International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG15 : Meeting�2012-09-10�: Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG15� C�(2012-09-10)�

ITU-T�SG15

Transport network structures

Study Period 2009

Meeting� from 2012-09-10 to 2012-09-21

held in Switzerland [Geneva]

Other Meetings : 2012-05-112011-12-052011-09-162011-02-142010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Results:452 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 2090 ]
G.hn: Clarification on FACK � Marvell Semiconductor Inc. Q4B/15 2012-08-25
[ 2089 ]
G.hn: Proposal for Extended ACK implementation � Marvell Semiconductor Inc. Q4B/15 2012-08-25
[ 2088 ]
G.fast: Proposed Definitions for G.fast PMD � Ikanos Communications Q4A/15 2012-08-25
[ 2087 ]
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes � PMC-Sierra, Inc. Q9/15, Q14/15, Q13/15, Q11/15 2012-08-25
[ 2086 ]
Proposed clarification for the CSF start time in G.7041 � PMC-Sierra, Inc. Q11/15 2012-08-25
[ 2085 ]
Proposal to allow a modified GFP frame alignment algorithm for high-speed interfaces � PMC-Sierra, Inc. Q11/15 2012-08-25
[ 2084 ]
Testing Packet Clocks (re. G.8263) - Part 2 � Anue Systems Q13/15 2012-08-25
[ 2083 ]
Normal operation of telecom-grade network elements for supporting packet-based timing � Anue Systems Q13/15 2012-08-25
[ 2082 ]
Packet Timing Monitor - Definition � Anue Systems Q13/15 2012-08-25
[ 2081 ]
Annex for G.8273 discussing performance parameters for PTP clocks � Anue Systems Q13/15 2012-08-25
[ 2080 ]
Organization of T-BC performance requirements � Anue Systems Q13/15 2012-08-25
[ 2079 ]
Time Error of PTP master ports � Anue Systems Q13/15 2012-08-24
[ 2078 ]
Time error accumulation in chains of phase/time clocks � Anue Systems Q13/15 2012-08-24
[ 2077 ]
Estimating constant time error and related measurement methods for phase/time clocks � Anue Systems Q13/15 2012-08-24
[ 2076 ]
Requirements for fibres used in next generation submarine systems and new recommended text for G.654 � OFS Fitel, LLC Q5/15 2012-08-24
[ 2075 ]
G.8260: Definition of Partial On-path Support � SymmetriCom, Inc. Q13/15 2012-08-24
[ 2074 ]
Starting point for the development of a new PTP profile for time and phase distribution over existing deployed networks � SymmetriCom, Inc. Q13/15 2012-08-24
[ 2073 ]
G.8272: Phase/Time Holdover Capability for a PRTC � SymmetriCom, Inc. Q13/15 2012-08-24
[ 2072 ]
Update to G.8021 for retrieval of on-demand intermediate measurements � Alcatel-Lucent Italia S.p.A. , Alcatel-Lucent USA Inc. Q9/15 2012-08-24
[ 2071 ]
G.adsl: Stable Sleep Mode Optimization for Energy Efficient DSL: Proposal � Adaptive Spectrum and Signal Alignment (ASSIA) Inc. Q4A/15 2012-08-24
[ 2070 ]
G.smp Objectives � Alcatel-Lucent USA Inc. , Huawei Technologies Co. Ltd. , Infinera Corporation Q9/15 2012-08-24
[ 2069 ]
G.8272: Performance conditions for the PRTC � SymmetriCom, Inc. Q13/15 2012-08-24
[ 2068 ]
G.8265.1: Value of the PTP "Renewal Invited" flag � SymmetriCom, Inc. Q13/15 2012-08-24
[ 2067 ]
G.8265.1: Value of the PTP clockAccuracy Field � SymmetriCom, Inc. Q13/15 2012-08-24
