Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 683 ]
�
� |
Statistics on the coordination activities for submissions made in accordance with Resolution 559 (WRC-19)
�
� |
Director, BR
� |
� |
2022-05-09 |
|
[ 682 ]
�
� |
Liaison statement to Working Parties 4A, 5A, 5C and 5D - WR-23 agenda item 9.1, topic d)
�
� |
WP 7C
� |
AI9.1D)
� |
2022-05-09 |
|
[ 681 ]
�
� |
Proposed modifications to working document on developing an ITU-R Small Satellite Handbook
�
� |
Director, BR
� |
� |
2022-05-09 |
|
[ 680 ]
�
� |
Statistic of the new notices of satellite networks submitted under � 6.1 of Article 6 of RR Appendix 30B
�
� |
Director, BR
� |
� |
2022-05-09 |
|
[ 679 ]
�
� |
Updates statistics on submissions and suppressions for additional uses under Article 4 of RR Appendices 30 and 30A in Regions 1 and 3
�
� |
Director, BR
� |
� |
2022-05-09 |
|
[ 678 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1526-1
�
� |
Director, BR
� |
� |
2022-05-09 |
|
[ 677 ]
�
� |
Reply liaison statement to Working Party 4A - WRC-23 agenda item 1.15
�
� |
WP 7C
� |
AI1.15
� |
2022-05-06 |
|
[ 676 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, and 7D (copy to Working Parties 3J and 3M for information) - WRC-23 agenda item 1.14
�
� |
WP 7C
� |
AI1.14
� |
2022-05-06 |
|
[ 675 ]
�
� |
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 6A, and 7D - Preliminary draft CPM text on WRC-23 agenda item 9.1, topic a)
�
� |
WP 7C
� |
AI9.1A)
� |
2022-05-06 |
|
[ 674 ]
�
� |
Liaison statement to Working Parties 3K, 3M, 4A, 5A, 5B, 5C, 7C, and 7D - Report on progress of activities relating to agenda item 1.13 (WRC-23)
�
� |
WP 7B
� |
AI1.13
� |
2022-05-05 |
|
[ 673 ]
�
� |
Sharing studies regarding non-GSO LEO user stations transmitting to MEO service providers in the frequency band 27.5-30 GHz for the "Within the cone of coverage" scenario under agenda item 1.17
�
� |
OneWeb
� |
AI.17
� |
2022-05-04 |
|
[ 672 ]
�
� |
Case study: Uplink interference
�
� |
Botswana (Republic of)
,
Cameroon (Republic of)
,
Ghana
,
Mozambique (Republic of)
,
North Macedonia (Republic of)
,
Romania
,
Rwanda (Republic of)
,
Serbia (Republic of )
,
Somalia (Federal Republic of)
,
South Africa (Republic of)
,
Uganda (Republic of)
� |
� |
2022-05-04 |
|
[ 671 ]
�
� |
Long-term protection of assignments in the Regions 1 and 3 BSS plans, allotments in the FSS plan and those intended to enter into these plans
�
� |
Angola (Republic of)
,
Botswana (Republic of)
,
Cameroon (Republic of)
,
Comoros (Union of the)
,
Congo (Democratic Republic of)
,
Djibouti (Republic of)
,
Eswatini (Kingdom of)
,
Gabon (Republic of)
,
Kenya (Republic of)
,
Lesotho (Kingdom of)
,
Madagascar (Republic of)
,
Malawi
,
Mali (Republic of)
,
Mauritius (Republic of)
,
Mozambique (Republic of)
,
Namibia (Republic of)
,
Niger (Republic of the)
,
Rwanda (Republic of)
,
Senegal (Republic of)
,
Somalia (Federal Republic of)
,
South Africa (Republic of)
,
South Sudan (Republic of)
,
Tanzania (United Republic of)
,
Tunisia (Republic of)
,
Uganda (Republic of)
,
Zambia (Republic of)
,
Zimbabwe (Republic of)
� |
AI7
� |
2022-05-04 |
|
[ 670 ]
�
� |
Liaison statement to Working Party 4A - Preliminary draft revision of Report ITU-R SA.2307 - Protection of SRS and FSS systems sharing the 37.5-38 GHz band
�
� |
WP 7B
� |
� |
2022-05-04 |
|
[ 669 ]
�
� |
Note from the Chairman of Working Party 5D to the Chairman of Working Party 4A - FSS characteristics for studies under WRC-23 agenda item 1.2
�
� |
Chairman, WP 4A
� |
AI1.2
� |
2022-05-04 |
|
[ 668 ]
�
� |
WRC-23 agenda item 7 Topic regarding BR reminders
�
� |
OneWeb
� |
� |
2022-05-04 |
|
[ 667 ]
�
� |
