International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5B� C�

ITU-R�WP5B

Maritime mobile service including Global Maritime Distress and Safety System (GMDSS); aeronautical mobile service and radiodetermination service

Results:813 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 463 ]
Liaison statement to Working Party 5B on WRC-12 Agenda item 1.3 - Use of FSS for unmanned aircraft � WP 4A 2010-04-30
[ 462 ]
Draft proposal on regulation of 500 kHz - Basic system requirements and performance objectives for fixed wireless access using mobile-derived technologies offering telephony and data communication services � China (People's Republic of) 2010-04-30
[ 461 ]
Draft preliminary proposal for a future new MMSI numbering system � Telenor ASA 2010-04-29
[ 460 ]
Working document towards a draft new Report ITU-R M.[RLS 3-50 MHz SHARING] � Japan 240/5 2010-04-28
[ 459 ]
Draft CPM text on WRC-12 Agenda item 1.15 - Chapter 2 Radiolocation and amateur issues � Japan 2010-04-28
[ 458 ]
Working document towards a draft new Report ITU-R [RLS 3-50 MHz Sharing] - Problems of estimation of protection distances for oceanographic radars (WRC-12 Agenda item 1.15) � Russian Federation 240/5 2010-04-27
[ 457 ]
Proposed modifications to the working document towards draft CPM text on WRC-12 Agenda item 1.10 � Russian Federation 2010-04-27
[ 456 ]
Proposed modifications towards CPM text on Agenda item 1.4 WRC-12 � Russian Federation 2010-04-27
[ 455 ]
Proposed modifications towards draft CPM text regarding sharing in the adjacent bands on Agenda item 1.14 WRC-12 � Russian Federation 2010-04-27
[ 454 ]
Sharing studies between RLS in the frequency band 154-156 MHz and RAS systems in the frequency band 150.05-153 MHz � Russian Federation 2010-04-27
[ 453 ]
Proposals for modifications of draft CPM text on WRC-12 Agenda item 1.14 � Russian Federation 2010-04-27
[ 452 ]
Working document towards draft CPM text on WRC-12 Agenda item 1.10 � France 2010-04-24
[ 451 ]
Proposed amendments to the preliminary draft new Report ITU-R M.[WAIC] - Technical characteristics and operational objectives for installed wireless avionics intra-communications (WAIC) � Germany (Federal Republic of) 249/5 2010-04-23
[ 450 ]
Working document toward a draft new Report ITU-R M.[ ] "EMC analysis of VHF radar stations operating in the maritime mobile service band 154-156 MHz and stations operating in the band 156-162 MHz � United States of America 96/5 2010-04-20
[ 449 ]
Draft new Report ITU-R M.[RLS 3-50 MHz SHARING] - On the feasibility of sharing sub-bands between oceanographic radars and fixed and mobile services within the 3-50 MHz band � United States of America 240/5 2010-04-20
[ 448 ]
Working document towards a preliminary draft new Report ITU-R M.[ ] on technical characteristics and operational objectives for installed Wireless Avionics Intra-Communications for multiple aircraft scenarios (WAIC) � United States of America 249/5 2010-04-20
[ 447 ]
Preliminary draft new Report ITU-R M.[ ] on technical characteristics and operational objectives for installed Wireless Avionics Intra-Communications (WAIC) � United States of America 249/5 2010-04-20
[ 446 ]
Preliminary draft new Report ITU-R M.[AM(R)S_1GHz_SHARING] - AM(R)S sharing feasibility in the 960-1 164 MHz band � Netherlands (Kingdom of the) 2010-04-21
[ 445 ]
Working document towards draft CPM text on WRC-12 Agenda item 1.4 � Netherlands (Kingdom of the) 2010-04-21
[ 444 ]
Working paper on coexistence of FCS and TACAN systems � Netherlands (Kingdom of the) 2010-04-21
[ 443 ]
Protection distance for sharing RAS and AM(R)S in 5GHz bands - AM(R)S sharing feasibility in the 5 000 - 5 030 MHz band � Netherlands (Kingdom of the) 235/5 2010-04-21
[ 442 ]
Preliminary-draft new Report ITU-R M.[AMRS-5GHZ] - Spectrum requirements for surface applications at airports in the 5 GHz range � Netherlands (Kingdom of the) 2010-04-21
[ 441 ]
Proposed amendments to the working document towards the draft CPM text on WRC-12 agenda item 1.10 � Romania 2010-04-20
