Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2090 ]
�
� |
G.hn: Clarification on FACK
�
� |
Marvell Semiconductor Inc.
� |
Q4B/15
� |
2012-08-25 |
|
[ 2089 ]
�
� |
G.hn: Proposal for Extended ACK implementation
�
� |
Marvell Semiconductor Inc.
� |
Q4B/15
� |
2012-08-25 |
|
[ 2088 ]
�
� |
G.fast: Proposed Definitions for G.fast PMD
�
� |
Ikanos Communications
� |
Q4A/15
� |
2012-08-25 |
|
[ 2087 ]
�
� |
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
�
� |
PMC-Sierra, Inc.
� |
Q9/15, Q14/15, Q13/15, Q11/15
� |
2012-08-25 |
|
[ 2086 ]
�
� |
Proposed clarification for the CSF start time in G.7041
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2012-08-25 |
|
[ 2085 ]
�
� |
Proposal to allow a modified GFP frame alignment algorithm for high-speed interfaces
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2012-08-25 |
|
[ 2084 ]
�
� |
Testing Packet Clocks (re. G.8263) - Part 2
�
� |
Anue Systems
� |
Q13/15
� |
2012-08-25 |
|
[ 2083 ]
�
� |
Normal operation of telecom-grade network elements for supporting packet-based timing
�
� |
Anue Systems
� |
Q13/15
� |
2012-08-25 |
|
[ 2082 ]
�
� |
Packet Timing Monitor - Definition
�
� |
Anue Systems
� |
Q13/15
� |
2012-08-25 |
|
[ 2081 ]
�
� |
Annex for G.8273 discussing performance parameters for PTP clocks
�
� |
Anue Systems
� |
Q13/15
� |
2012-08-25 |
|
[ 2080 ]
�
� |
Organization of T-BC performance requirements
�
� |
Anue Systems
� |
Q13/15
� |
2012-08-25 |
|
[ 2079 ]
�
� |
Time Error of PTP master ports
�
� |
Anue Systems
� |
Q13/15
� |
2012-08-24 |
|
[ 2078 ]
�
� |
Time error accumulation in chains of phase/time clocks
�
� |
Anue Systems
� |
Q13/15
� |
2012-08-24 |
|
[ 2077 ]
�
� |
Estimating constant time error and related measurement methods for phase/time clocks
�
� |
Anue Systems
� |
Q13/15
� |
2012-08-24 |
|
[ 2076 ]
�
� |
Requirements for fibres used in next generation submarine systems and new recommended text for G.654
�
� |
OFS Fitel, LLC
� |
Q5/15
� |
2012-08-24 |
|
[ 2075 ]
�
� |
G.8260: Definition of Partial On-path Support
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2012-08-24 |
|
[ 2074 ]
�
� |
Starting point for the development of a new PTP profile for time and phase distribution over existing deployed networks
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2012-08-24 |
|
[ 2073 ]
�
� |
G.8272: Phase/Time Holdover Capability for a PRTC
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2012-08-24 |
|
[ 2072 ]
�
� |
Update to G.8021 for retrieval of on-demand intermediate measurements
�
� |
Alcatel-Lucent Italia S.p.A.
,
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2012-08-24 |
|
[ 2071 ]
�
� |
G.adsl: Stable Sleep Mode Optimization for Energy Efficient DSL: Proposal
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
� |
Q4A/15
� |
2012-08-24 |
|
[ 2070 ]
�
� |
G.smp Objectives
�
� |
Alcatel-Lucent USA Inc.
,
Huawei Technologies Co. Ltd.
,
Infinera Corporation
� |
Q9/15
� |
2012-08-24 |
|
[ 2069 ]
�
� |
G.8272: Performance conditions for the PRTC
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2012-08-24 |
|
[ 2068 ]
�
� |
G.8265.1: Value of the PTP "Renewal Invited" flag
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2012-08-24 |
|
[ 2067 ]
�
� |
G.8265.1: Value of the PTP clockAccuracy Field
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2012-08-24 |
|
[ 2066 ]
�
� |
G.adsl: Stable Sleep Mode Optimization for Energy Efficient DSL
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
� |
Q4A/15
� |
2012-08-24 |
|
[ 2065 ]
�
� |
Proposed Input for G.smp Summary Clause re Capacity Efficiency
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2012-08-24 |
|
[ 2064 ]
�
(Rev.1)� |
G.vdsl: Proposed Accuracy Target for LATN and SATN
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
� |
Q4A/15
� |
2012-08-24 |
|
[ 2063 ]
�
(Rev.1)� |
G.8263: PDV Noise Tolerance Testing for the PEC-S-F
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2012-08-24 |
|
[ 2062 ]
�
� |
Mapping of 16G Fibre-Channel into OTN
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2012-08-24 |
|
[ 2061 ]
�
(Rev.1-2)� |
Proposed Input for G.smp Summary Clause re Mesh Topology Definition
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2012-08-24 |
|
[ 2060 ]
�
� |
G.8263: PDV Distribution for Noise Tolerance of Packet Slave Clocks
�
� |
SymmetriCom, Inc.
