International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5D : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5D� C�

ITU-R�WP5D

IMT Systems

Results:1064 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 764 ]
Liaison statement on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ) � ITU-T SG 9 2014-09-30
[ 763 ]
Proposals on the working document of Handbook on Global Trends in IMT - ITU-R M.[IMT/HANDBOOK] � China (People's Republic of) 2014-09-30
[ 762 ]
Proposals on the revision of Recommendation ITU-R M.1036-4 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications (IMT) in the bands identified for IMT in the Radio Regulations (RR) � China (People's Republic of) 2014-09-30
[ 761 ]
Draft liaison statement to Working Party 4C - Preliminary draft revision of Recommendation ITU-R M.1036-4 � China (People's Republic of) 2014-09-30
[ 760 ]
Draft liaison statement to Working Party 4B - Working document towards a Handbook on Global Trends in IMT - ITU-R M.[IMT/HANDBOOK] � China (People's Republic of) 2014-09-30
[ 759 ]
Proposed revisions to the working document towards a preliminary draft new Report ITU-R M.[IMT.VISION] - IMT Vision - "Framework and overall objectives of the future development of IMT for 2020 and beyond" � China (People's Republic of) 2014-09-30
[ 758 ]
Proposed modifications to summary of ITU-R M.[FUTURE TECHNOLOGY TRENDS] for SWG Vision � Huawei Technologies Co. Ltd. 2014-09-30
[ 757 ]
Discussion on energy efficiency and the requirement for future IMT � China (People's Republic of) 2014-09-30
[ 756 ]
Proposed updates on the working document towards a preliminary draft new Report on coexistence of two TDD networks in the 2 300-2 400 MHz band � China (People's Republic of) 2014-09-30
[ 755 ]
Proposed modifications to the working document towards a preliminary draft new Report ITU-R [IMT.ANTENNA] - Passive and active antenna for base stations of IMT systems � China (People's Republic of) 2014-09-30
[ 754 ]
Proposal on the draft Report ITU-R M.[IMT.BEYOND2020.TRAFFIC] � China (People's Republic of) 2014-09-30
[ 753 ]
Principles for drawing capabilities diagram of "IMT-2020" � China (People's Republic of) 2014-09-30
[ 752 ]
Proposed revisions to working document towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 6 GHZ] � Huawei Technologies Co. Ltd. 2014-09-29
[ 751 ]
Proposed revisions to working document towards a preliminary draft new Report M.[IMT.SMALL CELL] � Huawei Technologies Co. Ltd. , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , DaTang Telecommunication Technology & Industry Holding Co. Ltd , ZTE Corporation 2014-09-29
[ 750 ]
Proposal on the revision of Recommendation ITU-R M.1036-4 � SG 4 2014-09-24
[ 749 ]
Views on WirelessMAN-Advanced OOBE � Institute of Electrical and Electronics Engineers, Inc. 2014-09-17
[ 748 ]
Correspondence Group to develop a harmonized figure(s) and contents of Chapter 4.3 of the PDNR Recommendation ITU-R M.[IMT.VISION] based on the identified capabilities � CG IMT.VISION 2014-09-17
[ 747 ]
Transposition references for draft Revision 12 of Recommendation ITU-R M.1457 � Director, BR 2014-09-17
[ 746 ]
Liaison statement to Working Party 5D - Sharing studies at 3 400-3 600 MHz - Advice on building loss � WPs 3J, 3K and 3M 2014-09-12
[ 745 ]
Liaison statement to Working Party 5D - Propagation related matters regarding the technical feasibility of IMT in the bands above 6 GHz � WPs 3J, 3K and 3M 2014-09-12
[ 744 ]
(Rev.1)
Transposition references for draft revision 12 of Recommendation ITU-R M.1457 (TTC) � Director, BR 2014-09-09
[ 743 ]
Proposed documents structure for: IMT Vision "Framework and overall objectives of the future development of IMT for 2020 and beyond" � United Kingdom of Great Britain and Northern Ireland 2014-09-09
[ 742 ]
Transposition references for draft revision 12 of Recommendation ITU-R M.1457 (ARIB) � Director, BR 2014-09-09
[ 741 ]
(Rev.1)
Results of the 21th RAG meeting � Chairman, SG 5 2014-08-27
