International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 15 : Meeting�2013-07-01�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 15� C�(2013-07-01)�

ITU-T�SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting� from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-192016-02-152015-06-222014-11-242014-03-242013-12-062013-02-01

Results:440 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 140 ]
Probe Sequence Modulation and Error Signal Feedback � Huawei Technologies Co. Ltd. Q4/15 2013-06-16
[ 139 ]
On PSD Control in Vectoring � Huawei Technologies Co. Ltd. Q4/15 2013-06-16
[ 138 ]
Asynchronous OLR for PSD Control � Huawei Technologies Co. Ltd. Q4/15 2013-06-16
[ 137 ]
Updated PtP WDM channel plan � ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG Q2/15 2013-06-16
[ 136 ]
Figure update for Appendix VI � ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG Q2/15 2013-06-16
[ 135 ]
Raman OPP for PtP WDM � ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG Q2/15 2013-06-16
[ 134 ]
PMD values for PtP WDM � ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG Q2/15 2013-06-16
[ 133 ]
Eye mask parameters for PtP WDM � ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG Q2/15 2013-06-16
[ 132 ]
G.bond: Shutting down some lines in a bonded group � AT&T, Inc. Q4/15 2013-06-15
[ 131 ]
Full capacity in NG-PON2 using line coding � Futurewei Technologies US R&D Center Q2/15 2013-06-15
[ 130 ]
Proposal to study AWG based WDM PON proposal in mobile front-haul application � Futurewei Technologies US R&D Center Q2/15 2013-06-15
[ 129 ]
On the editorial placement of NG-PON2 (TWDM) TC-layer specifications � Alcatel-Lucent USA Inc. , Futurewei Technologies US R&D Center Q2/15 2013-06-15
[ 128 ]
On the concept of out-of-band ranging in TWDM PONs � Futurewei Technologies US R&D Center Q2/15 2013-06-15
[ 127 ]
Impacts of line code change on G.989.2 � Futurewei Technologies US R&D Center Q2/15 2013-06-15
[ 126 ]
Proposed approach for work on OTN beyond 100G � ZTE Corporation Q6/15, Q14/15, Q12/15, Q11/15 2013-06-15
[ 125 ]
Proposed model for the OTUCn and OCh layer for OTN beyond 100G � China Telecommunications Corporation , China Unicom , ZTE Corporation Q6/15, Q14/15, Q12/15, Q11/15 2013-06-15
[ 124 ]
G.8275.1: Title � SymmetriCom, Inc. Q13/15 2013-06-15
[ 123 ]
G.8275.1: Default Parameter Values � SymmetriCom, Inc. Q13/15 2013-06-15
[ 122 ]
G.8272: Revisions to Appendix 1 to include the case of a combined PRTC/T-GM � SymmetriCom, Inc. Q13/15 2013-06-15
[ 121 ]
G.8263: Modification to Proposed Testing Appendix � SymmetriCom, Inc. Q13/15 2013-06-15
[ 120 ]
G.8260: The Use of Exceptions for Network Limits using FPP � SymmetriCom, Inc. Q13/15 2013-06-15
[ 119 ]
Percentile Average Clarification in G.8260 � SymmetriCom, Inc. Q13/15 2013-06-15
[ 118 ]
FPP and Percentile of Live Network PDV � SymmetriCom, Inc. Q13/15 2013-06-15
[ 117 ]
G.poc draft proposal � Futurewei Technologies US R&D Center Q2/15 2013-06-15
[ 116 ]
Proposal to replace NG-PON2 channel plan in Appendix VII of G.989.2 draft � ADVA Optical Networking , Futurewei Technologies US R&D Center , Gemfire Europe Limited Q2/15 2013-06-15
[ 115 ]
Multiple rate TC extension for TWDM � Futurewei Technologies US R&D Center Q2/15 2013-06-15
[ 114 ]
OFS Proposal for revisions to 657 � OFS Fitel, LLC Q5/15 2013-06-14
[ 113 ]
OFS Proposal for revisions to 652.D � OFS Fitel, LLC Q5/15 2013-06-14
[ 112 ]
(Rev.1)
OFS Proposal for a new G.654 Category � OFS Fitel, LLC Q5/15 2013-06-14
[ 111 ]
Criteria for evaluating ODU SMP protocol proposals � Tellabs Oy Q9/15 2013-06-14
[ 110 ]
OTN Sec : Security for OTN beyond 100 Gbit/s � Applied Micro Circuits Corporation (AMCC) Q11/15 2013-06-14
[ 109 ]
G.975.1 Appendix I.4 corrections � Applied Micro Circuits Corporation (AMCC) Q8/15 2013-06-14
[ 108 ]
G.fast: SOS-like Scheme as Fast OLR � Futurewei Technologies US R&D Center Q4/15 2013-06-14
[ 107 ]
G.fast: Transmitter Initiated Gain and Bit-Loading Adjustment � Futurewei Technologies US R&D Center Q4/15 2013-06-14
[ 106 ]
G.fast: Configuration of Gap Time Parameter Tg2 � Futurewei Technologies US R&D Center Q4/15 2013-06-14
[ 105 ]
G.vdsl: Low Power Mode proposal and working text � TQ DELTA. LLC Q4/15 2013-06-14
[ 104 ]
(Rev.1)
G.vector, G.hs: Potential Ghost Start Issue in G.vector � Ikanos Communications Q4/15 2013-06-14
[ 103 ]
Proposed Revisions to the Current G.mdsp Draft � Fujitsu Network Communications, Inc. Q9/15 2013-06-14
[ 102 ]
G.fast: Maximum aggregate transmit power � Deutsche Telekom AG , Swisscom SA Q4/15 2013-06-14
[ 101 ]
G.metro scope proposal � ADVA Optical Networking , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG , Italy , Nokia Siemens Networks GmbH & Co. KG , Telefon AB - LM Ericsson Q6/15 2013-06-14
[ 100 ]
G.hn: Backup security controller mechanism � Huawei Technologies Co. Ltd. Q18/15 2013-06-14
[ 99 ]
G.hn: Improving the existing domain merging procedure � Huawei Technologies Co. Ltd. Q18/15 2013-06-14
[ 98 ]
Considerations on flexible ODU and OTU overhead [SP7] � Fujitsu Limited Q11/15 2013-06-14
[ 97 ]
Comparisons between single and multi OTUCm/OCh signal approaches [SP4, SP5] � Fujitsu Limited Q11/15 2013-06-14
[ 96 ]
Considerations on B100G OTN multiplexing hierarchy [SP23] � Fujitsu Limited Q11/15 2013-06-14
[ 95 ]
(Rev.1)
Consideration on B100G OTN multiplexing � Fujitsu Limited Q11/15 2013-06-14
[ 94 ]
Comments and proposal on the restructuring of G.652 & G.657 categories � Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT) Q5/15 2013-06-14
[ 93 ]
Consideration on 400GE signal transmission over B100G OTN � Fujitsu Limited Q11/15 2013-06-14
[ 92 ]
Proposal for starting the procedure of the new Recommendation about micro-ducts technology and its application in the access network. � Italy Q16/15 2013-06-14
[ 91 ]
Beginning Of Life ("BOL") versus End-Of-Life ("EOL") approach in the specification of passive optical components. � Italy Q7/15, Q2/15, Q16/15 2013-06-14
Results:440 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-26