International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:915 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 615 ]
Revisions to the working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] � Luxembourg AI7 2018-02-13
[ 614 ]
Draft CPM text for WRC-19 agenda item 1.4 - Agenda item 1.4 � Luxembourg AI1.4 2018-02-13
[ 613 ]
Preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for he GSO broadcasting-satellite service in all Regions - Agenda item 1.4 � Luxembourg AI1.4 2018-02-13
[ 612 ]
Proposed modifications to the preliminary draft new Report ITU-R S.[SPECTRUM_NEEDS] - WRC-19 agenda item 9.1, isse 9.1.9 � France AI9.1 2018-02-13
[ 611 ]
Proposed modifications to the preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - WRC-19 agenda item 9.1, issue 9.1.9 � France AI9.1 2018-02-13
[ 610 ]
Proposed modifications to the working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9 � France AI9.1 2018-02-13
[ 609 ]
Proposed modifications and comments on working document towards a preliminary draft new Report ITU-R S.[50/40 GSO-NGSO SHARING] - WRC-19 agenda item 1.6 � France AI1.6 2018-02-13
[ 608 ]
Proposed modifications to the working document towards a preliminary draft new Report ITU-R S.[50/40 GHz ADJACENT BAND STUDIES] - WRC-19 agenda item 1.6 � France AI1.6 2018-02-13
[ 607 ]
Updates to working document towards a preliminary draft revision of Recommendation ITU-R S.1782-0 and updates to the related work plan � France 2018-02-13
[ 606 ]
Simplified regulatory regime for non-GSO satellites with short duration missions � South Africa (Republic of) 2018-02-13
[ 605 ]
Update to RR Appendix 4 data required for RR Article 22 EPFD verification after revision to Recommendation ITU-R S.1503 � United Kingdom of Great Britain and Northern Ireland 2018-02-13
[ 604 ]
Proposed changes to working document towards draft CPM text for WRC-19 agenda item 1.5 � United Kingdom of Great Britain and Northern Ireland , Austria , France , Hungary AI1.5 2018-02-13
[ 603 ]
ESIM compatibility with NGSO MSS feeder links in 19.3-19.7 GHz and 29.1-29.5 GHz bands � United Kingdom of Great Britain and Northern Ireland AI1.5 2018-02-13
[ 602 ]
Sharing and compatibility between ESIM and terrestrial services � United Kingdom of Great Britain and Northern Ireland AI1.5 2018-02-13
[ 601 ]
Maritime-ESIM coexistence with FS stations � United Kingdom of Great Britain and Northern Ireland AI1.5 2018-02-13
[ 600 ]
Reply liaison statement to Working Party 4A (copy for information to Working Party 6A) - WRC-19 agenda item 9.1, issue 9.1.2 � WP 5D AI9.1 2018-02-13
[ 599 ]
Apportionment of the criteria for the protection of satellite services - In studies under WRC-19 agenda items 1.13, 1.14 and 1.16 � Al Yah Satellite Communications (YahSat) , Arab Satellite Communications Organization , Asia Satellite Telecommunications Co. Ltd. (AsiaSat) , EMEA Satellite Operator's Association (ESOA) , HISPASAT, S.A. , Inmarsat Plc. , Intelsat , O3b Networks Limited , SES WORLD SKIES , Thuraya Telecommunications Company AI1.16, AI1.14, AI1.13 2018-02-13
[ 598 ]
Criteria for the protection of fixed and broadcasting-satellite services - In sharing studies under WRC-19 agenda item 1.13, 1.14 and 1.16 � Al Yah Satellite Communications (YahSat) , Arab Satellite Communications Organization , Asia Satellite Telecommunications Co. Ltd. (AsiaSat) , EMEA Satellite Operator's Association (ESOA) , Eutelsat S.A. , HISPASAT, S.A. , Inmarsat Plc. , Intelsat , O3b Networks Limited , One Web , SES WORLD SKIES , Thuraya Telecommunications Company AI1.16, AI1.14, AI1.13 2018-02-13
[ 597 ]
Comments on Annex 49 to Working Party 4A Chairman's Report - Working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9 � Iran (Islamic Republic of) AI9.1 2018-02-13
[ 596 ]
Comments on Annex 47 to Working Party 4A Chairman's Report - Working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.3 � Iran (Islamic Republic of) AI9.1 2018-02-13
[ 595 ]
Comments on Annex 45 to Working Party 4A Chairman's Report - Working document towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2 � Iran (Islamic Republic of) AI9.1 2018-02-13
[ 594 ]
Comments on Annex 5 to Working Party 4A Chairman's Report - Working document towards a preliminary draft revision of Recommendation ITU-R S.1782-0 - Global broadband Internet access by fixed-satellite service systems � Iran (Islamic Republic of) 2018-02-13
[ 593 ]
Comments on Annex 4 to Working Party 4A Chairman's Report - Working document towards a preliminary draft new Recommendation ITU-R S.[GUIDELINES HARMFUL INTERFERENCE REPORTING] - Guidelines for reporting harmful interference for cases of GSO satellite services � Iran (Islamic Republic of) 2018-02-13
[ 592 ]
Comments on Annex 1 to Working Party 4A Chairman's Report - Preliminary draft new Recommendation ITU-R S.[50/40 GHZ FSS SHARING METHODOLOGY] - Maximum permissible levels of interference in a satellite network (GSO and non-GSO) in the fixed-satellite service caused by other co-directional FSS networks operating in the 50/40 GHz frequency bands � Iran (Islamic Republic of) 2018-02-15
