Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG 15 : Reuni�n�2017-06-19�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG 15� C�(2017-06-19)�

UIT-T�SG 15

Transport, access and home

Periodo de estudios 2017

Reuni�n� del 2017-06-19 al 2017-06-30

Lugar : Suiza [Ginebra]

Otras reuniones : 2021-12-062021-04-122020-09-072020-01-272019-07-012018-10-082018-01-29

Resultados :398 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 98 ]
Proposed Input about Network Slicing to draft G.7702 � ZTE Corporation (China) Q12/15 2017-06-05
[ 97 ]
Proposal for a new G.984.5 Amd to study integrated WDM1r method and other coexistence items � China Telecommunications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China) Q2/15 2017-06-05
[ 96 ]
Proposed functional model for interconnected rings in the draft G.8132/Y.1383 � Ministry of Science, ICT and Future Planning (MSIP) Q9/15 2017-06-05
[ 95 ]
G.8275.2 BMCA Cycling avoidance method � Cisco Systems, Inc. (United States) Q13/15 2017-06-04
[ 94 ]
+Corr.1
Proposal of methods and parameters of oscillator monitoring (G.Suppl. Sync OAM) � Microsemi Corporation (United States) , Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q13/15 2017-06-04
[ 93 ]
Classification of synchronization network operation for failure cases (G.Suppl.Sync OAM) � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q13/15 2017-06-04
[ 92 ]
Proposal of description of PTP path monitoring in G.Suppl.Sync OAM � Nippon Telegraph and Telephone Corporation (NTT) (Japan) Q13/15 2017-06-04
[ 91 ]
G.8275.2 & G.8271.2 - Phase delivery over PTP unaware network � ADVA Optical Networking (United Kingdom) Q13/15 2017-06-04
[ 90 ]
Clarification on WD06-06 of the Q6 Sunnyvale Interim meeting Jan. 16-19, 2017 � Coriant GmbH & Co. KG (Germany) , Deutsche Telekom AG (Germany) , Keysight Technologies Deutschland GmbH , Nokia Q6/15 2017-06-04
[ 89 ]
Twisted pair distribution cable measurements up to 110 MHz � Proximus PLC Q4/15 2017-06-04
[ 88 ]
G.8275.2 Deployment in Full PTP aware network � Cisco Systems, Inc. (United States) Q13/15 2017-06-04
[ 87 ]
Asymmetric latency measurement � IP Light Q13/15, Q11/15 2017-06-04
[ 86 ]
ODUk new delay measurement method � IP Light Q13/15, Q11/15 2017-06-04
[ 85 ]
G.811.1 ePRC Test Results � ADVA Optical Networking (United Kingdom) Q13/15 2017-06-04
[ 84 ]
Draft new Recommendation: Generic architecture of home networks for energy management � Fujitsu Limited (Japan) , Japan Advanced Institute of Science and Technology , Kanazawa Institute of Technology , Mitsubishi Electric Corporation , Oki Electric Industry Company Ltd. (OKI) , Panasonic Corporation Q15/15 2017-06-04
[ 83 ]
OSC requirement proposal � China Unicom , Huawei Technologies Co., Ltd. (China) Q11/15 2017-06-03
[ 82 ]
Text proposal for ETY and FlexE layer atomic functions � Huawei Technologies Co., Ltd. (China) Q11/15, Q10/15 2017-06-03
[ 81 ]
OTN network slicing considerations � China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) Q11/15 2017-06-03
[ 80 ]
(Rev.1)
Application specific FlexO-LR port on router or other packet switch � China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) Q11/15 2017-06-03
[ 79 ]
Considerations on timing transparency in application specific transport networks � Huawei Technologies Co., Ltd. (China) Q11/15 2017-06-03
[ 78 ]
