International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : R23-WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�R23-WP4A� C�

ITU-R�R23-WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:358 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 58 ]
Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space) � United States AI1.3 2024-04-18
[ 57 ]
Proposed draft reply liaison statement to Working Party 7C - Relevant technical information for sharing studies under WRC-27 agenda item 1.19 � United States AI1.19 2024-04-18
[ 56 ]
Proposed draft reply liaison statement to Working Party 5D - Relevant technical information for sharing studies under WRC-27 agenda item 1.7 � United States AI1.7 2024-04-18
[ 55 ]
Potential Handbook outline on best practices for sustainable use of radio frequency spectrum and associated orbits [HANDBOOK SPACE SUSTAINABILITY] � United States 2024-04-18
[ 54 ]
Update to Report ITU-R S.2515-0 � United States 2024-04-18
[ 53 ]
Further work to study the alpha-table methodology and its use in Recommendation ITU-R S.1503 � United Kingdom 2024-04-17
[ 52 ]
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to enhance protection and sustainable development of broadcasting-satellite service in Regions 1 and 3 Plan band by addressing the significant discrepancies between service area and coverage area of networks operating as Region 2 fixed-satellite service in the frequency band 11.7-12.2 GHz � Iran (Islamic Republic of) AI7 2024-04-17
[ 51 ]
Proposed input on elements of the reply liaison statement to Working Party 7D on WRC-27 agenda item 1.16 � South Africa AI1.16 2024-04-17
[ 50 ]
Proposed structure for the draft Report on RR Article 22 epfd limits � Luxembourg 2024-04-17
[ 49 ]
Proposed liaison statement and Working Party 4A workplan regarding WRC-27 agenda item 1.1 � Luxembourg AI1.1 2024-04-17
[ 48 ]
Proposed parameters regarding ESIMs to be used for studies under WRC-27 agenda item 1.1 � Luxembourg AI1.1 2024-04-17
[ 47 ]
Comparison of current GSO links in Ku band with links used for the epfd derivation � Luxembourg 2024-04-17
[ 46 ]
Proposed annex to working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO] � China 2024-04-17
[ 45 ]
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO] � China 2024-04-17
[ 44 ]
Proposed studies on Resolution 35 (Rev.WRC-23) � China 2024-04-17
[ 43 ]
Proposed topic to be considered under WRC-23 agenda item 7 to develop possible regulatory measures to implement RR No. 4.4 � China AI7 2024-04-17
[ 42 ]
A proposed questionnaire on the current status and future plan of FSS satellite networks/systems in the Q/V band for WRC-27 agenda item 1.6 � China AI1.6 2024-04-17
[ 41 ]
Consideration on the preparations for WRC-27 agenda item 1.5 � China AI1.5 2024-04-17
[ 40 ]
Proposal on working document towards a preliminary draft new Report ITU-R S.[SHARING AND COMPATIBILITY STUDIES ON FSS/BSS IN 17.3-17.7/17.8 GHZ FOR R3] - WRC-27 agenda item 1.4 � China AI1.4 2024-04-17
[ 39 ]
(Rev.1)
Considerations on preparations for WRC-27 agenda item 1.3 � China AI1.3 2024-04-17
[ 38 ]
Proposal on the studies under WRC-27 agenda item 1.2 � China AI1.2 2024-04-17
[ 37 ]
Proposed draft liaison statements to contributing Working Parties regarding WRC-27 agenda item 1.1 � China AI1.1 2024-04-17
[ 36 ]
Working document towards a preliminary draft new Report ITU-R S.[STUDIES OF ARTICLE 22 MECHANISM] � Burundi , Cameroon , Chad , Congo (Republic of the) , Democratic Republic of the Congo , Gabon , Guinea , Sao Tome and Principe 2024-04-17
[ 35 ]
Medium Earth orbit earth station parameters for studies to be conducted under WRC-27 agenda item 1.3 � SES AI1.3 2024-04-16
[ 34 ]
Amendments to working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERFERENCE-NGSO] - Methodology to assess the average throughput degradation and unavailability increase between non-geostationary FSS satellite system � Samoa 2024-04-12
