International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP6A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP6A� C�

ITU-R�WP6A

Terrestrial Broadcasting Delivery

Results:589 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 289 ]
Test results of Convergent Digital Radio (CDR) � China (People's Republic of) 2017-09-25
[ 288 ]
HD Radio Technology (System C) expand U.S. broadcast opportunities (for information) � United States of America 2017-09-22
[ 287 ]
Revision of Report ITU-R BT.2069-6 - "Tuning ranges and operational characteristics of terrestrial electronic news gathering (ENG), television outside broadcast (TVOB) and electronic field production (EFP) systems" � United States of America 2017-09-22
[ 286 ]
Updates on the United States' broadcast incentive auction (for information) � United States of America 2017-09-22
[ 285 ]
ATSC 3.0 (for information) � United States of America 2017-09-22
[ 284 ]
Proposal for revision of Report BT.2295 - Digital terrestrial broadcasting systems � Russian Federation 2017-09-22
[ 283 ]
Proposed additions to the ITU-R Report BT.2254 "Frequency and network planning aspects of DVB-T2" � Russian Federation 2017-09-22
[ 282 ]
Comment on the working document towards the preliminary draft new Report ITU-R BT.[WBR] - Worldwide television and sound broadcasting roaming � Norddeutscher Rundfunk (NDR) , Zweites Deutsches Fernsehen 2017-09-22
[ 281 ]
Working document of Working Party 1B towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Comments on the protection of the broadcasting service in case of Dynamic Spectrum Access (DSA) � Norddeutscher Rundfunk (NDR) , Zweites Deutsches Fernsehen 2017-09-22
[ 280 ]
Reply liaison statement to Working Party 7B regarding WRC-19 agenda item 1.3 � CBS Corporation AI1.3 2017-09-21
[ 279 ]
Editorial revisions to Recommendation ITU-R BT.2036 - Characteristics of a reference receiving system for frequency planning of digital terrestrial television systems � CBS Corporation 2017-09-21
[ 278 ]
Further proposal for treatment of ITU-R Handbooks in the purview of Study Group 6 � CBS Corporation 2017-09-21
[ 277 ]
Rapporteur Report on recent activities on Terminology � SG 6 Rapp. on Terminology 2017-09-20
[ 276 ]
Report to Working Party 6A - Use of MER to assess impact of anomalous propagation on co-channel interference � Free TV Australia Ltd. 2017-09-19
[ 275 ]
For information a voluntary North American digital radio standard � North American Broadcasters Association (NABA) 2017-09-18
[ 274 ]
Proposed draft new Report ITU-R [AM-MOD-DEPTH] � British Broadcasting Corporation (BBC) 2017-09-15
[ 273 ]
Report of activities � RG on DTT Planning 2017-09-13
[ 272 ]
Working document towards a new Recommendation ITU-R BT.[BEYON1STGEN] - Methodology for performance evaluation of digital television broadcasting beyond 1st generation DTTB systems, including assessment of coverage � Report from CG [BEYOND1stGEN] Q132/6 2017-09-12
[ 271 ]
WRC-19 agenda items 1.1, 1.3, 1.6, 1.7, 1.10, 1.11, 1.12, 1.13, 1.15, 9 issues 9.1.2 and 9.1.16 � RG for WRC-19 related studies 2017-09-12
[ 270 ]
Liaison statement on ITU-T Study Group 5 lead Study Group activities � ITU-T SG 5 2017-09-08
[ 269 ]
Liaison statement on Operational Plan for Implementation of WTSA-16 Resolutions 72 and 73 (Hammamet, 2016), and Resolution 79 (Dubai, 2012) � ITU-T SG 5 2017-09-08
[ 268 ]
Reply liaison statement to Working Party 6A - Use of modulation error ratio (MER) to assess ducting � WP 3K 2017-09-06
[ 267 ]
Reply liaison statement to Working Party 6A - Location variability in land area-coverage prediction � WP 3K 2017-09-05
[ 266 ]
Liaison statement from ITU-D Study Group 2 Question 5/2 to ITU-T, ITU-R, ASTAP and CITEL on disaster relief use cases - Utilization of telecommunications/ICTs for disaster preparedness, mitigation and response � ITU-D SG 2 2017-08-28
