Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 58 ]
�
� |
Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)
�
� |
United States
� |
AI1.3
� |
2024-04-18 |
|
[ 57 ]
�
� |
Proposed draft reply liaison statement to Working Party 7C - Relevant technical information for sharing studies under WRC-27 agenda item 1.19
�
� |
United States
� |
AI1.19
� |
2024-04-18 |
|
[ 56 ]
�
� |
Proposed draft reply liaison statement to Working Party 5D - Relevant technical information for sharing studies under WRC-27 agenda item 1.7
�
� |
United States
� |
AI1.7
� |
2024-04-18 |
|
[ 55 ]
�
� |
Potential Handbook outline on best practices for sustainable use of radio frequency spectrum and associated orbits [HANDBOOK SPACE SUSTAINABILITY]
�
� |
United States
� |
� |
2024-04-18 |
|
[ 54 ]
�
� |
Update to Report ITU-R S.2515-0
�
� |
United States
� |
� |
2024-04-18 |
|
[ 53 ]
�
� |
Further work to study the alpha-table methodology and its use in Recommendation ITU-R S.1503
�
� |
United Kingdom
� |
� |
2024-04-17 |
|
[ 52 ]
�
� |
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to enhance protection and sustainable development of broadcasting-satellite service in Regions 1 and 3 Plan band by addressing the significant discrepancies between service area and coverage area of networks operating as Region 2 fixed-satellite service in the frequency band 11.7-12.2 GHz
�
� |
Iran (Islamic Republic of)
� |
AI7
� |
2024-04-17 |
|
[ 51 ]
�
� |
Proposed input on elements of the reply liaison statement to Working Party 7D on WRC-27 agenda item 1.16
�
� |
South Africa
� |
AI1.16
� |
2024-04-17 |
|
[ 50 ]
�
� |
Proposed structure for the draft Report on RR Article 22 epfd limits
�
� |
Luxembourg
� |
� |
2024-04-17 |
|
[ 49 ]
�
� |
Proposed liaison statement and Working Party 4A workplan regarding WRC-27 agenda item 1.1
�
� |
Luxembourg
� |
AI1.1
� |
2024-04-17 |
|
[ 48 ]
�
� |
Proposed parameters regarding ESIMs to be used for studies under WRC-27 agenda item 1.1
�
� |
Luxembourg
� |
AI1.1
� |
2024-04-17 |
|
[ 47 ]
�
� |
Comparison of current GSO links in Ku band with links used for the epfd derivation
�
� |
Luxembourg
� |
� |
2024-04-17 |
|
[ 46 ]
�
� |
Proposed annex to working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO]
�
� |
China
� |
� |
2024-04-17 |
|
[ 45 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO]
�
� |
China
� |
� |
2024-04-17 |
|
[ 44 ]
�
� |
Proposed studies on Resolution 35 (Rev.WRC-23)
�
� |
China
� |
� |
2024-04-17 |
|
[ 43 ]
�
� |
Proposed topic to be considered under WRC-23 agenda item 7 to develop possible regulatory measures to implement RR No. 4.4
�
� |
China
� |
AI7
� |
2024-04-17 |
|
[ 42 ]
�
� |
A proposed questionnaire on the current status and future plan of FSS satellite networks/systems in the Q/V band for WRC-27 agenda item 1.6
�
� |
China
� |
AI1.6
� |
2024-04-17 |
|
[ 41 ]
�
� |
Consideration on the preparations for WRC-27 agenda item 1.5
�
� |
China
� |
AI1.5
� |
2024-04-17 |
|
[ 40 ]
�
� |
Proposal on working document towards a preliminary draft new Report ITU-R S.[SHARING AND COMPATIBILITY STUDIES ON FSS/BSS IN 17.3-17.7/17.8 GHZ FOR R3] - WRC-27 agenda item 1.4
�
� |
China
� |
AI1.4
� |
2024-04-17 |
|
[ 39 ]
�
(Rev.1)� |
Considerations on preparations for WRC-27 agenda item 1.3
�
� |
China
� |
AI1.3
� |
2024-04-17 |
|
[ 38 ]
�
� |
Proposal on the studies under WRC-27 agenda item 1.2
�
� |
China
� |
AI1.2
� |
2024-04-17 |
|
[ 37 ]
�
� |
Proposed draft liaison statements to contributing Working Parties regarding WRC-27 agenda item 1.1
�
� |
China
� |
AI1.1
� |
2024-04-17 |
|
[ 36 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[STUDIES OF ARTICLE 22 MECHANISM]
�
� |
Burundi
,
Cameroon
,
Chad
,
Congo (Republic of the)
,
Democratic Republic of the Congo
,
Gabon
,
Guinea
,
Sao Tome and Principe
� |
� |
2024-04-17 |
|
[ 35 ]
�
� |
Medium Earth orbit earth station parameters for studies to be conducted under WRC-27 agenda item 1.3
�
� |
SES
� |
AI1.3
� |
2024-04-16 |
|
[ 34 ]
�
� |
Amendments to working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO] - Methodology to assess the average throughput degradation and unavailability increase between non-geostationary FSS satellite system
�
� |
Samoa
� |
� |
2024-04-12 |