[ 33 ]
Workplan for WRC-27 agenda item 1.1 � Germany AI1.1 2024-04-12
[ 32 ]
Proposed Working document on WRC-27 agenda item 1.1 � Germany AI1.1 2024-04-12
[ 31 ]
Proposed liaison statement to contributing Working Parties of WRC-27 agenda item 1.1 � Germany AI1.1 2024-04-12
[ 30 ]
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-4 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations � Russian Federation 2024-04-11
[ 29 ]
Preliminary materials to support the study under WRC-27 agenda item 1.5 � Kazakhstan , Russian Federation AI1.5 2024-04-11
[ 28 ]
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to restrain the use of the same satellite or different satellites to repeatedly bring into use and bring back into use the same frequency assignments of a satellite network or system for a short period of time � Korea (Rep. of) AI7 2024-04-11
[ 27 ]
Proposed topic to be considered under WRC-27 agenda item 7 - Possible measures to limit the practice of introducing a completely different orbital plane for non-geostationary-satellite systems that is not foreseen to be required for operation of the constellation � Korea (Rep. of) AI7 2024-04-11
[ 26 ]
Working document towards a preliminary draft revision to Report ITU-R BO.2029 � Japan 2024-04-09
[ 25 ]
Provisions to be possibly reviewed under WRC-27 agenda item 1.4 � Japan AI1.4 2024-04-10
[ 24 ]
Liaison statement to Working Parties 4A and 4C (copy to Working Parties 3J, 3M, 5A, 5B, and 5C for information) - WRC-27 agenda item 1.18 � WP 7D AI1.18 2024-03-28
[ 23 ]
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 1B, 4A, 4C, 5A, 5B, and 5D for information) on WRC-27 agenda items 1.16 and 1.18 � WP 7D AI1.18, AI1.16 2024-03-28
[ 22 ]
Liaison statement to Working Parties 4A, 4C and 5A (copy to Working Parties 1B, 3J, 3M, 5B and 5D for information) - WRC-27 agenda item 1.16 � WP 7D AI1.16 2024-03-28
[ 21 ]
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15 � WP 7B AI1.15 2024-03-27
[ 20 ]
Liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7 � WP 7B AI1.7 2024-03-27
[ 19 ]
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Information on active and passive sensors in the EESS for WRC-27 agenda item 1.8 � WP 7C AI1.8 2024-03-26
[ 18 ]
Liaison statement to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.17 � WP 7C AI1.17 2024-03-25
[ 17 ]
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 5C, 5D, 7A and 7B (copy to ICAO for information) - WRC-27 agenda item 1.19 � WP 7C AI1.19 2024-03-25
[ 16 ]
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7D for information) - WRC-27 agenda item 1.7 � WP 7C AI1.7 2024-03-25
[ 15 ]
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5B, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18 � WP 7C AI1.18 2024-03-25
[ 14 ]
Liaison statement to Working Parties 3J, 3M (copy to Working Parties 4A, 4C, 5A, 5B and 5C) - Propagation aspects related to WRC-27 agenda item 1.18 � WP 7C AI1.18 2024-03-25
[ 13 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B (copy to Working Parties 5C, 3J and 3M) - Relevant technical information to support studies under WRC-27 agenda item 1.18 � WP 7C AI1.18 2024-03-25
[ 12 ]
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C and 7D for information) - WRC-27 agenda item 1.3 � WP 7C AI1.3 2024-03-25
[ 11 ]
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D for information) - WRC-27 agenda item 1.1 � WP 7C AI1.1 2024-03-25
[ 10 ]
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6 � WP 6A AI1.6 2024-03-18
[ 9 ]
Liaison statement to Working Party 5C (copy to Working Parties 1A, 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D for information) - WRC-27 agenda item 1.10 � WP 6A AI1.10 2024-03-18
Results:358 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-01-08