5C - Aircraft stations deployment scenario for simulation refinements for the derivation of a PDF mask for the protection of the fixed service in the 37-38 GHz band
�
� |
WP 5B
� |
� |
2009-05-25 |
|
[ 213 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2009-05-15 |
|
[ 212 ]
�
� |
Liaison statement to Working Party 5C (copy to WPs 4A, 4C, 5A, 6A, 6C, 7B and 7D for information) - Preliminary draft new Recommendation ITU-R BT.[ENGUSER] - User requirements for electronic news gathering
�
� |
WP 6B
� |
� |
2009-05-14 |
|
[ 211 ]
�
� |
Liaison statement - Proposed revisions to Recommendations ITU-R M.1319-2, ITU-R M.1469-1, ITU-R M.1472, ITU-R M.1473, ITU-R M.1474 and ITU-R M.1471
�
� |
WP 4C
� |
� |
2009-05-14 |
|
[ 210 ]
�
� |
Reply liaison statement to ITU-R Working Party 5B on studies related to WRC-11 Agenda item 1.15 (copy to Working Parties 5A, 5C and 7B and 7D for information) - Consider possible allocations in the frequency range 3-50 MHz to the radiolocation service for oceanographic radar applications
�
� |
WP 6A
� |
240/5
� |
2009-05-13 |
|
[ 209 ]
�
� |
Reply liaison statement to ITU-R Working Parties 5B and 5C (copy to Working Parties 5A, 7B and 7D for information) - Consider possible allocations in the frequency range 3-50 MHz to the radiolocation service for oceanographic radar applications
�
� |
WP 6A
� |
� |
2009-05-13 |
|
[ 208 ]
�
� |
Liaison statement to Working Party 5C - Progress on WRC-11 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems
�
� |
WP 6A
� |
� |
2009-05-13 |
|
[ 207 ]
�
� |
Liaison statement to Working Party 5C - Harmonization of spectrum for use by terrestrial electronic news gathering systems
�
� |
WP 6A
� |
� |
2009-05-13 |
|
[ 206 ]
�
� |
Liaison statement to Working Parties 5C and 6B for action and to Working Parties 3M, 4B, 5A, 6A and 7D for information on WRC-11 Agenda item 1.13
�
� |
WP 4A
� |
� |
2009-05-11 |
|
[ 205 ]
�
� |
Liaison statement to Working Party 5C - Information for studies related to WRC-11 Agenda item 1.25
�
� |
WP 4C
� |
� |
2009-05-13 |
|
[ 204 ]
�
� |
Liaison statement to Working Party 5C - WRC-11 Agenda item 1.18
�
� |
WP 4C
� |
� |
2009-05-13 |
Results:603 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):