[ 265 ]
Liaison statement to ITU-T Study Group 5, ITU-R Study Groups 1, 4, 5, 6 and their relevant Working Parties on ongoing collaboration � ITU-D SG 2 2017-08-28
[ 264 ]
Assistance to developing countries for implementing conformance and interoperability programmes � ITU-D SG 2 2017-08-22
[ 263 ]
Reply liaison statement to Working Party 7D (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, and 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services � WP 1A 2017-07-10
[ 262 ]
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7A, 7B, 7C & 7D on Resolution 63 (Rev. WRC-12) � WP 1A 2017-07-10
[ 261 ]
Reply liaison statement to Working Party 1A (copy for information to Working Parties 3L, 5A, 5B, 5C, 6A, 7A and 7D) - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services � WP 1C 2017-07-07
[ 260 ]
Liaison statement to Working Party 6A - Reply to the remarks and Questions of Working Party 6A concerning the revision of Recommendation ITU-R SM.1875-2 � WP 1C 2017-07-07
[ 259 ]
Liaison statement to ITU-R Study Group 6 - Terms, acronyms and definitions � CCV and SCV 2017-07-05
[ 258 ]
Liaison statement to Working Parties 6A, 6B and 6C - Draft revision of Report ITU-R M.2373 � WP 5D 2017-06-29
[ 257 ]
Liaison statement on information about work being carried out under study in ITU-T Question 3/5 � ITU-T SG 5 2017-06-23
[ 256 ]
Liaison statement on ITU inter-Sector coordination (reply to TSAG - LS 1 - E) � ITU-T SG 5 2017-06-16
[ 255 ]
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - WRC-19 agenda item 9.1, issue 9.1.2 � WP 4A AI9.1 2017-05-24
[ 254 ]
Liaison statement on ITU inter-Sector coordination (to ISCT, TDAG, ITU-D SGs, RAG, ITU-R SGs, ITU-T SGs) � ITU-T (TSAG) 2017-05-08
[ 253 ]
Note to Chairman of Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Microsoft EXCEL implementation of clutter loss and building entry loss calculations � Chairmen, SG 3 and WPs 3J, 3K & 3M 2017-04-13
[ 252 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A concerning WRC-19 agenda item 1.7 � WP 7B 2017-04-13
[ 251 ]
Liaison statement to Working Parties 5A, 5B and 5C (copied to Working Parties 3L and 6A for information) - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range � WP 7C 2017-04-13
[ 250 ]
Liaison statement to Working Party 6A regarding WRC-19 agenda item 1.3 � WP 7B AI1.3 2017-04-11
[ 249 ]
Liaison statement to Working Parties 3M (for action) and Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A (for information) � WP 7B 2017-04-07
[ 248 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A and Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 � WP 7B 2017-04-07
[ 247 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services � WP 7D 2017-04-07
[ 246 ]
Liaison statement to Working Party 1B (copy to Working Parties 1A, 5B, 5C, 6A and 7A for information) - Studies on "Wireless power transmission (WPT)" � WP 7D AI9.1 2017-04-07
[ 245 ]
Liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Preparations for WRC-19 agenda item 1.13 � Chairman, WP 6A AI1.13 2017-04-05
[ 244 ]
Liaison statement on the new structure of ITU-T Study Group 20 � ITU-T SG 20 2017-04-05
[ 243 ]
Liaison statement to Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Guidance on the use of ITU-R P-Series Recommendations for interference prediction and sharing studies under WRC-19 agenda item 1.13 � WPs 3K, 3J & 3M AI1.13 2017-03-31
[ 242 ]
+Ann.19(Rev.1)
Report of the meeting of Working Party 6A (Geneva, 21 - 29 March 2017) � Chairman, WP 6A 2017-03-30
[ 241 ]
Final List of Participants - Working Party 6A (Geneva, 21-29 April 2017) � Director, BR 2017-03-29
[ 240 ]
Liaison statement of Working Party 6C to Working Party 6A on the definitions of "pixel" � WP 6C 2017-03-27
Results:589 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2021-01-19