Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 613 ]
�
� |
Subnetwork, Matrix and Link
�
� |
Alcatel-Lucent
� |
Q12/15
� |
2007-05-25 |
|
[ 612 ]
�
� |
Pre-condition for client/server independence
�
� |
Alcatel-Lucent
� |
Q12/15
� |
2007-05-25 |
|
[ 611 ]
�
� |
E-LAN and E-TREE service support in T-MPLS networks
�
� |
Alcatel-Lucent
� |
Q12/15, Q11/15, Q9/15
� |
2007-05-25 |
|
[ 610 ]
�
� |
Designing a scalable T-MPLS network architecture
�
� |
Alcatel-Lucent
� |
Q12/15, Q9/15
� |
2007-05-25 |
|
[ 609 ]
�
� |
Wording for "Reference source selection mechanism" in G.paclock
�
� |
Semtech
� |
Q13/15
� |
2007-05-25 |
|
[ 608 ]
�
� |
Wording for "Frequency accuracy" in G.paclock
�
� |
Semtech
� |
Q13/15
� |
2007-05-25 |
|
[ 607 ]
�
� |
Managed- FDB APS scheme by selective deletion for Ethernet ring protection
�
� |
ETRI
� |
Q9/15
� |
2007-05-25 |
|
[ 606 ]
�
� |
Notion of alignment in time, phase, and frequency
�
� |
Semtech
� |
Q13/15
� |
2007-05-25 |
|
[ 605 ]
�
� |
Min_TDEV Metric
�
� |
Semtech
� |
Q13/15
� |
2007-05-25 |
|
[ 604 ]
�
� |
Performance of DP-QPSK in 40 Gbit/s Networks
�
� |
Nortel Networks (Europe)
� |
Q6/15
� |
2007-05-25 |
|
[ 603 ]
�
� |
Verifying Differential Methods of TDM Clock Recovery
�
� |
Semtech
� |
Q13/15
� |
2007-05-25 |
|
[ 602 ]
�
� |
G.ploam: G.vdsl: Proposal for updates of the baseline text on INM
�
� |
Infineon
� |
Q4/15
� |
2007-05-25 |
|
[ 601 ]
�
� |
G.vdsl: Comparison of Retransmission and Frame Blanking in REIN
�
� |
Infineon
� |
Q4/15
� |
2007-05-25 |
|
[ 600 ]
�
� |
G.992.3/G.992.5: Proposed accuracy for the absolute error of HLOG and QLN
�
� |
Infineon
� |
Q4/15
� |
2007-05-25 |
|
[ 599 ]
�
� |
G.vdsl, G.ploam: Proposal for SNRM per latency path
�
� |
Infineon
� |
Q4/15
� |
2007-05-25 |
|
[ 598 ]
�
� |
G.hn: On the FEC structure in G.hn
�
� |
Infineon
� |
Q4/15
� |
2007-05-25 |
|
[ 597 ]
�
� |
Proposal for T-MPLS TCS (Traffic Conditioning and Shaping) in G.8110.1
�
� |
Alcatel-Lucent
� |
Q12/15
� |
2007-05-25 |
|
[ 596 ]
�
� |
Support of PDH over T-MPLS (PW adaptation)
�
� |
Alcatel-Lucent
� |
Q13/15, Q12/15, Q11/15, Q9/15
� |
2007-05-25 |
|
[ 595 ]
�
� |
IP/MPLS and T-MPLS Interoperability
�
� |
Alcatel-Lucent
� |
Q14/15, Q12/15
� |
2007-05-25 |
|
[ 594 ]
�
� |
Support of ATM over T-MPLS (PW adaptation)
�
� |
Alcatel-Lucent
� |
Q12/15, Q11/15, Q9/15
� |
2007-05-25 |
|
[ 593 ]
�
� |
Proposals for Current Draft of G.ufatn and Future Work
�
� |
BT
� |
Q12/15
� |
2007-05-25 |
|
[ 592 ]
�
� |
MCC and SCC Options for T-MPLS
�
� |
Alcatel-Lucent
� |
Q12/15, Q14/15
� |
2007-05-25 |
|
[ 591 ]
�
� |
Proposal how to eliminate the SCC/MCC PDU length limitation in G.8114
�
� |
Alcatel-Lucent
� |
Q12/15, Q14/15
� |
2007-05-25 |
|
[ 590 ]
�
� |
Proposal for an Amendment 1 to G.8112
�
� |
Alcatel-Lucent
� |
Q11/15
� |
2007-05-25 |
|
[ 589 ]
�
� |
Textual proposal for APS protocol description G.8132
�
� |
Alcatel-Lucent
� |
Q9/15
� |
2007-05-25 |
|
[ 588 ]
�
� |