[ 740 ]
Transposition references for draft revision 12 of Recommendation ITU-R M.1457 (ETSI) � European Telecommunications Standards Institute 2014-08-21
[ 739 ]
Transposition references for draft revision 12 of Recommendation ITU-R M.1457 (TIA) � Director, BR 2014-08-21
[ 738 ]
Reply liaison statement informing about MEF 22.1 and MEF 22.1.1 - Mobile backhaul implementation agreement � Director, BR 2014-08-25
[ 737 ]
Transposition references for draft Revision 12 of Recommendation ITU-R M.1457 � Alliance for Telecommunications Industry Solutions 2014-08-15
[ 736 ]
TDMA-SC architecture information for M.[IMT.ARCH] in response to liaison from Working Party 5D � Alliance for Telecommunications Industry Solutions 2014-08-14
[ 735 ]
Transposition references for draft Revision 12 of Recommendation ITU-R M.1457 (TTA) � Director, BR 2014-08-14
[ 734 ]
Response to liaison statement to external organizations architecture and topology of IMT networks � Alcatel-Lucent USA Inc. , Qualcomm, Inc. 2014-08-07
[ 733 ]
Liaison statement on new areas for study under IMT � ITU-T SG 13 2014-07-28
[ 732 ]
Reply liaison statement on Recommendation ITU-R F.1105-3 and ITU-R M.[IMT.HANDBOOK] � ITU-T SG 13 2014-07-28
[ 731 ]
Reply liaison statement on collaboration between ITU-T Study Group 13 and ITU-R Working Party 5D on IMT Standardization � ITU-T SG 13 2014-07-28
[ 730 ]
Liaison statement on development of the Roadmap on IMT � ITU-T SG 13 2014-07-28
[ 729 ]
Liaison statement to Working Party 5D (copy for information to Working Party 4C and Study Group 4) - Work progress on development of Handbook on Global Trends in IMT - ITU-R M.[IMT/HANDBOOK] � WP 4B 2014-07-07
[ 728 ]
Initial response to liaison statement to external organizations on technical feasibility of IMT in the bands above 6 GHz � Industrial Technology Research Institute, Inc. (ITRI) 2014-06-30
[ 727 ]
Liaison statement to Working Party 5D (copy for information to Working Party 4B and Study Group 4) - Proposal on the revision of Recommendation ITU-R M.1036-4 � WP 4C 2014-06-27
[ 726 ]
+Ch.1-7
Report on the nineteenth meeting of Working Party 5D (Halifax, Canada, 18-25 June 2014) � Chairman, WP 5D 2014-06-27
[ 725 ]
Final list of participants - Working Party 5D (Halifax, Canada, 18-25 June 2014) � Director, BR 2014-06-26
[ 724 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities � WP 1B 2014-06-19
[ 723 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D (copy to Working Parties 1B and 1C) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems � WP 1A 2014-06-19
[ 722 ]
Update on standards activities � Region 2 Rapporteur 2014-06-17
[ 721 ]
(Rev.1)
Activities related to IMT in Region 3 � Region 3 Rapporteur 2014-06-17
[ 720 ]
Reply liaison statement to Working Party 5D - Propagation models to be used in sharing studies between the fixed satellite service and small cell deployment of IMT systems in the frequency band 3 400-3 600 MHz � Chairmen, WPs 3K and 3M 2014-06-13
[ 719 ]
Proposals for update of working document towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 6 GHZ] � Telefon AB - LM Ericsson 2014-06-11
[ 718 ]
Proposed revisions to the working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION] - IMT Vision - "Framework and overall objectives of the future development of IMT for 2020 and beyond" � Nokia Solutions and Networks Oy , Nokia Corporation 2014-06-11
[ 717 ]
Proposal for harmonised 700 MHz band-plan in Region 1 � Alcatel-Lucent International , E-Plus Mobilfunk GmbH & Co. KG , Nokia Corporation , Nokia Solutions and Networks Oy , Orange , Telef�nica, S.A. , TeliaSonera AB 2014-06-11
[ 716 ]
Current use of IMT spectrum � Norddeutscher Rundfunk (NDR) , Zweites Deutsches Fernsehen (ZDF) 2014-06-11
[ 715 ]
Proposals for the framework Chapter of preliminary draft new Recommendation ITU-R M.[IMT.VISION] � Telefon AB - LM Ericsson 2014-06-11
Results:1064 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2021-01-11