|
[ 33 ]
�
� |
Workplan for WRC-27 agenda item 1.1
�
� |
Germany
� |
AI1.1
� |
2024-04-12 |
|
[ 32 ]
�
� |
Proposed Working document on WRC-27 agenda item 1.1
�
� |
Germany
� |
AI1.1
� |
2024-04-12 |
|
[ 31 ]
�
� |
Proposed liaison statement to contributing Working Parties of WRC-27 agenda item 1.1
�
� |
Germany
� |
AI1.1
� |
2024-04-12 |
|
[ 30 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-4 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations
�
� |
Russian Federation
� |
� |
2024-04-11 |
|
[ 29 ]
�
� |
Preliminary materials to support the study under WRC-27 agenda item 1.5
�
� |
Kazakhstan
,
Russian Federation
� |
AI1.5
� |
2024-04-11 |
|
[ 28 ]
�
� |
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to restrain the use of the same satellite or different satellites to repeatedly bring into use and bring back into use the same frequency assignments of a satellite network or system for a short period of time
�
� |
Korea (Rep. of)
� |
AI7
� |
2024-04-11 |
|
[ 27 ]
�
� |
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to limit the practice of introducing a completely different orbital plane for non-geostationary-satellite systems that is not foreseen to be required for operation of the constellation
�
� |
Korea (Rep. of)
� |
AI7
� |
2024-04-11 |
|
[ 26 ]
�
� |
Working document towards a preliminary draft revision to Report ITU-R BO.2029
�
� |
Japan
� |
� |
2024-04-09 |
|
[ 25 ]
�
� |
Provisions to be possibly reviewed under WRC-27 agenda item 1.4
�
� |
Japan
� |
AI1.4
� |
2024-04-10 |
|
[ 24 ]
�
� |
Liaison statement to Working Parties 4A and 4C (copy to Working Parties 3J, 3M, 5A, 5B, and 5C for information) - WRC-27 agenda item 1.18
�
� |
WP 7D
� |
AI1.18
� |
2024-03-28 |
|
[ 23 ]
�
� |
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 1B, 4A, 4C, 5A, 5B, and 5D for information) on WRC-27 agenda items 1.16 and 1.18
�
� |
WP 7D
� |
AI1.18, AI1.16
� |
2024-03-28 |
|
[ 22 ]
�
� |
Liaison statement to Working Parties 4A, 4C and 5A (copy to Working Parties 1B, 3J, 3M, 5B and 5D for information) - WRC-27 agenda item 1.16
�
� |
WP 7D
� |
AI1.16
� |
2024-03-28 |
|
[ 21 ]
�
� |
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15
�
� |
WP 7B
� |
AI1.15
� |
2024-03-27 |
|
[ 20 ]
�
� |
Liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7
�
� |
WP 7B
� |
AI1.7
� |
2024-03-27 |
|
[ 19 ]
�
� |
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Information on active and passive sensors in the EESS for WRC-27 agenda item 1.8
�
� |
WP 7C
� |
AI1.8
� |
2024-03-26 |
|
[ 18 ]
�
� |
Liaison statement to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.17
�
� |
WP 7C
� |
AI1.17
� |
2024-03-25 |
|
[ 17 ]
�
� |
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 5C, 5D, 7A and 7B (copy to ICAO for information) - WRC-27 agenda item 1.19
�
� |
WP 7C
� |
AI1.19
� |
2024-03-25 |
|
[ 16 ]
�
� |
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7D for information) - WRC-27 agenda item 1.7
�
� |
WP 7C
� |
AI1.7
� |
2024-03-25 |
|
[ 15 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5B, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18
�
� |
WP 7C
� |
AI1.18
� |
2024-03-25 |
|
[ 14 ]
�
� |
Liaison statement to Working Parties 3J, 3M (copy to Working Parties 4A, 4C, 5A, 5B and 5C) - Propagation aspects related to WRC-27 agenda item 1.18
�
� |
WP 7C
� |
AI1.18
� |
2024-03-25 |
|
[ 13 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B (copy to Working Parties 5C, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18
�
� |
WP 7C
� |
AI1.18
� |
2024-03-25 |
|
[ 12 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C and 7D for information) - WRC-27 agenda item 1.3
�
� |
WP 7C
� |
AI1.3
� |
2024-03-25 |
|
[ 11 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D for information) - WRC-27 agenda item 1.1
�
� |
WP 7C
� |
AI1.1
� |
2024-03-25 |
|
[ 10 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6
�
� |
WP 6A
� |
AI1.6
� |
2024-03-18 |
|
[ 9 ]
�
� |
Liaison statement to Working Party 5C (copy to Working Parties 1A, 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D for information) - WRC-27 agenda item 1.10
�
� |
WP 6A
� |
AI1.10
� |
2024-03-18 |
Resultados :358 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):