International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient orbit/spectrum utilization for FSS and BSS

Results:609 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 309 ] �
Draft revision of Recommendation ITU-R BO.1776 - Reference power flux-density for the broadcasting-satellite service in the band 21.4-22.0 GHz in Regions 1 and 3 � Korea (Republic of) 2010-03-05
[ 308 ]
WRC Agenda item 8.1.3 � Nigeria (Federal Republic of) 2010-03-04
[ 307 ]
Comments on the proposed treatment of recommendations of former Working Party 6S � BR Study Group Department 2010-03-03
[ 306 ]
Proposed draft response liaison statement to Working Party 7B - Parameters for use in conducting compatibility assessment of SRS (E-s) into HIBLEO-2 ISS in the band 22.55-23.15 GHz � Australia 2010-03-02
[ 305 ]
Emergency and disaster relief telecommunications in Haiti � United States of America 2010-03-01
[ 304 ]
ABU views on WRC-12 Agenda items 1.5 and 1.13 � Asia-Pacific Broadcasting Union (ABU) 2010-02-26
[ 303 ]
ITU/IDA Workshop on the efficient use of the spectrum/orbit resource (Singapore, 16-17 June 2010) � Director, BR 2010-03-01
[ 302 ]
Draft Liaison statement to Working Parties 4A, 4C, 5A, and 6A (copy to Working Parties 5B, 5C, 7A, 7B, 7C and Study Group 3) on WRC-12 Agenda item 1.2 � WP 1B 2010-02-17
[ 301 ]
Liaison statement to Working Parties 1B, 3K, 4A, 5A, 5D, 6A and 7C � WP 1A 2010-02-12
[ 300 ]
+Corr.1
Additional information for the preparation of the draft CPM Report to WRC-12 � Chairman, CPM-11 2010-01-22
[ 299 ]
Liaison statement - Characteristics for gateway links for high altitude platform stations (HAPS) in frequency bands 5 850-7 075 MHz for use in sharing studies (WRC-12 Agenda item 1.20) � WP 5C 2009-12-17
[ 298 ]
Liaison statement - Review of certain SF-series Recommendations � WP 5C 2009-12-17
[ 297 ]
Liaison statement on WRC-12 Agenda item 7 � SC-WP 2009-12-16
[ 296 ]
Reply liaison statement to ITU-R Working Party 4A - Performance requirements for unmanned aircraft systems � WP 5B 2009-12-14
[ 295 ]
Liaison statement to Working Party 1A (copy to Working Party 4A) - WRC-12 Agenda item 1.22 � WP 6A 2009-12-08
[ 294 ]
Liaison statement to Working Party 4A - Compatibility of broadband wireless access systems and fixed-satellite service networks in the 3 400-4 200 MHz band � WP 5A 2009-12-08
[ 293 ]
Liaison statement - Future revision of Recommendation ITU-R SF.675-2 � WP 5C 2009-12-08
[ 292 ]
Liaison statement to Working Party 4A on WRC-12 Agenda item 1.13 (copy to WP 5A for information) � WP 5C 2009-12-08
[ 291 ]
Liaison statement to Working Party 4A (copy to Working Party 7B) - Considerations on protection criteria for NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11 � WP 5C 2009-12-08
[ 290 ]
Liaison statement to Working Party 4A - Requirements for broadcasting-satellite service in the band 21.4-22 GHz in Regions 1 and 3 under WRC-12 Agenda item 1.13 � WP 6B 2009-12-08
[ 289 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7D and to the Working Party of the Special Committee - WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems � WP 5C 2009-12-04
[ 288 ]
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 6A, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems � WP 6B 2009-11-20
[ 287 ]
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 5C, 6B, 6C, 7B and 7D for information) - Studies on WRC-12 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems. � WP 6A 2009-11-20
[ 286 ]
Note from the Chairman of Working Party 5D to the Chairman of Study Group 4 (copy to the Chairman of Working Party 4A and the Chairman of Study Group 5) - Comments on draft new Recommendation ITU-R S.[IMT-PFD] � WP 5D 2009-11-09
[ 285 ]
Liaison statement to Working Party 3M (copy for information to Working Party 4A) - Development of a Handbook on propagation information for the prediction of interference and coordination distance � WP 5D 2009-11-06
[ 284 ]
Liaison statement to ITU-R Study Group 3 and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D on the progress of WRC-12 Agenda item 1.19 � WP 1B 2009-10-12