Responsibility of the entities involved in the operation of the earth stations on aircraft and vessels under WRC-23 agenda item 1.15
�
� |
Egypt (Arab Republic of)
� |
AI1.15
� |
2022-05-04 |
|
[ 666 ]
�
� |
Working document towards draft CPM text for WRC-23 agenda item 1.15
�
� |
Egypt (Arab Republic of)
� |
AI1.15
� |
2022-05-04 |
|
[ 665 ]
�
� |
KSU_CUBESAT satellite inclusion in working document on developing an ITU-R Small Satellite Handbook
�
� |
Saudi Arabia (Kingdom of)
� |
� |
2022-05-04 |
|
[ 664 ]
�
� |
Working document towards draft CPM text for WRC-23 agenda item 7, Topic F - Exclusion of service and coverage areas for feeder-links/uplinks in the bands subject to RR Appendix 30A and RR Appendix 30B
�
� |
Saudi Arabia (Kingdom of)
� |
AI7F
� |
2022-05-04 |
|
[ 663 ]
�
� |
Proposal for WRC-23 consideration - Agenda item 7 new Topic - Regulatory provisions for TT&C frequencies for non-GSO In orbit servicing (IOS) satellite systems
�
� |
Astroscale Ltd.
� |
AI7
� |
2022-05-04 |
|
[ 662 ]
�
� |
Working document towards a draft CPM text for WRC-23 agenda item 1.19
�
� |
Brazil (Federative Republic of)
� |
AI1.19
� |
2022-05-04 |
|
[ 661 ]
�
� |
Working document on WRC-23 agenda item 1.17
�
� |
Brazil (Federative Republic of)
� |
AI1.17
� |
2022-05-04 |
|
[ 660 ]
�
� |
Annex 2 to working document on WRC-23 agenda item 1.17
�
� |
Brazil (Federative Republic of)
� |
AI1.17
� |
2022-05-04 |
|
[ 659 ]
�
� |
Liaison statement to Working Party 4A - Working document towards a preliminary draft revision of Recommendation ITU-R SA.2079 - Frequency sharing between SRS and FSS (space-to-Earth) systems in the 37.5-38 GHz band
�
� |
WP 7B
� |
� |
2022-05-04 |
|
[ 658 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[MEASUREMENT _S1503] - Measurement of input parameters used by Recommendation ITU-R S.1503 to calculate epfd (down)
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2022-05-04 |
|
[ 657 ]
�
� |
Proposal for WRC-23 agenda item 7 new topic - Inclusion of Additional Parameters in Appendix 4 as Required by Proposed Revision to Recommendation ITU-R S.1503
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2022-05-04 |
|
[ 656 ]
�
� |
Management of aggregate epfd by selective modification of NSYS
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2022-05-04 |
|
[ 655 ]
�
� |
General revisions to Recommendation ITU-R S.1503
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2022-05-04 |
|
[ 654 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[INTEFERENCE-NON-GSO]
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2022-05-04 |
|
[ 653 ]
�
� |
Inclusion of the alpha table in the epfd (down) satellite selection algorithm in Recommendation ITU-R S.1503
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2022-05-04 |
|
[ 652 ]
�
� |
Article 4.1.24 of RR Appendices 30 and 30A
�
� |
Norway
� |
AI7
� |
2022-05-04 |
|
[ 651 ]
�
� |
Proposals on satellite and earth station antenna gain patterns in sharing and compatibility studies between FSS in the frequency band 6 425-7 075 MHz and IMT IN 6 425-7 125 MHz
�
� |
Huawei Technologies Sweden AB
,
Nokia Corporation
,
Telefon AB - LM Ericsson
� |
AI1.2
� |
2022-05-04 |
|
[ 650 ]
�
� |
FSS protection criteria for adjacent band compatibility studies for the frequency band 3 600-3 800 MHz
�
� |
GSMA
� |
� |
2022-05-04 |
|
[ 649 ]
�
� |
Application of FSS parameters to be used for interference studies
�
� |
Al Yah Satellite Communications (YahSat)
� |
� |
2022-05-04 |
|
[ 648 ]
�
� |
WRC-23 agenda item 7, Topic E - Case studies single power level with Resolution 170 (WRC-19) criteria
�
� |
Benin (Republic of)
,
Bosnia and Herzegovina
,
Cameroon (Republic of)
,
Central African Republic
,
