Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Reuni�n�2009-09-28�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� C�(2009-09-28)�

UIT-T�SG15

Transport network structures

Periodo de estudios 2009

Reuni�n� del 2009-09-28 al 2009-10-09

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-102012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-05-152008-12-01

Resultados :399 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 447 ]
Proposed texts for clause 11.2.1 of G.8031 � Mitsubishi Electric Corporation Q9/15 2009-09-16
[ 446 ]
Document withdrawn � N/A (no se aplica) � 2009-09-16
[ 445 ]
Management of high capacity connections in the OTN � Huawei Technologies Q12/15 2009-09-16
[ 444 ]
Document withdrawn � N/A (no se aplica) � Q14/15 2009-09-16
[ 443 ]
Text proposal to align clause 9/G.872 with draft revised G.709 � Huawei Technologies Q12/15 2009-09-16
[ 442 ]
Document withdrawn � N/A (no se aplica) � 2009-09-16
[ 441 ]
GPON over OTN mapping � Huawei Technologies , China Mobile Communications Corporation , PMC-Sierra Q2/15, Q11/15 2009-09-16
[ 440 ]
Proposal to extend G.798 with new features in draft revised G.709 and APS OH access � Huawei Technologies Q9/15 2009-09-16
[ 439 ]
Text proposal for clause 8/G.798.1 � Huawei Technologies Q9/15 2009-09-16
[ 438 ]
Proposal to specify OCh/OTUkV_A with OTUk_CP � Huawei Technologies Q9/15, Q11/15 2009-09-16
[ 437 ]
Multi-vendor demarcation in the OTN � Huawei Technologies Q9/15, Q11/15 2009-09-16
[ 436 ]
LO and HO ODU view points and NNIs � Huawei Technologies Q9/15, Q11/15 2009-09-16
[ 435 ]
Document withdrawn �
See C533
N/A (no se aplica) � 2009-09-16
[ 434 ]
First models of OTN equipment proposal � Huawei Technologies Q9/15 2009-09-16
[ 433 ]
Multi-lane STM-256 � AT&T Q11/15 2009-09-16
[ 432 ]
Optical Monitoring � AT&T Q7/15, Q6/15 2009-09-16
[ 431 ]
G.709 "Black Link" OTM-1r.m Interface as IrDI � AT&T Q6/15, Q12/15, Q11/15 2009-09-16
[ 430 ]
G.709 OTN domains � AT&T Q11/15 2009-09-16
[ 429 ]
G.8032 (Comments on Draft) � Nortel Networks (Canada) Q9/15 2009-09-16
[ 428 ]
Additional requirements for G.7718 � Alcatel-Lucent , NTT Q14/15 2009-09-16
[ 427 ]
G.8032 (Access Protection) � Nortel Networks (Canada) Q9/15 2009-09-16
[ 426 ]
Eye Mask for 10G G.695 � Nortel Networks (Canada) Q6/15 2009-09-16
[ 425 ]
Support for the approval of G.9960 and consent of G.hn Recommendations � Portugal Telecom Q4/15 2009-09-15
[ 424 ]
Proposal of fibre macrobending identification method � SoftBank Telecom Q5/15 2009-09-15
[ 423 ]
Considerations of Y.1731 Performance Monitoring � NEC Corporation Q10/15 2009-09-15
[ 422 ]
Configuration principle of interconnected rings in G.8032v2 � NEC Corporation Q9/15 2009-09-15
[ 421 ]
Considerations of guard timer in G.8032v2 � NEC Corporation Q9/15 2009-09-15
[ 420 ]
Considerations of FS state in G.8032v2 � NEC Corporation Q9/15 2009-09-15
[ 419 ]
Considerations of initial state in G.8032v2 � NEC Corporation Q9/15 2009-09-15
[ 418 ]
Proposed text for equal priority requests in G.8031 � NEC Corporation Q9/15 2009-09-15
[ 417 ]
Proposed modification for loss measurement process in G.8021 � NEC Corporation Q9/15 2009-09-15
[ 416 ]
Draft new Recommendation L.limt "Low impact mini-trench installation technique" � Sirti SpA Q16/15 2009-09-15
[ 415 ]
Considerations about physical layer configurations for WSON � Ericsson Q6/15 2009-09-15
[ 414 ]
Proposal of architecture of G.omci � NTT Q2/15 2009-09-15
[ 413 ]
Proposal of home network remote management requirements on G.hntreq � NTT Q1/15 2009-09-15
[ 412 ]
(Rev.1)
Latency Measurements in the Optical Transport Network Using G.709 Overhead � Verizon , AT&T , BT , Nokia Siemens Networks Q9/15, Q11/15 2009-09-15
[ 411 ]
Sublayers and WSON in G.872 � Ciena Corp Q12/15 2009-09-15
[ 410 ]
An updated Topology model for WSON � Ciena Corp Q12/15 2009-09-15
[ 409 ]
Some thoughts on Transport Entities � Ciena Corp Q12/15 2009-09-15
[ 408 ]
Characteristic Information, Sublayers and Media � Ciena Corp Q12/15 2009-09-15
[ 407 ]
Mapping of 100GBASE-R into OPU4 � Alcatel-Lucent Q11/15 2009-09-15
[ 406 ]
BIP-8 handling in adaptation of 40GBASE-R into OPU3 and 100GBASE-R into OPU4 � Alcatel-Lucent Q9/15, Q11/15 2009-09-15
[ 405 ]
Adaptation of STM-256 over multichannel parallel interfaces � Alcatel-Lucent , Cisco , Finisar , Juniper Q9/15, Q11/15 2009-09-15
[ 404 ]
Propose to add Link discover Process based on OAM in G.8051 � ZTE Corporation Q14/15 2009-09-15
[ 403 ]
Propose to add requirement of MAC topology management � ZTE Corporation Q14/15 2009-09-15
[ 402 ]
Propose to add MAC Link discover support in G.8051 � ZTE Corporation Q14/15 2009-09-15
[ 401 ]
Propose to add requirement of discovery support on MPLS-TP OAM Requirement � ZTE Corporation Q14/15, Q12/15 2009-09-15
[ 400 ]
Propose to add requirement of discovery support on MPLS-TP NM Requirement � ZTE Corporation Q14/15, Q12/15 2009-09-15
[ 399 ]
CSF Indication for Y.1731 (Ethernet OAM) � Alcatel-Lucent Q9/15, Q10/15 2009-09-15
[ 398 ]
Correct power budget modelling of indoor access installations � Draka Communications Q5/15, Q16/15 2009-09-15
Resultados :399 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-26