[ 283 ]
Liaison statement to Working Parties 1B, 3K, 4A, 5A, 5D, 6A and 7C - WRC-12 Agenda item 1.22 � WP 1A 2009-10-09
[ 282 ]
ABU views on WRC-12 Agenda items 1.4, 1.13, 1.19, 1.22, 1.25 � Asia-Pacific Broadcasting Union (ABU) 2009-09-29
[ 281 ]
Liaison statement to Working Party 4A - Protection of HIBLEO-2 inter-satellite service (ISS) links in the band 23.15 to 23.55 GHz from unwanted emissions from space research service (SRS) Earth-to-space transmissions below 23.15 GHz � WP 7B 2009-09-29
[ 280 ]
Liaison statement to ITU-R Working Parties 4A, 5A, and 5C on WRC-12 Agenda item 1.12 � WP 7B 2009-09-29
[ 279 ]
Liaison statement to Working Party 4A (copy to Working Party 5C for information) - Request for advice on parameters needed for compatibility studies between NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11 � WP 7B 2009-09-28
[ 278 ]
+Ann.1-19
Report on the meeting of Working Party 4A (Geneva, 9 - 18 September 2009) � Chairman, WP 4A 2009-09-18
[ 277 ]
(Rev.1)
Final List of Participants - Geneva, 9-18 September 2009 � Director, BR 2009-09-18
[ 276 ]
Draft list of terminology on emergency telecommunications � WP 4B 2009-09-11
[ 275 ]
Liaison statement to Working Party 4A - Radio astronomy issues related to WRC-12 Agenda item 1.13 � WP 7D 2009-09-11
[ 274 ]
Liaison statement to Working Parties 4A and 4B - Draft new Recommendation ITU-R M.[MOBDIS] and draft new Report ITU-R M.[REP-MOBDIS] - Use of mobile-satellite service (MSS) in disater reponse and relief � WP 4C 2009-09-09
[ 273 ]
Liaison statement to Working Party 4A - Information for studies related to WRC-12 Agenda item 1.25 � WP 4C 2009-09-09
[ 272 ]
List of documents issued � BR Study Group Department 2009-09-08
[ 271 ]
Working document towards draft CPM text for WRC-12 Agenda item 7 - Methods to satisfy Agenda item 7 to address coordination, notification and recording of complementary ground components of integrated MSS systems ("Integrated MSS systems) operating in the bands 1 525-1 559 MHz and 1 626.5-1 660.5 MHz � United States of America 2009-09-02
[ 270 ]
Working document toward a preliminary draft new Recommendation - An analytical methodology to evaluate interference into NGSO-TO-NGSO ISS in the range 20-30 GHz from the emissions of SRS earth stations � Access Partnership Limited 2009-09-02
[ 269 ]
Feederlink bands for the 21.4-22 GHz BSS band in Regions 1 and 3 (WRC-12 Agenda item 1.13) � Telenor ASA 2009-09-02
[ 268 ]
Working document towards the development of draft CPM text on WRC-12 Agenda item 1.13 � Telenor ASA 2009-09-02
[ 267 ]
Proposal for a draft revision of Annex 21 to Working Party 4A Chairman's Report - Working document towards draft CPM text on WRC-12 Agenda item 1.13 � Sweden 2009-09-02
[ 266 ]
Evolution of Recommendation ITU-R SF.675-3 - Calculation of the maximum power density (averaged over 4 kHz) of an angle-modulated carrier � France 2009-09-02
[ 265 ]
Protection of geostationary FSS satellite receivers in the band 5 850-7 075 MHz (WRC-12 Agenda item 1.20) � France 2009-09-02
[ 264 ]
Working document - Coordination arc between geostationary-satellite orbit broadcasting-satellite service networks in the frequency band 21.4 - 22 GHz (WRC-12 Agenda item 1.13) � France 2009-09-02
[ 263 ]
Haps gateway links in the 5 850-7 075 MHz band (WRC-12 Agenda item 1.20) � Asia Satellite Telecommunications Co. Ltd. 2009-09-02
[ 262 ]
Harmonization of electronic news gathering in the satellite frequency bands (WRC-12 Agenda item 1.5) � Asia Satellite Telecommunications Co. Ltd. 2009-09-02
[ 261 ]
Draft liaison statement to Working Party 5A - Compatibility of broadband wireless access systems and fixed-satellite service networks in the 3 400-4 200 MHz band � SES NEW SKIES 2009-09-02
[ 260 ]
Spectrum use and spacecraft design complexity due to imbalance in the existing FSS spectrum allocations in ITU Region 2 and Region 3 in the 10-15 GHz band � SES NEW SKIES 2009-09-02
Results:609 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2011-04-12