Congo (Republic of)
,
Croatia (Republic of)
,
Gabonese Republic
,
Ghana
,
Kenya (Republic of)
,
Moldova (Republic of)
,
Mozambique (Republic of)
,
Namibia (Republic of)
,
Niger (Republic of the)
,
North Macedonia (Republic of)
,
Rwanda (Republic of)
,
Serbia (Republic of )
,
South Sudan
,
Tanzania (United Republic of)
� |
� |
2022-05-04 |
|
[ 647 ]
�
� |
WRC-23 agenda item 7, Topic E
�
� |
Luxembourg
,
Norway
,
Sweden
� |
AI7E
� |
2022-05-04 |
|
[ 646 ]
�
� |
Proposed modifications to the working document towards draft CPM text for WRC-23 agenda item 7, Topic B
�
� |
Luxembourg
� |
AI7B
� |
2022-05-04 |
|
[ 645 ]
�
� |
Working document - Discussions of non-GSO-GSO aggregate interference topics within Working Party 4A and updates towards a working document towards a preliminary draft new Report ITU-R S.[AGGREGATE NGSO-GSO INTERFERENCE AND TERMS OF REFERENCE FOR CONSULTATION MEETINGS]
�
� |
Luxembourg
� |
� |
2022-05-04 |
|
[ 644 ]
�
� |
Preliminary draft new Recommendation to develop a methodology for evaluating aggregate dowllink equivalent power flux density into geostationary satellite networks in the fixed satellite service from multiple non-Geostationary satellite systems in the Ku and Ka frequency bands and terms of reference for consultation meeting
�
� |
Luxembourg
� |
� |
2022-05-04 |
|
[ 643 ]
�
� |
Working document towards draft CPM text for WRC-23 agenda item 1.17 and draft new Resolution
�
� |
Luxembourg
� |
AI.17
� |
2022-05-04 |
|
[ 642 ]
�
� |
Including a new administrations in the service area of an assignment in the Regions 1 & 3 list of Appendices 30 and 30A, in the Region 2 plan resulting from the successful application of � 4.2 procedure of Appendices 30 and 30A and in the list of Appendix 30B
�
� |
Luxembourg
,
Sweden
� |
AI7
� |
2022-05-04 |
|
[ 641 ]
�
� |
Additional measures for national allotments subject to agreements under paragraph 6.15 of RR Appendix 30B
�
� |
Angola (Republic of)
,
Botswana (Republic of)
,
Eswatini (Kingdom of)
,
Lesotho (Kingdom of)
,
Luxembourg
,
Malawi
,
Mozambique (Republic of)
,
Namibia (Republic of)
,
South Africa (Republic of)
,
Tanzania (United Republic of)
,
Zambia (Republic of)
,
Zimbabwe (Republic of)
� |
AI7
� |
2022-05-04 |
|
[ 640 ]
�
� |
Sharing and compatibility studies between proposed operations of earth stations on aircraft in 12.75-13.25 GHz band and aeronautical radionavigation systems operating in the 13.25-13.40 GHz band
�
� |
Germany (Federal Republic of)
� |
AI1.5
� |
2022-05-04 |
|
[ 639 ]
�
� |
Protection of terrestrial services from interference from earth stations on aircraft under WRC-23 agenda item 1.15
�
� |
Germany (Federal Republic of)
� |
AI1.15
� |
2022-05-04 |
|
[ 638 ]
�
� |
Criteria for the protection of fixed-satellite and broadcasting-satellite services
�
� |
Al Yah Satellite Communications (YahSat)
� |
� |
2022-05-04 |
|
[ 637 ]
�
� |
Draft liaison statement to Working Party 5D - FSS characteristics for studies under WRC-23 agenda item 1.2
�
� |
Global Satellite Operators Association GSOA
� |
AI1.2
� |
2022-05-04 |
|
[ 636 ]
�
� |
Proposal on elements on a working document towards a new Recommendation/Report ITU-R S.[MITIGATION MEASURES]
�
� |
Ghana
,
Congo (Democratic Republic of)
,
Niger (Republic of the)
� |
� |
2022-05-04 |
|
[ 635 ]
�
� |
The Importance of accounting for all sources of interference when analysing the performance of non-GSO systems
�
� |
Intelsat
� |
� |
2022-05-04 |
|
[ 634 ]
�
� |
Proposals for the working document towards a preliminary new Report ITU-R S.[SCALING FACTOR]
�
� |
Germany (Federal Republic of)
� |
� |
2022-05-04 |
Results:983 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):