� |
Q13/15
� |
2012-08-24 |
|
[ 2059 ]
�
(Rev.1)� |
G.ploam: Parameters for Data Gathering Messaging
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
� |
Q4A/15
� |
2012-08-24 |
|
[ 2058 ]
�
� |
Misalignment among G.709, G.798 and G.872
�
� |
Ciena Corporation
� |
Q9/15, Q12/15, Q11/15
� |
2012-08-24 |
|
[ 2057 ]
�
� |
G.vdsl: Proposed text for Data Gathering Messaging
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
� |
Q4A/15
� |
2012-08-24 |
|
[ 2056 ]
�
� |
Generic considerations for protection resource assignments in G.smp
�
� |
Alcatel-Lucent USA Inc.
,
Ciena Corporation
� |
Q9/15
� |
2012-08-24 |
|
[ 2055 ]
�
� |
Distributed G.8031 proposal
�
� |
Fujitsu Network Communications, Inc.
� |
Q9/15
� |
2012-08-24 |
|
[ 2054 ]
�
� |
Requirements of Control Plane/Management Plane to support SMP
�
� |
Ciena Corporation
� |
Q9/15
� |
2012-08-24 |
|
[ 2053 ]
�
(Rev.1)� |
Development of a new PTP Profile for Time/Phase Distribution
�
� |
AT&T, Inc.
,
Sprint
,
SymmetriCom, Inc.
,
Verizon Communication Corporation
� |
Q13/15
� |
2012-08-24 |
|
[ 2052 ]
�
� |
Protection Interworking editorial comments
�
� |
Fujitsu Network Communications, Inc.
� |
Q9/15
� |
2012-08-24 |
|
[ 2051 ]
�
� |
Bi-directional SMP Operation and Signalling Flow Sequence
�
� |
Ciena Corporation
� |
Q9/15
� |
2012-08-24 |
|
[ 2050 ]
�
(Rev.1)� |
Proposal for determined text G.9955 Annex A - Amd1 - Padding of MAC frame
�
� |
ERDF
� |
Q4C/15
� |
2012-08-24 |
|
[ 2049 ]
�
� |
Comments and clarifications on G.smp
�
� |
Ciena Corporation
� |
Q9/15
� |
2012-08-24 |
|
[ 2048 ]
�
� |
G.odusmp Support of Both ODUj and ODUk Restoration
�
� |
Fujitsu Network Communications, Inc.
� |
Q9/15
� |
2012-08-24 |
|
[ 2047 ]
�
� |
Use of CL-SNCG/S to simplify G.873.2 configurations
�
� |
Ciena Corporation
� |
Q9/15
� |
2012-08-24 |
|
[ 2046 ]
�
� |
Not used
�
Withdrawn by submitter
� |
N/A
� |
Q9/15
� |
2012-08-24 |
|
[ 2045 ]
�
� |
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
�
� |
AT&T, Inc.
,
Ciena Corporation
� |
Q9/15, Q14/15, Q13/15, Q11/15
� |
2012-08-24 |
|
[ 2044 ]
�
� |
G.odusmp with TCM APS
�
� |
Fujitsu Network Communications, Inc.
� |
Q9/15
� |
2012-08-24 |
|
[ 2043 ]
�
� |
Alternative to legacy interfaces for connecting PRTC to T-GM
�
� |
Cisco Systems, Inc.
� |
Q13/15
� |
2012-08-24 |
|
[ 2042 ]
�
� |
G.8272: PRTC Support of SyncE and ESMC
�
� |
Cisco Systems, Inc.
� |
Q13/15
� |
2012-08-24 |
|
[ 2041 ]
�
� |
G.smp multiple failure protection pre-emption
�
� |
Fujitsu Network Communications, Inc.
� |
Q9/15
� |
2012-08-24 |
Results:452 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):