Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 119 ]
�
� |
Liaison statement to Working Party 5D (copied for information and action (if any) to Working Parties 4C, 5A, 6A, 7B and Task Group 5/1 and copied for information only to Working Parties 3J, 3K and 3M) - Modelling and simulation of IMT networks for use in sharing and compatibility studies
�
� |
WP 4A
� |
� |
2016-10-06 |
|
[ 118 ]
�
� |
Liaison statement to Working Parties 3K and 3M (copy for information to Working Party 5D) -
Propagation data and predictions for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band
�
� |
WP 4C
� |
� |
2016-09-29 |
|
[ 117 ]
�
� |
Information document on the updated tentative meeting schedule of Study Group 3 and its Working Parties
�
� |
Chairman, SG 3
� |
� |
2016-08-12 |
|
[ 116 ]
�
+Ann.1-15� |
Report on the meeting of Working Party 3M (Geneva, 20-29 June 2016)
�
� |
Chairman, WP 3M
� |
� |
2016-07-04 |
|
[ 115 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies
�
� |
WP 5D
� |
� |
2016-06-30 |
|
[ 114 ]
�
� |
Final list of participants - Working Party 3M (Geneva, 20-29 June 2016)
�
� |
Director, BR
� |
� |
2016-06-30 |
|
[ 113 ]
�
� |
Documents to be considered in Working Party 3M
�
� |
Chairman, WP 3M
� |
� |
2016-06-27 |
|
[ 112 ]
�
� |
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7
�
� |
WP 5D
� |
AI1.7
� |
2016-06-24 |
|
[ 111 ]
�
� |
Liaison statement to Working Party 7B (copied to Working Parties 3M, 4C, 5A, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.3
�
� |
WP 5D
� |
AI1.3
� |
2016-06-23 |
|
[ 110 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7D and 3M for information) - WRC-19 agenda item 9.1, issue 9.1.9
�
� |
WP 5D
� |
AI9.1
� |
2016-06-23 |
|
[ 109 ]
�
� |
Documents to be considered in Working Party 3M
�
� |
Chairman, WP 3M
� |
� |
2016-06-21 |
|
[ 108 ]
�
� |
Proposed revision to Recommendation ITU-R P.1812-4 - Smooth path diffraction loss
�
WP 3K agreed that Document 3K/65 should also be assigned to WP 3M.
� |
LS telcom AG
� |
� |
2016-06-20 |
|
[ 107 ]
�
(Rev.1)� |
Reply liaison statement to Study Group 3, Working Parties 3J, 3K, and 3M (copied for information to Task Group 5/1) - Propagation advice in support of WRC-19 agenda item 1.13: input requested from Working Party 5D
�
� |
WP 5D
� |
AI1.13
� |
2016-06-20 |
|
[ 106 ]
�
� |
List of documents issued (Documents 3M/1 - 3M/106)
�
� |
BR Study Groups Department
� |
� |
2016-06-17 |
|
[ 105 ]
�
� |
Proposed modifications to the Recommendation ITU-R P.452-16 - Hydrometeor-scatter interference prediction methodology - clarification (Document re-assigned from WP 3K)
�
� |
Poland (Republic of)
� |
� |
2016-06-17 |
|
[ 104 ]
�
� |
Building entry loss measurements at 3, 10 and 17 GHz frequencies
�
� |
Orange
� |
� |
2016-06-10 |
|
[ 103 ]
�
� |
Satellite measurement data at 20 GHz from high latitude locations in Inland and maritime climates
�
� |
Telenor ASA
� |
� |
2016-06-13 |
|
[ 102 ]
�
� |
Rain rate distributions from stations with long-term measurements in Norway
�
� |
Telenor ASA
� |
� |
2016-06-13 |
|
[ 101 ]
�
� |
Information document on ESA activity to support Study Group 3 activities on digital products
�
� |
European Space Agency
,
Czech Technical University in Prague, Faculty of Electrical Engineering
� |
� |
2016-06-13 |
|
[ 100 ]
�
� |
Updated rainfall rate statistics for DBSG3 Table IV-1
�
� |
Spain
� |
� |
2016-06-13 |
|
[ 99 ]
�
� |
Data pre-processing and format for Table IV-12
�
� |
Spain
� |
� |
2016-06-13 |
|
[ 98 ]
�
� |
Use of experimental drop size distributions for rain attenuation prediction
�
� |
Spain
� |
� |
2016-06-13 |
|
[ 97 ]
�
� |
Recommendation ITU-R P.1853-1: Question about parameters for time series of scintillation
�
� |
European Space Agency
� |
� |
2016-06-13 |
|
[ 96 ]
�
� |
Atmospheric depolarisation on slant paths, modelling of ice effects, comparison with new Ka band measurements in Portugal
�
� |
Portugal
,
European Space Agency
� |
� |
2016-06-13 |
|
[ 95 ]
�
� |
Atmospheric characterisation at Cebreros deep-space network sites by means of ground-base radiometric measurements
�
� |
European Space Agency
� |
� |
2016-06-13 |
|
[ 94 ]
�
� |
Proposed revision to Recommendation ITU-R P.[BEL] - Proposed building entry loss model up to 40 GHz in urban environment