Hybrid tributary slot granularity in application specific OTN solutions � Huawei Technologies Co., Ltd. (China) Q11/15 2017-06-03
[ 77 ]
MFI interface considerations � Huawei Technologies Co., Ltd. (China) Q11/15 2017-06-03
[ 76 ]
(Rev.1)
Proposed text for 200G and 400G FlexO-SR in G.709.1 � Huawei Technologies Co., Ltd. (China) Q11/15 2017-06-03
[ 75 ]
Restructuring G.709.1 clauses � Huawei Technologies Co., Ltd. (China) Q11/15 2017-06-03
[ 74 ]
Proposed text for new Annex I and J of G.709 � Huawei Technologies Co., Ltd. (China) Q11/15 2017-06-03
[ 73 ]
OTUCn-M functional model and replacement signals � Huawei Technologies Co., Ltd. (China) Q11/15 2017-06-03
[ 72 ]
G.7044 revision comments � Huawei Technologies Co., Ltd. (China) Q11/15 2017-06-03
[ 71 ]
Proposed update of Appendix I/G.781 � Huawei Technologies Co., Ltd. (China) Q13/15, Q11/15 2017-06-03
[ 70 ]
Support of OTSiA OH in existing OTN networks � Huawei Technologies Co., Ltd. (China) Q11/15 2017-06-03
[ 69 ]
Optical layer independent OTU adaptation functions in G.798 � Huawei Technologies Co., Ltd. (China) Q11/15 2017-06-03
[ 68 ]
OCh and OTSiA OH associated with FlexO-LR � Huawei Technologies Co., Ltd. (China) Q6/15, Q14/15, Q11/15 2017-06-03
[ 67 ]
Consideration on FEC scheme for 200G/400G FlexO-LR � Inphi Corporation Q11/15 2017-06-03
[ 66 ]
n�25G FlexO-FR frame format, overhead and multiplexing structure � FiberHome Technologies Group (China) Q11/15 2017-06-02
[ 65 ]
(Rev.1)
n�25G FlexO bit rate, FEC and client mapping options for next generation Mobile Fronthaul Transport � FiberHome Technologies Group (China) Q11/15 2017-06-02
[ 64 ]
Lite and Flexible OTN for next generation (5G) Mobile Fronthaul Transport � China Telecommunications Corporation , FiberHome Technologies Group (China) Q11/15 2017-06-02
[ 63 ]
FOICk.n framer module interfaces (MFI) in G.Sup58 Ed.2 revision � FiberHome Technologies Group (China) Q11/15 2017-06-02
[ 62 ]
Updating G.808.2 to better distinguish between circuit and packet applications � Coriant GmbH & Co. KG (Germany) Q9/15 2017-06-02
[ 61 ]
RE CT and ONU association detection in G.9807.2 � Futurewei Technologies US R&D Center (United States) Q2/15 2017-06-02
[ 60 ]
G.sup.HSP requirement discussion � Futurewei Technologies US R&D Center (United States) Q2/15 2017-06-02
[ 59 ]
G.RoF physical layer and system requirements � Futurewei Technologies US R&D Center (United States) Q2/15 2017-06-02
[ 58 ]
Link aggregation bonded ONU management in G.988 � Futurewei Technologies US R&D Center (United States) Q2/15 2017-06-02
[ 57 ]
Suggested location of information related to LDV for attenuation � OFS Fitel, LLC Q6/15, Q5/15 2017-06-02
[ 56 ]
Explicit and Simple Formulae for Constellation Impairment Parameters that Minimize the EVM � Tektronix, Inc. Q6/15 2017-06-02
[ 55 ]
G.8273.2: Noise transfer: allowance for noise generation � Calnex Solutions Limited Q13/15 2017-06-02
[ 54 ]
Document withdrawn � N/A (no se aplica) � 2017-06-02
[ 53 ]
Discovery option - LLDP/MAC � Ciena Canada Q14/15 2017-06-02
[ 52 ]
Recommendation Relationships � Ciena Canada Q14/15, Q12/15 2017-06-02
[ 51 ]
(Rev.1)
G.7702 - Controller interactions � Ciena Canada Q14/15, Q12/15 2017-06-02
[ 50 ]
G.7702 - Management � Ciena Canada Q14/15, Q12/15 2017-06-02
[ 49 ]
G.7702 - resource views and forwarding configuration � Ciena Canada Q14/15, Q12/15 2017-06-02
Resultados :398 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-25