Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 48 ]
�
� |
Working Party 7C activities related to Resolution 731 (Rev. WRC-19)
�
� |
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
� |
� |
2020-09-21 |
|
[ 47 ]
�
� |
Further element towards revision of Recommendation ITU-R RS.1861-0
�
� |
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
� |
� |
2020-09-21 |
|
[ 46 ]
�
� |
Elements for possible sharing studies in the context of WRC-23 agenda item 1.2 involving EESS (passive) sensors in the 6 425-7 250 MHz range
�
� |
European Space Agency
� |
AI1.2
� |
2020-09-21 |
|
[ 45 ]
�
� |
Proposed draft reply liaison statement to Working Party 5D
�
� |
France
� |
AI1,2
� |
2020-09-21 |
|
[ 44 ]
�
� |
Work plan for working document towards a preliminary draft new ITU-R Report - Analysis of interference received by EESS (passive) sensors [IN THE 18.6 18.8 GHZ BAND] [CAUSED BY SURFACE WATHER REFLECTIONS] - Proposed Work Plan
�
� |
Institute of Electrical and Electronics Engineers, Inc.
� |
� |
2020-09-20 |
|
[ 43 ]
�
� |
Draft reply liaison to Working Party 3J - Earth surface bistatic scattering coefficient prediction
�
� |
Institute of Electrical and Electronics Engineers, Inc.
� |
� |
2020-09-20 |
|
[ 42 ]
�
� |
Draft reply liaison to Working Party 3J - Earth surface bistatic scattering coefficient prediction
�
� |
European Space Agency
� |
� |
2020-09-18 |
|
[ 41 ]
�
� |
Preliminary draft new Report ITU-R RS.[RF_SURVEY_SMOS]
�
� |
European Space Agency
� |
� |
2020-09-18 |
|
[ 40 ]
�
� |
Proposed liaison statement from Working Party 7C to Working Party 5D regarding WRC-23 agenda item 1.2
�
� |
United States of America
� |
AI1.2
� |
2020-09-18 |
|
[ 39 ]
�
� |
Review of typical technical and operational characteristics of Earth exploration satellite service (passive) systems contained in the preliminary draft revision of Recommendation ITU-R RS.1861
�
� |
United States of America
� |
� |
2020-09-18 |
|
[ 38 ]
�
� |
Reply liaison statement to Working Party 4A (copy for information to Working Party 3M, 4B, 4C, 5A, 5B, 5C, and 7B) - WRC-23 agenda item 1.16
�
� |
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
� |
AI1.16
� |
2020-09-18 |
|
[ 37 ]
�
� |
Revisions to working document towards a preliminary draft new ITU-R Report - Analysis of interference received by EESS (passive) sensors [IN THE 18.6-18.8 GHZ] [CAUSED BY SURFACE WATER REFLECTIONS]
�
� |
European Space Agency
� |
� |
2020-09-18 |
|
[ 36 ]
�
� |
Working document towards a preliminary draft new Report ITU-R RS.[GROUND_PASS_SENSORS]
�
� |
Switzerland (Confederation of)
,
France
� |
� |
2020-09-18 |
|
[ 35 ]
�
� |
Elements related to WRC-23 agenda item 1.14
�
� |
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
� |
AI1.14
� |
2020-09-18 |
|
[ 34 ]
�
� |
Working document towards a preliminary draft new Report ITU-R RS.[GLOBAL_SURVEY_SMAP_RFI] - Global survey of radio frequency interference observed by the SMAP radar in the 1 215-1 300 MHz band and the SMAP radiometer in the 1 400-1 427 MHz band
�
� |
United States of America
� |
� |
2020-09-14 |
|
[ 33 ]
�
� |
Working document towards a preliminary draft revised Report ITU-R RS.2455-1
�
� |
United States of America
� |
AI1.12
� |
2020-09-14 |
|
[ 32 ]
�
� |
Draft reply liaison statement to Wolrking Party 1A - Interference from broadcasting satellite receiving equipment into EESS (passive) remote sensors
�
� |
United States of America
� |
� |
2020-09-14 |
|
[ 31 ]
�
� |
Working document towards a preliminary draft new Report ITU-R RS.[GLOBAL_SURVEY_AQ_RFI] - Global survey of radio frequency interference observed by the Aquarius scatterometer in the 1 215-1 300 MHz band and the Aquarius radiometer in the 1 400-1 427 MHz band
�
� |
United States of America
� |
� |
2020-09-14 |
|
[ 30 ]
�
� |
Proposed liaison statement to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 4C, 5A, 5B, 5C, 6A and 7D - Work to be conducted by Working Party 7C under agenda item 9.1 Topic A
�
� |
United States of America
� |
� |
2020-09-14 |
|
[ 29 ]
�
� |
Working document towards preliminary draft new Report ITU-R RS.[SW_INTERF_CRITERIA] - Interference criteria of receive only space weather sensors
�
� |
United States of America
� |
� |
2020-09-14 |
|
[ 28 ]
�
� |
Preliminary draft revised Report ITU-R RS.2456 - Space weather sensor systems using radio spectrum
�
� |
United States of America
� |
� |
2020-09-14 |
|
[ 27 ]
�
� |
Working document towards a preliminary draft new Report ITU-R RS.[SPEC_REQTS_RX_SPACE_WEATHER] - Spectrum requirements and applicable radio service designations for receive only space weather sensors that provide data critical for predictions and warnings
�
� |
United States of America
� |
� |
2020-09-14 |
|
[ 26 ]
�
� |
Proposed work plan for WRC-23 agenda item 9.1, Topic A
�
� |
United States of America
� |
AI9.1
� |
2020-09-14 |
|
[ 25 ]
�
� |
Revision to preliminary draft new Report ITU-R RS.[EESS_SAR-RNSS]
�
� |
United States of America
� |
� |
2020-09-14 |
|
[ 24 ]
�
� |
Elements related to WRC-23 agenda item 1.14 - Studies related to possible EESS (passive) allocations in the frequency range 231.5-252 GHz
�
� |
United States of America
� |
AI1.14
� |
2020-09-14 |
|
[ 23 ]
�
� |
Preliminary draft revision of Report ITU-R RS.2068-1 - Current and future use of the band 13.25 GHz by spaceborne active sensors
�
� |
United States of America
� |
� |
2020-09-14 |
|
[ 22 ]
�
� |
Proposal of draft reply liaison statement to Working Party 5D regarding agenda item1.4
�
� |
Brazil (Federative Republic of)
� |
AI1.4
� |
2020-09-14 |
|
[ 21 ]
�
� |
Proposed liaison statement to Working Party 5D on the studies related to RR No. 21.5 regarding AAS.