�
� |
Japan
� |
211/3
� |
2016-06-13 |
|
[ 93 ]
�
� |
Contributions to ITU-R Study Group 3 databanks - Slant-path attenuation and rain rate statistics (Table II-1) and statistics of rain intensity (Table IV-1) from measurements in Ljubljana
�
� |
Slovenia (Republic of)
,
European Space Agency
� |
� |
2016-06-13 |
|
[ 92 ]
�
� |
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
WP 1A
� |
� |
2016-06-13 |
|
[ 91 ]
�
� |
Proposed revision to Recommendation ITU-R P.452-16 - Clutter loss model for below-rooftop terminals urban environments
�
� |
Korea (Republic of)
� |
� |
2016-06-13 |
|
[ 90 ]
�
� |
Proposed revision of Recommendation ITU-R P.618-12 - A new approach for the effective path-length model for rain attenuation based on rain-cell characteristics: Additional test results for rain attenuation model based on the new test protocol
�
� |
Korea (Republic of)
� |
� |
2016-06-13 |
|
[ 89 ]
�
� |
Propagation measurements in Budapest, Hungary with Alphasat TDP5/ Aldo Paraboni Scientific Experiment
�
� |
Hungary
,
European Space Agency
� |
� |
2016-06-13 |
|
[ 88 ]
�
� |
Update of Recommendation ITU-R P.1238 (copy to Working Groups 3M and 3J for information)
�
� |
Intel Corporation
� |
� |
2016-06-13 |
|
[ 87 ]
�
� |
Update of Recommendation ITU-R P.452 (copy to Working Parties 3K and 3J for information)
�
� |
Intel Corporation
� |
� |
2016-06-13 |
|
[ 86 ]
�
� |
SCINTEX editorial changes
�
� |
European Space Agency
� |
� |
2016-06-13 |
|
[ 85 ]
�
� |
Proposed update of Recommendation ITU-R P.676-10 - "Attenuation by atmospheric gases"
�
� |
Luxembourg
,
Italy
� |
� |
2016-06-13 |
|
[ 84 ]
�
� |
Proposed editorial changes in Recommendation ITU-R P.618-12 - "Propagation data and prediction methods required for the design of Earth-space telecommunication systems"
�
� |
Luxembourg
� |
� |
2016-06-13 |
|
[ 83 ]
�
� |
Update set of validation examples for Earth-space propagation prediction methods
�
� |
Luxembourg
� |
� |
2016-06-13 |
|
[ 82 ]
�
� |
Short-term weather forecasts and radio-propagation models for optimizing data volume return in Ka-band satellite-to-Earth communication links
�
� |
European Space Agency
,
Italy
� |
� |
2016-06-13 |
|
[ 81 ]
�
� |
Report on activity of the Correspondence Group - Building entry loss
�
� |
CG 3J-3K-3M-8
� |
� |
2016-06-13 |
|
[ 80 ]
�
� |
Proposed revision of DBSG3 Table IV-1
�
� |
France
,
European Space Agency
,
Italy
,
Portugal
,
Spain
� |
� |
2016-06-10 |
|
[ 79 ]
�
� |
Building entry loss - Measurements in a large urban office
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2016-06-13 |
|
[ 78 ]
�
� |
Contribution to ITU-R Study Group 3 databanks - Statistics of rain cell characteristics parameters derived from a meteorological radar in complex terrain
�
� |
Austria
� |
� |
2016-06-12 |
|
[ 77 ]
�
� |
Information document of Recommendation ITU-R P.452-16 - The suggestions of propagation modelling of IMT sharing and compatibility studies
�
� |
China (People's Republic of)
� |
� |
2016-06-12 |
|
[ 76 ]
�
� |
China _ 2012 model improvement and additional analysis with other rain attenuation prediction models proposed to Recommendation ITU-R P.618 and ITU-R P.530
�
� |
China (People's Republic of)
� |
� |
2016-06-12 |
|
[ 75 ]
�
� |
Building entry loss measurement results for above 6 GHz frequency band
�
� |
China (People's Republic of)
� |
� |
2016-06-12 |
|
[ 74 ]
�
� |
A conversion model of annual statistics to worst-month statistics for troposcatter
�
� |
China (People's Republic of)
� |
� |
2016-06-12 |
|
[ 73 ]
�
� |
Measurements results of building entry loss in the 2 GHz to 60 GHz frequency range
�
� |
Telefon AB - LM Ericsson
� |
� |
2016-06-11 |
|
[ 72 ]
�
� |
On Recommendation ITU-R P.452-16: Suggestions on propagation modelling to IMT sharing and coexistence studies
�
� |
Telefon AB - LM Ericsson
� |
� |
2016-06-11 |
|
[ 71 ]
�
� |
Progressing the working document towards a preliminary draft new Recommendation ITU-R P.[BEL] "Prediction of Building Entry Loss"
�
� |
Telefon AB - LM Ericsson
� |
� |
2016-06-11 |
|
[ 70 ]
�
� |
Discussion paper: building entry loss - Statistics, modelling and MM-wave measurements
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2016-06-10 |
Results:419 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):