[ 591 ]
Comments on Annex 7 to Working Party 4A Chairman's Report - Working document towards draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments, and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services � Iran (Islamic Republic of) AI7 2018-02-13
[ 590 ]
Comments on Annex 42 to Working Party 4A Chairman's Report - Preliminary draft CPM text for WRC-19 agenda item 7 - Issue J � Iran (Islamic Republic of) AI7 2018-02-13
[ 589 ]
Comments on Annex 39 to Working Party 4A Chairman's Report - Working document towards draft CPM text for WRC-19 agenda item 7 - issue G � Iran (Islamic Republic of) AI7 2018-02-13
[ 588 ]
Comments on Annex 38 to Working Party 4A Chairman's Report - Working document towards draft CPM text for WRC-19 agenda item 7 - issue F � Iran (Islamic Republic of) AI7 2018-02-13
[ 587 ]
Comments on Annex 37 to Working Party 4A Chairman's Report - Working document towards draft CPM text for WRC-19 agenda item 7 - Issue E � Iran (Islamic Republic of) AI7 2018-02-13
[ 586 ]
Comments on Annex 34 to Working Party 4A Chairman's Report working document towards draft CPM text for WRC-19 agenda item 7 - Issue B � Iran (Islamic Republic of) AI7 2018-02-13
[ 585 ]
Comments on Annex 11 to Working Party 4A Chairman's Report - Working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz � Iran (Islamic Republic of) AI1.5 2018-02-13
[ 584 ]
Comments on Annex 29 to Working Party 4A Chairman's Report - Working document toward draft CPM text for WRC-19 agenda item 1.5 - Agenda item 1.5 (WP 4A / WP 4B, WP 4C, WP 5A, WP 5C, WP 7C, (WP 3M), (WP 5D), (WP 7B)) � Iran (Islamic Republic of) AI1.5 2018-02-13
[ 583 ]
Comments on Annex 10 to Working Party 4A Chairman's Report - Working document towards a preliminary draft new Report ITU-R S.[agenda item 1.5] - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz � Iran (Islamic Republic of) AI1.5 2018-02-13
[ 582 ]
Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency band 27.5-29.5 GHz � China (People's Republic of) AI1.5 2018-02-13
[ 581 ]
Draft liaison statement to Working Party 5A - Characteristics of fixed-satellite service (FSS) feederlinks (Earth-to-sapce) of a non-GSO mobile-satellite system operating in the 5 150-5 250 MHz band � China (People's Republic of) AI1.16 2018-02-13
[ 580 ]
Views and proposals on the studies of the WRC-19 agenda item 9.1, issue 9.1.2 � China (People's Republic of) AI9.1 2018-02-13
[ 579 ]
Proposal for updates to working document towards draft CPM text for WRC-19 agenda item 7, Issue A � China (People's Republic of) AI7 2018-02-13
[ 578 ]
Proposed modifications to working document towards a preliminary draft new Report ITU-R S.[50/40 GHZ ADJACENT BAND STUDIES] - Protection of EESS (passive) and RAS systems from non GSO fixed satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda item 1.6 � China (People's Republic of) AI1.6 2018-02-13
[ 577 ]
Proposed modifications to preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9 � China (People's Republic of) AI9.1 2018-02-13
[ 576 ]
Proposal for revision of the working document towards preliminary draft CPM text for WRC-19 agenda item 7, Issue G � Bulgaria (Republic of) AI7 2018-02-12
[ 575 ]
Proposals for text of Resolution YYY to the draft CPM text on method C to WRC-19 agenda item 7 - Issue G � Bulgaria (Republic of) AI7 2018-02-12
[ 574 ]
Measures to facilitate entering new assignments into the RR Appendix 30B List � Norway AI7 2018-02-12
[ 573 ]
Liaison statement reply to ITU-R Working Party 5C (copied for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - WRC-19 agenda item 1.14 � WP 5D AI1.14 2018-12-02
[ 572 ]
Proptection criteria of satellite services in sharing studies under WRC-19 agenda items 1.13, 1.14 and 1.16 and proposed [preliminary] draft revised Question ITU-R 236/4 � United Arab Emirates Q236/4 2018-02-12
[ 571 ]
Proposed revisions to the working document towards preliminary draft CPM text for WRC-19 agenda item 1.6 � Russian Federation AI1.6 2018-02-12
[ 570 ]
Draft reply liaison statement to Working Party 7A � Russian Federation 2018-02-12
[ 569 ]
Working document with proposals towards draft CPM text for WRC-19 agenda item 9.1, issue 9.1.3 � Russian Federation AI9.1 2018-02-12
[ 568 ]
Draft note to Director Radiocommunication Bureau towards the Recommendation ITU-R S.1503-3 - Suggestions for improvement of Recommedation ITU-R S.1503-3 � Russian Federation 2018-02-12
[ 567 ]
Analysis of the applicability of Resolution 156 (WRC-15) off-axis e.i.r.p. spectral density mask for WRC-19 agenda item 1.5 studies � Russian Federation AI1.5 2018-02-12
[ 566 ]
Proposals to working document towards draft CPM text for WRC-19 agenda item 7 - Issue F - � Russian Federation AI7 2018-02-12
Results:915 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2019-10-18