G.VDSL2, G.ADSL: Spreading of uncorrectable errors by the Reed-Solomon Interleaver
�
� |
Infineon
� |
Q4/15
� |
2007-05-25 |
|
[ 587 ]
�
� |
G.VDSL2, G.ADSL: A proposal for a new data-continuous interleaver
�
� |
Infineon
� |
Q4/15
� |
2007-05-25 |
|
[ 586 ]
�
� |
(NRZ-)DQPSK as a suitable modulation format for 100+ Gb/s serial transport
�
� |
Alcatel-Lucent Germany
� |
Q6/15
� |
2007-05-25 |
|
[ 585 ]
�
� |
Comments on draft new Amendment 2 to G.7041
�
� |
Alcatel-Lucent
� |
Q14/15, Q11/15, Q9/15
� |
2007-05-25 |
|
[ 584 ]
�
� |
Inconsistencies in G.8021v2
�
� |
ITEK
� |
Q9/15
� |
2007-05-25 |
|
[ 583 ]
�
� |
Computing cost of managed FDB APS scheme in ERP
�
� |
ETRI
� |
Q9/15
� |
2007-05-25 |
|
[ 582 ]
�
� |
Synchronization inputs in G.paclock
�
� |
Semtech
� |
Q13/15
� |
2007-05-25 |
|
[ 581 ]
�
� |
Scope of G.paclock
�
� |
Semtech
� |
Q13/15
� |
2007-05-25 |
|
[ 580 ]
�
� |
Wording for "Scope" in G.paclock
�
� |
Semtech
� |
Q13/15
� |
2007-05-25 |
|
[ 579 ]
�
� |
Proposal to keep SSM transport based upon IEEE802.3ah as an option
�
� |
Tellabs Oy
� |
Q13/15
� |
2007-05-25 |
|
[ 578 ]
�
� |
Addition of "Through Clock" for Synchronous Ethernet
�
� |
Tellabs Oy
� |
Q13/15
� |
2007-05-25 |
|
[ 577 ]
�
� |
Two-Way Protocols Test Cases in Appendix VI/G.8261
�
� |
IL-MOC
� |
Q13/15
� |
2007-05-27 |
|
[ 576 ]
�
� |
A New Appendix for Background Traffic Models Generation Examples
�
� |
IL-MOC
� |
Q13/15
� |
2007-05-27 |
|
[ 575 ]
�
� |
Modification for Test Case 7 of G.8261
�
� |
IL-MOC
� |
Q13/15
� |
2007-05-27 |
|
[ 574 ]
�
� |
Information on alternative modulation formats for revision of sup.39
�
� |
Alcatel-Lucent
� |
Q6/15
� |
2007-05-25 |
|
[ 573 ]
�
� |
Proposal for 43Gb/s application at G.dapp2 considering PSBT (ODB) modulation format for 100GHz and for 50 GHz channel spacing.
�
� |
Alcatel-Lucent
� |
Q6/15
� |
2007-05-25 |
|
[ 572 ]
�
� |
Proposal for revision of G.671 to extend the wavelength range of chromatic dispersion compensating components
�
� |
Alcatel-Lucent
� |
Q7/15
� |
2007-05-25 |
|
[ 571 ]
�
� |
G.paclock document structure
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 570 ]
�
� |
G.paclock - editorial/clarifications
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 569 ]
�
� |
G.paclock - Clause 5.7.4.1 - Phase discontinuity for EEC-Option 1
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 568 ]
�
� |
G.paclock - Clause 5.7.3 - Phase response to input signal interruptions
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 567 ]
�
� |
G.paclock - Figure 14
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 566 ]
�
� |
Synchronous Ethernet - jitter requirements
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 565 ]
�
� |
G.paclock - Clause 5.4.3 Jitter
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
|
[ 564 ]
�
� |
G.paclock - Clause 5.5.2 Jitter Tolerance
�
� |
Zarlink
� |
Q13/15
� |
2007-05-25 |
Resultados :913 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):