International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP3M : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP3M� C�

ITU-R�WP3M

Point-to-point and Earth-space propagation

Results:419 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 119 ]
Liaison statement to Working Party 5D (copied for information and action (if any) to Working Parties 4C, 5A, 6A, 7B and Task Group 5/1 and copied for information only to Working Parties 3J, 3K and 3M) - Modelling and simulation of IMT networks for use in sharing and compatibility studies � WP 4A 2016-10-06
[ 118 ]
Liaison statement to Working Parties 3K and 3M (copy for information to Working Party 5D) - Propagation data and predictions for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band � WP 4C 2016-09-29
[ 117 ]
Information document on the updated tentative meeting schedule of Study Group 3 and its Working Parties � Chairman, SG 3 2016-08-12
[ 116 ]
+Ann.1-15
Report on the meeting of Working Party 3M (Geneva, 20-29 June 2016) � Chairman, WP 3M 2016-07-04
[ 115 ]
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies � WP 5D 2016-06-30
[ 114 ]
Final list of participants - Working Party 3M (Geneva, 20-29 June 2016) � Director, BR 2016-06-30
[ 113 ]
Documents to be considered in Working Party 3M � Chairman, WP 3M 2016-06-27
[ 112 ]
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7 � WP 5D AI1.7 2016-06-24
[ 111 ]
Liaison statement to Working Party 7B (copied to Working Parties 3M, 4C, 5A, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.3 � WP 5D AI1.3 2016-06-23
[ 110 ]
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7D and 3M for information) - WRC-19 agenda item 9.1, issue 9.1.9 � WP 5D AI9.1 2016-06-23
[ 109 ]
Documents to be considered in Working Party 3M � Chairman, WP 3M 2016-06-21
[ 108 ]
Proposed revision to Recommendation ITU-R P.1812-4 - Smooth path diffraction loss �
WP 3K agreed that Document 3K/65 should also be assigned to WP 3M.
LS telcom AG 2016-06-20
[ 107 ]
(Rev.1)
Reply liaison statement to Study Group 3, Working Parties 3J, 3K, and 3M (copied for information to Task Group 5/1) - Propagation advice in support of WRC-19 agenda item 1.13: input requested from Working Party 5D � WP 5D AI1.13 2016-06-20
[ 106 ]
List of documents issued (Documents 3M/1 - 3M/106) � BR Study Groups Department 2016-06-17
[ 105 ]
Proposed modifications to the Recommendation ITU-R P.452-16 - Hydrometeor-scatter interference prediction methodology - clarification (Document re-assigned from WP 3K) � Poland (Republic of) 2016-06-17
[ 104 ]
Building entry loss measurements at 3, 10 and 17 GHz frequencies � Orange 2016-06-10
[ 103 ]
Satellite measurement data at 20 GHz from high latitude locations in Inland and maritime climates � Telenor ASA 2016-06-13
[ 102 ]
Rain rate distributions from stations with long-term measurements in Norway � Telenor ASA 2016-06-13
[ 101 ]
Information document on ESA activity to support Study Group 3 activities on digital products � European Space Agency , Czech Technical University in Prague, Faculty of Electrical Engineering 2016-06-13
[ 100 ]
Updated rainfall rate statistics for DBSG3 Table IV-1 � Spain 2016-06-13
[ 99 ]
Data pre-processing and format for Table IV-12 � Spain 2016-06-13
[ 98 ]
Use of experimental drop size distributions for rain attenuation prediction � Spain 2016-06-13
[ 97 ]
Recommendation ITU-R P.1853-1: Question about parameters for time series of scintillation � European Space Agency 2016-06-13
[ 96 ]
Atmospheric depolarisation on slant paths, modelling of ice effects, comparison with new Ka band measurements in Portugal � Portugal , European Space Agency 2016-06-13
[ 95 ]
Atmospheric characterisation at Cebreros deep-space network sites by means of ground-base radiometric measurements � European Space Agency 2016-06-13
[ 94 ]
