Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 140 ]
�
� |
Probe Sequence Modulation and Error Signal Feedback
�
� |
Huawei Technologies Co. Ltd.
� |
Q4/15
� |
2013-06-16 |
|
[ 139 ]
�
� |
On PSD Control in Vectoring
�
� |
Huawei Technologies Co. Ltd.
� |
Q4/15
� |
2013-06-16 |
|
[ 138 ]
�
� |
Asynchronous OLR for PSD Control
�
� |
Huawei Technologies Co. Ltd.
� |
Q4/15
� |
2013-06-16 |
|
[ 137 ]
�
� |
Updated PtP WDM channel plan
�
� |
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q2/15
� |
2013-06-16 |
|
[ 136 ]
�
� |
Figure update for Appendix VI
�
� |
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q2/15
� |
2013-06-16 |
|
[ 135 ]
�
� |
Raman OPP for PtP WDM
�
� |
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q2/15
� |
2013-06-16 |
|
[ 134 ]
�
� |
PMD values for PtP WDM
�
� |
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q2/15
� |
2013-06-16 |
|
[ 133 ]
�
� |
Eye mask parameters for PtP WDM
�
� |
ADVA Optical Networking
,
Nokia Siemens Networks GmbH & Co. KG
� |
Q2/15
� |
2013-06-16 |
|
[ 132 ]
�
� |
G.bond: Shutting down some lines in a bonded group
�
� |
AT&T, Inc.
� |
Q4/15
� |
2013-06-15 |
|
[ 131 ]
�
� |
Full capacity in NG-PON2 using line coding
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2013-06-15 |
|
[ 130 ]
�
� |
Proposal to study AWG based WDM PON proposal in mobile front-haul application
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2013-06-15 |
|
[ 129 ]
�
� |
On the editorial placement of NG-PON2 (TWDM) TC-layer specifications
�
� |
Alcatel-Lucent USA Inc.
,
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2013-06-15 |
|
[ 128 ]
�
� |
On the concept of out-of-band ranging in TWDM PONs
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2013-06-15 |
|
[ 127 ]
�
� |
Impacts of line code change on G.989.2
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2013-06-15 |
|
[ 126 ]
�
� |
Proposed approach for work on OTN beyond 100G
�
� |
ZTE Corporation
� |
Q6/15, Q14/15, Q12/15, Q11/15
� |
2013-06-15 |
|
[ 125 ]
�
� |
Proposed model for the OTUCn and OCh layer for OTN beyond 100G
�
� |
China Telecommunications Corporation
,
China Unicom
,
ZTE Corporation
� |
Q6/15, Q14/15, Q12/15, Q11/15
� |
2013-06-15 |
|
[ 124 ]
�
� |
G.8275.1: Title
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2013-06-15 |
|
[ 123 ]
�
� |
G.8275.1: Default Parameter Values
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2013-06-15 |
|
[ 122 ]
�
� |
G.8272: Revisions to Appendix 1 to include the case of a combined PRTC/T-GM
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2013-06-15 |
|
[ 121 ]
�
� |
G.8263: Modification to Proposed Testing Appendix
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2013-06-15 |
|
[ 120 ]
�
� |
G.8260: The Use of Exceptions for Network Limits using FPP
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2013-06-15 |
|
[ 119 ]
�
� |
Percentile Average Clarification in G.8260
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2013-06-15 |
|
[ 118 ]
�
� |
FPP and Percentile of Live Network PDV
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2013-06-15 |
|
[ 117 ]
�
� |
G.poc draft proposal
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2013-06-15 |
|
[ 116 ]
�
� |
Proposal to replace NG-PON2 channel plan in Appendix VII of G.989.2 draft
�
� |
ADVA Optical Networking
,
Futurewei Technologies US R&D Center
,
Gemfire Europe Limited
� |
Q2/15
� |
2013-06-15 |
|
[ 115 ]