[ 2066 ]
G.adsl: Stable Sleep Mode Optimization for Energy Efficient DSL � Adaptive Spectrum and Signal Alignment (ASSIA) Inc. Q4A/15 2012-08-24
[ 2065 ]
Proposed Input for G.smp Summary Clause re Capacity Efficiency � Alcatel-Lucent USA Inc. Q9/15 2012-08-24
[ 2064 ]
(Rev.1)
G.vdsl: Proposed Accuracy Target for LATN and SATN � Adaptive Spectrum and Signal Alignment (ASSIA) Inc. Q4A/15 2012-08-24
[ 2063 ]
(Rev.1)
G.8263: PDV Noise Tolerance Testing for the PEC-S-F � SymmetriCom, Inc. Q13/15 2012-08-24
[ 2062 ]
Mapping of 16G Fibre-Channel into OTN � Alcatel-Lucent USA Inc. Q11/15 2012-08-24
[ 2061 ]
(Rev.1-2)
Proposed Input for G.smp Summary Clause re Mesh Topology Definition � Alcatel-Lucent USA Inc. Q9/15 2012-08-24
[ 2060 ]
G.8263: PDV Distribution for Noise Tolerance of Packet Slave Clocks � SymmetriCom, Inc. Q13/15 2012-08-24
[ 2059 ]
(Rev.1)
G.ploam: Parameters for Data Gathering Messaging � Adaptive Spectrum and Signal Alignment (ASSIA) Inc. Q4A/15 2012-08-24
[ 2058 ]
Misalignment among G.709, G.798 and G.872 � Ciena Corporation Q9/15, Q12/15, Q11/15 2012-08-24
[ 2057 ]
G.vdsl: Proposed text for Data Gathering Messaging � Adaptive Spectrum and Signal Alignment (ASSIA) Inc. Q4A/15 2012-08-24
[ 2056 ]
Generic considerations for protection resource assignments in G.smp � Alcatel-Lucent USA Inc. , Ciena Corporation Q9/15 2012-08-24
[ 2055 ]
Distributed G.8031 proposal � Fujitsu Network Communications, Inc. Q9/15 2012-08-24
[ 2054 ]
Requirements of Control Plane/Management Plane to support SMP � Ciena Corporation Q9/15 2012-08-24
[ 2053 ]
(Rev.1)
Development of a new PTP Profile for Time/Phase Distribution � AT&T, Inc. , Sprint , SymmetriCom, Inc. , Verizon Communication Corporation Q13/15 2012-08-24
[ 2052 ]
Protection Interworking editorial comments � Fujitsu Network Communications, Inc. Q9/15 2012-08-24
[ 2051 ]
Bi-directional SMP Operation and Signalling Flow Sequence � Ciena Corporation Q9/15 2012-08-24
[ 2050 ]
(Rev.1)
Proposal for determined text G.9955 Annex A - Amd1 - Padding of MAC frame � ERDF Q4C/15 2012-08-24
[ 2049 ]
Comments and clarifications on G.smp � Ciena Corporation Q9/15 2012-08-24
[ 2048 ]
G.odusmp Support of Both ODUj and ODUk Restoration � Fujitsu Network Communications, Inc. Q9/15 2012-08-24
[ 2047 ]
Use of CL-SNCG/S to simplify G.873.2 configurations � Ciena Corporation Q9/15 2012-08-24
[ 2046 ]
Not used �
Withdrawn by submitter
N/A � Q9/15 2012-08-24
[ 2045 ]
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes � AT&T, Inc. , Ciena Corporation Q9/15, Q14/15, Q13/15, Q11/15 2012-08-24
[ 2044 ]
G.odusmp with TCM APS � Fujitsu Network Communications, Inc. Q9/15 2012-08-24
[ 2043 ]
Alternative to legacy interfaces for connecting PRTC to T-GM � Cisco Systems, Inc. Q13/15 2012-08-24
[ 2042 ]
G.8272: PRTC Support of SyncE and ESMC � Cisco Systems, Inc. Q13/15 2012-08-24
[ 2041 ]
G.smp multiple failure protection pre-emption � Fujitsu Network Communications, Inc. Q9/15 2012-08-24
Results:452 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2025-1-25