Proposed revision to Recommendation ITU-R P.[BEL] - Proposed building entry loss model up to 40 GHz in urban environment � Japan 211/3 2016-06-13
[ 93 ]
Contributions to ITU-R Study Group 3 databanks - Slant-path attenuation and rain rate statistics (Table II-1) and statistics of rain intensity (Table IV-1) from measurements in Ljubljana � Slovenia (Republic of) , European Space Agency 2016-06-13
[ 92 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz � WP 1A 2016-06-13
[ 91 ]
Proposed revision to Recommendation ITU-R P.452-16 - Clutter loss model for below-rooftop terminals urban environments � Korea (Republic of) 2016-06-13
[ 90 ]
Proposed revision of Recommendation ITU-R P.618-12 - A new approach for the effective path-length model for rain attenuation based on rain-cell characteristics: Additional test results for rain attenuation model based on the new test protocol � Korea (Republic of) 2016-06-13
[ 89 ]
Propagation measurements in Budapest, Hungary with Alphasat TDP5/ Aldo Paraboni Scientific Experiment � Hungary , European Space Agency 2016-06-13
[ 88 ]
Update of Recommendation ITU-R P.1238 (copy to Working Groups 3M and 3J for information) � Intel Corporation 2016-06-13
[ 87 ]
Update of Recommendation ITU-R P.452 (copy to Working Parties 3K and 3J for information) � Intel Corporation 2016-06-13
[ 86 ]
SCINTEX editorial changes � European Space Agency 2016-06-13
[ 85 ]
Proposed update of Recommendation ITU-R P.676-10 - "Attenuation by atmospheric gases" � Luxembourg , Italy 2016-06-13
[ 84 ]
Proposed editorial changes in Recommendation ITU-R P.618-12 - "Propagation data and prediction methods required for the design of Earth-space telecommunication systems" � Luxembourg 2016-06-13
[ 83 ]
Update set of validation examples for Earth-space propagation prediction methods � Luxembourg 2016-06-13
[ 82 ]
Short-term weather forecasts and radio-propagation models for optimizing data volume return in Ka-band satellite-to-Earth communication links � European Space Agency , Italy 2016-06-13
[ 81 ]
Report on activity of the Correspondence Group - Building entry loss � CG 3J-3K-3M-8 2016-06-13
[ 80 ]
Proposed revision of DBSG3 Table IV-1 � France , European Space Agency , Italy , Portugal , Spain 2016-06-10
[ 79 ]
Building entry loss - Measurements in a large urban office � United Kingdom of Great Britain and Northern Ireland 2016-06-13
[ 78 ]
Contribution to ITU-R Study Group 3 databanks - Statistics of rain cell characteristics parameters derived from a meteorological radar in complex terrain � Austria 2016-06-12
[ 77 ]
Information document of Recommendation ITU-R P.452-16 - The suggestions of propagation modelling of IMT sharing and compatibility studies � China (People's Republic of) 2016-06-12
[ 76 ]
China _ 2012 model improvement and additional analysis with other rain attenuation prediction models proposed to Recommendation ITU-R P.618 and ITU-R P.530 � China (People's Republic of) 2016-06-12
[ 75 ]
Building entry loss measurement results for above 6 GHz frequency band � China (People's Republic of) 2016-06-12
[ 74 ]
A conversion model of annual statistics to worst-month statistics for troposcatter � China (People's Republic of) 2016-06-12
[ 73 ]
Measurements results of building entry loss in the 2 GHz to 60 GHz frequency range � Telefon AB - LM Ericsson 2016-06-11
[ 72 ]
On Recommendation ITU-R P.452-16: Suggestions on propagation modelling to IMT sharing and coexistence studies � Telefon AB - LM Ericsson 2016-06-11
[ 71 ]
Progressing the working document towards a preliminary draft new Recommendation ITU-R P.[BEL] "Prediction of Building Entry Loss" � Telefon AB - LM Ericsson 2016-06-11
[ 70 ]
Discussion paper: building entry loss - Statistics, modelling and MM-wave measurements � United Kingdom of Great Britain and Northern Ireland 2016-06-10
Results:419 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2019-08-23