Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 248 ]
�
� |
Liaison statement to WP's 4A, 6S and 8D - Satellite unwanted emission levels
�
� |
TG 1/7
� |
� |
2001-10-03 |
|
[ 247 ]
�
� |
Liaison statement to Working Party 4A - Measurement of GSO satellite unwanted emissions
�
� |
TG 1/7
� |
� |
2001-10-03 |
|
[ 246 ]
�
� |
The role of Recommendations in the development of regulatory procedures for the application of operational efpd limits
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2001-10-03 |
|
[ 245 ]
�
� |
Statistical evaluation of the interference from the Region 1 & 3 BSS plan to the Region 2 & 3 FSS based on several sharing criteria
�
� |
France
� |
� |
2001-10-03 |
|
[ 244 ]
�
� |
Agenda item 1.29 - Resolution 78 - Further consideration and proposed CPM text
�
� |
France
� |
� |
2001-10-03 |
|
[ 243 ]
�
� |
Agenda item 1.19 - Resolution 78 - Further considerations and proposed CPM text
�
� |
France
� |
� |
2001-10-03 |
|
[ 242 ]
�
� |
Definitions relating to high elliptical orbits for communication satellites
�
� |
Russian Federation
� |
� |
2001-10-03 |
|
[ 241 ]
�
� |
Super-geosynchronous satellite orbit systems 48 hr orbit
�
� |
Israel (State of)
� |
� |
2001-10-03 |
|
[ 240 ]
�
� |
Interference between BSS feeder-link transmitting earth stations and HDFSS receiving earth stations in the band 17.3-17.7 GHz
�
� |
France
� |
� |
2001-10-03 |
|
[ 239 ]
�
� |
Initial considerations on the regulatory aspects of HEO satellite systems (WRC-03 Agenda item 1.37)
�
� |
France
� |
� |
2001-10-03 |
|
[ 238 ]
�
� |
Considerations on the possible allocation of the band 17.3-17.7 GHz to the fixed-satellite service (space-to-Earth)
�
� |
France
� |
� |
2001-10-03 |
|
[ 237 ]
�
� |
Current regulatory situation of HD-FSS earth stations in bands shared with equal rights between FSS and terrestrial services or space service operating in the opposite direction of transmission
�
� |
France
� |
� |
2001-10-03 |
|
[ 236 ]
�
� |
Proposed revisions to PDNR ITU-R S.[ESV-CHARACTERISTICS]
�
� |
Inmarsat
� |
� |
2001-10-03 |
|
[ 235 ]
�
� |
Comments in responses to Circular Letter CAR/109
�
� |
BR Secretariat
� |
� |
2001-10-03 |
|
[ 234 ]
�
� |
Updating of certain maintained S-series and SNG-series Recommendations
�
� |
BR Secretariat
� |
� |
2001-10-03 |
|
[ 233 ]
�
� |
About automation of the satellite network examinations
�
� |
Bulgaria (Republic of)
� |
� |
2001-10-03 |
|
[ 232 ]
�
� |
The efficient spectrum/orbit utilization in the international regulatory environment with satellite filling backlog
�
� |
Bulgaria (Republic of)
� |
� |
2001-10-03 |
|
[ 231 ]
�
� |
Proposed draft structure for Chapter 4 of the CPM Report to WRC-03 including already developed preliminary draft text elements
�
� |
Chapter Rapporteur
� |
� |
2001-10-03 |
|
[ 230 ]
�
� |
Liaison statement to WPs 4A, 7C 8B, 8D and JRG 8A-9B - Sharing between altimeters operating in the Earth Exploration-Satellite Service (Active) and other services in the band 5 140-5 250 MHz
�
� |
JTG 4-7-8-9
� |
� |
2001-10-03 |
|
[ 229 ]
�
� |