[ 440 ]
Proposed amendments to the working document towards the draft CPM text on WRC-12 Agenda item 1.9 � Netherlands (Kingdom of the) 2010-04-16
[ 439 ]
Comments on Recommendation ITU-R M.493-13 from ETSI ERM-TG26 � Netherlands (Kingdom of the) 2010-04-16
[ 438 ]
Follow-up study after the work of Joint Task Group 5-6 is over � Chairmen, SGs 5 and 6 2010-04-12
[ 437 ]
APT common views - WRC Agenda item 1.14 � Asia-Pacific Telecommunity (APT) 2010-04-07
[ 436 ]
Draft IMO position on WRC-12 Agenda items concerning matters relating to maritime services � International Maritime Organization 2010-03-19
[ 435 ]
Liaison statement - Implementation of Resolution 355 (WRC-07) � International Maritime Organization 2010-03-19
[ 434 ]
Liaison statement - Recommendation ITU-R M.493-13 on digital selective calling system for use in the maritime mobile service and MMSI numbering systems for hand held VHF DSC radios � International Maritime Organization 2010-03-19
[ 433 ]
Liaison statement - Specifications of "man overboard" devices � International Maritime Organization 2010-03-19
[ 432 ]
Liaison statement to Working Party 6A (copied to Working Parties 5A, 5B and 5C for information) - Sharing and compatibility studies related to IMT systems in the mobile service � WP 5D 2010-03-22
[ 431 ]
Liaison statement to WP 5A (copy to WP 5B) - Draft revision of Report ITU-R M.1051-1 - Public mobile telephone service with aircraft � WP 5D 2010-03-22
[ 430 ]
ITU-T G.9960 collaboration to address power line communication signal power � ITU-T SG 15 2010-03-05
[ 429 ]
Reply to Document 4C/354 and comments on Document 4C/355 � International Civil Aviation Organization 2010-03-03
[ 428 ]
Results of the 17th RAG meeting � Chairman, SG 5 2010-03-03
[ 427 ]
Liaison statement to the relevant Working Parties of Study Groups 4, 5, 6 and 7 (copy to ITU-T Study Group 15 for information) - Further work on power line telecommunications � WP 1A 221-1/1 2010-03-01
[ 426 ]
Liaison statement to Working Party 5B - Progress of work in the Working Party 5B Rapporteur Group on unwanted emissions of radar � WP 1A 2010-02-18
[ 425 ]
Draft Liaison statement to Working Parties 4A, 4C, 5A, and 6A (copy to Working Parties 5B, 5C, 7A, 7B, 7C and Study Group 3) on WRC-12 Agenda item 1.2 � WP 1B 2010-02-17
[ 424 ]
ITU-R Study Group 4 Question to be brought to the attention of Study Groups 5 and 7 � BR Study Group Department 2010-02-04
[ 423 ]
+Corr.1
Additional information for the preparation of the draft CPM Report to WRC-12 � Chairman, CPM-11 2010-01-22
[ 422 ]
Liaison note to Working Party 5B - Applicability of Art. 51, Section III of the ITU Radio Regulations for airborne AIS � IALA 2009-12-14
[ 421 ]
Liaison statement to Working Party 1A (copy to Working Parties 5A, 5B, 5C and 7D for information) - Report ITU-R SM.2158 - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz � WP 6A 2009-12-08
[ 420 ]
Liaison statement to Working Parties 5B, 5C and 6A - Working documents towards Reports related to amateur service operation in the WRC-12 Agenda item 1.23 for the proposed band of 415-526.5 kHz � WP 5A 2009-12-07
[ 419 ]
Liaison statement to Working Parties 5B, 5C and 6A - Working document towards draft CPM text for WRC-12 Agenda item 1.23 � WP 5A 2009-12-07
[ 418 ]
Liaison statement to Working Party 5B - Preliminary update of Recommendation ITU-R M.1652 � WP 5A 2009-12-07
[ 417 ]
+Ann.1-38
Report of the fourth meeting of Working Party 5B (Geneva, 23 November - 4 December 2009) � Chairman, WP 5B 2009-12-04
[ 416 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7D and to the Working Party of the Special Committee - WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems � WP 5C 2009-12-04
[ 415 ]
Final List of Participants - Working Party 5B (Geneva, 23 November - 4 December 2009) � Director, BR 2009-12-04
[ 414 ]
(Rev.1)
Liaison statement to Working Party 5B - Progress of work on WRC-12 Agenda item 1.20 � WP 5C 2009-12-03
Results:813 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2012-04-30