�
� |
France
� |
� |
2020-09-11 |
|
[ 20 ]
�
� |
Consideration on possible elements for a draft new Question ITU-R XX/1 - Protection of EESS (passive) remote sensors against interference caused by radiation from broadcasting-satellite receiving equipment
�
� |
Japan
� |
� |
2020-09-07 |
|
[ 19 ]
�
� |
Information on outline and basic concept of sharing and compatibility studies between FOD and Active/Passive Sensors conducted in Japan
�
� |
Japan
� |
� |
2020-09-07 |
|
[ 18 ]
�
� |
Proposed liaison statement to Working Party 4A regarding WRC-23 agenda item 9.1, d) - Request for clarification on the relevant non-GSO FSS technical characteristics concerning the protection of EESS (passive) in the frequency band 36-37 GHZ
�
� |
Japan
� |
� |
2020-09-07 |
|
[ 17 ]
�
� |
Proposals to WP 7C participating WRC-23 action items
�
� |
Russian Federation
� |
� |
2020-09-03 |
|
[ 16 ]
�
� |
Interaction between WP 7C and WP 4A on the issue of study on compatibility between EESS (PASSIVE) systems operating in the 10.6-10.7 GHz and FSS systems operating in the frequency band 10.7-10.95 GHz
�
� |
Russian Federation
� |
� |
2020-09-03 |
|
[ 15 ]
�
� |
Relevance of the frequency band 10.6-10.7 GHz studies conducted under agenda item 1.15
�
� |
Germany (Federal Republic of)
� |
AI1.15
� |
2020-07-06 |
|
[ 14 ]
�
� |
Preliminary position on WRC-23 agenda
�
� |
World Meteorological Organization
� |
� |
2020-05-13 |
|
[ 13 ]
�
� |
Proposed liaison statement to Working Party 5D (copy to Working Parties 5B, 4A and 7B)
�
� |
France
� |
� |
2020-04-13 |
|
[ 12 ]
�
� |
Proposed draft reply liaison statement to Working Party 5D
�
� |
Germany (Federal Republic of)
,
France
� |
� |
2020-04-14 |
|
[ 11 ]
�
� |
Proposed liaison statement to Working Party 5C
�
� |
France
� |
� |
2020-04-13 |
|
[ 10 ]
�
� |
Working document toward a preliminary draft new Report ITU-R RS.[GROUND_PASS_SENSORS]
�
� |
France
,
Switzerland (Confederation of)
� |
� |
2020-04-13 |
|
[ 9 ]
�
� |
Proposed liaison statement to Working Party 6A
�
� |
France
� |
� |
2020-04-13 |
|
[ 8 ]
�
� |
Proposed liaison statement to Working Party 5A
�
� |
France
� |
� |
2020-04-13 |
|
[ 7 ]
�
� |
Views on the need to update the preliminary draft revision of Recommendation ITU-R RS.1861 - Typical technical and operational characteristics of Earth exploration-satellite service (passive) systems using allocations between 1.4 and 275 GHz
�
� |
United States of America
� |
� |
2020-04-13 |
|
[ 6 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B and 5C (copy to Working Parties 3J and 3M for information)
�
� |
United States of America
� |
AI1.14
� |
2020-04-13 |
|
[ 5 ]
�
� |
Draft reply liaison statement to ITU-R Working Party 3J - Earth surface bistatic scattering coefficient prediction
�
� |
European Space Agency
� |
� |
2020-04-13 |
|
[ 4 ]
�
� |
Draft reply liaison to Working Party 3J - Earth surface bistatic scattering coefficient prediction
�
� |
Institute of Electrical and Electronics Engineers, Inc.
� |
� |
2020-04-10 |
|
[ 3 ]
�
� |
Lack of mutual planning between EESS (active) and RAS in design of the impending Earthcare 94 GHz cloud-profiling radar mission
�
� |
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science
� |
� |
2020-04-08 |
|
[ 2 ]
�
� |
Contribution to Working Parties 7A, 7B, 7C and 7D on relevant agenda item of WRC-23
�
� |
Iran (Islamic Republic of)
� |
� |
2020-03-23 |
|
[ 1 ]
�
� |
Reply liaison statement to ITU-R Working Party 5B (copy for information to Working Party 7C) - Deployment of Foreign Object Debris Detection Radars in the 92-100 GHz frequency range at airports globally
�
� |
International Civil Aviation Organization
� |
� |
2020-03-02 |
Results:348 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7
� |
Multiple Document Download:�Formats and Languages to be included (when available):