�
� |
Multiple rate TC extension for TWDM
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2013-06-15 |
|
[ 114 ]
�
� |
OFS Proposal for revisions to 657
�
� |
OFS Fitel, LLC
� |
Q5/15
� |
2013-06-14 |
|
[ 113 ]
�
� |
OFS Proposal for revisions to 652.D
�
� |
OFS Fitel, LLC
� |
Q5/15
� |
2013-06-14 |
|
[ 112 ]
�
(Rev.1)� |
OFS Proposal for a new G.654 Category
�
� |
OFS Fitel, LLC
� |
Q5/15
� |
2013-06-14 |
|
[ 111 ]
�
� |
Criteria for evaluating ODU SMP protocol proposals
�
� |
Tellabs Oy
� |
Q9/15
� |
2013-06-14 |
|
[ 110 ]
�
� |
OTN Sec : Security for OTN beyond 100 Gbit/s
�
� |
Applied Micro Circuits Corporation (AMCC)
� |
Q11/15
� |
2013-06-14 |
|
[ 109 ]
�
� |
G.975.1 Appendix I.4 corrections
�
� |
Applied Micro Circuits Corporation (AMCC)
� |
Q8/15
� |
2013-06-14 |
|
[ 108 ]
�
� |
G.fast: SOS-like Scheme as Fast OLR
�
� |
Futurewei Technologies US R&D Center
� |
Q4/15
� |
2013-06-14 |
|
[ 107 ]
�
� |
G.fast: Transmitter Initiated Gain and Bit-Loading Adjustment
�
� |
Futurewei Technologies US R&D Center
� |
Q4/15
� |
2013-06-14 |
|
[ 106 ]
�
� |
G.fast: Configuration of Gap Time Parameter Tg2
�
� |
Futurewei Technologies US R&D Center
� |
Q4/15
� |
2013-06-14 |
|
[ 105 ]
�
� |
G.vdsl: Low Power Mode proposal and working text
�
� |
TQ DELTA. LLC
� |
Q4/15
� |
2013-06-14 |
|
[ 104 ]
�
(Rev.1)� |
G.vector, G.hs: Potential Ghost Start Issue in G.vector
�
� |
Ikanos Communications
� |
Q4/15
� |
2013-06-14 |
|
[ 103 ]
�
� |
Proposed Revisions to the Current G.mdsp Draft
�
� |
Fujitsu Network Communications, Inc.
� |
Q9/15
� |
2013-06-14 |
|
[ 102 ]
�
� |
G.fast: Maximum aggregate transmit power
�
� |
Deutsche Telekom AG
,
Swisscom SA
� |
Q4/15
� |
2013-06-14 |
|
[ 101 ]
�
� |
G.metro scope proposal
�
� |
ADVA Optical Networking
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
,
Italy
,
Nokia Siemens Networks GmbH & Co. KG
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2013-06-14 |
|
[ 100 ]
�
� |
G.hn: Backup security controller mechanism
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/15
� |
2013-06-14 |
|
[ 99 ]
�
� |
G.hn: Improving the existing domain merging procedure
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/15
� |
2013-06-14 |
|
[ 98 ]
�
� |
Considerations on flexible ODU and OTU overhead [SP7]
�
� |
Fujitsu Limited
� |
Q11/15
� |
2013-06-14 |
|
[ 97 ]
�
� |
Comparisons between single and multi OTUCm/OCh signal approaches [SP4, SP5]
�
� |
Fujitsu Limited
� |
Q11/15
� |
2013-06-14 |
|
[ 96 ]
�
� |
Considerations on B100G OTN multiplexing hierarchy [SP23]
�
� |
Fujitsu Limited
� |
Q11/15
� |
2013-06-14 |
|
[ 95 ]
�
(Rev.1)� |
Consideration on B100G OTN multiplexing
�
� |
Fujitsu Limited
� |
Q11/15
� |
2013-06-14 |
|
[ 94 ]
�
� |
Comments and proposal on the restructuring of G.652 & G.657 categories
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q5/15
� |
2013-06-14 |
|
[ 93 ]
�
� |
Consideration on 400GE signal transmission over B100G OTN
�
� |
Fujitsu Limited
� |
Q11/15
� |
2013-06-14 |
|
[ 92 ]
�
� |
Proposal for starting the procedure of the new Recommendation about micro-ducts technology and its application in the access network.
�
� |
Italy
� |
Q16/15
� |
2013-06-14 |
|
[ 91 ]
�
� |
Beginning Of Life ("BOL") versus End-Of-Life ("EOL") approach in the specification of passive optical components.
�
� |
Italy
� |
Q7/15, Q2/15, Q16/15
� |
2013-06-14 |
Results:440 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):