Liaison statement to WP 8B, WP 7C, WP 4A and JRG 8A-9B
�
� |
JTG 4-7-8-9
� |
� |
2001-10-03 |
|
[ 228 ]
�
� |
Liaison statement to WP 7B and 4A on consideration of an analysis on the possible extension of the SRS co-primary 6 MHz band allocation under S5.503 by 4 MHz in the band 13.75-13.8 GHz
�
� |
JTG 4-7-8
� |
� |
2001-10-03 |
|
[ 227 ]
�
� |
Liaison statement to WP 4-9S and WP 4A- Satellite downlink fading
�
� |
WP 3M
� |
� |
2001-10-03 |
|
[ 226 ]
�
� |
Liaison statement to WP 4A concerning propagation aspect of the determination of coordination distance
�
� |
WP 3M
� |
� |
2001-10-03 |
|
[ 225 ]
�
� |
Liaison statement to ITU-R Working Parties 4A and 4B - Duration of fades and mean time between fades on satellite paths
�
� |
WPs 3J and 3M
� |
� |
2001-10-03 |
|
[ 224 ]
�
� |
Liaison statement to Working Party 4A concerning propagation models for use in simulation of GSO-non-GSO sharing scenarios
�
� |
WPs 3J and 3M
� |
� |
2001-10-03 |
|
[ 223 ]
�
� |
Liaison statement to WP 4A concerning frequency sharing between GSO FSS networks and non-GSO FSS systems in the frequency bands 47.2-50.2 GHz and 37.5-42.5 GHz
�
� |
WP 3M
� |
� |
2001-10-03 |
|
[ 222 ]
�
� |
Liaison statement to Working Parties 1A and 4A - Automation of Article S5 and other relevant RR provisions
�
� |
WP 8D
� |
� |
2001-10-03 |
|
[ 221 ]
�
� |
Liaison statement to WPs 4A, 7C, 7D and 7E - Elements for proposed preliminary CPM text regarding non-GSO MSS feeder-link allocations near 1.4 GHz
�
� |
WP 8D
� |
� |
2001-10-03 |
|
[ 220 ]
�
� |
Liaison statement to WPs 6S, 7D, 4A and TG 1/7 concerning Development of the EPFD methodology for modelling interference by non-GSO satellite systems to stations in the radio astronomy service
�
� |
WP 8D
� |
� |
2001-10-03 |
|
[ 219 ]
�
� |
Liaison statement to Working Parties 4A and 8F - convergence between MSS and ESS for the satellite component of IMT-2000
�
� |
WP 8D
� |
� |
2001-10-03 |
|
[ 218 ]
�
(Rev.1)� |
Liaison statement to Working Party 4A - Response to liaison statement from Working Party 4A regarding agenda item 1.11 of WRC-03
�
� |
WP 8D
� |
� |
2001-10-03 |
|
[ 217 ]
�
(Rev.1)� |
Part 1 Chairman's Report from the meeting of WP 4A - Seattle, 23 April to 2 May 2001
�
� |
Chairman, WP 4A
� |
� |
2001-10-03 |
|
[ 216 ]
�
� |
Draft liaison statement to WP 4A and TG 1/7 concerning Characteristics of radio astronomy receivers relevant to the rejection of emissions in adjacent and nearby bands
�
� |
WP 7D
� |
� |
2001-10-03 |
|
[ 215 ]
�
� |
Liaison statement to WP 4A
�
� |
WP 7B
� |
� |
2001-10-03 |
|
[ 214 ]
�
� |
Liaison statement to WPs 7E and 4A - Draft CPM text addressing the feasibility of sharing between the space research service (Deep space) and the inter-satellite service in the band 32.0-32.3 GHz
�
� |
WP 7B
� |
� |
2001-10-03 |
|
[ 213 ]
�
� |
Working document towards a preliminary draft new Recommendation - Methodology for evaluation of interference among certain types of non-GSO FSS systems in situations where no in-line interference exists
�
� |
Japan
� |
� |
2001-10-03 |
|
[ 212 ]
�
(Rev.1)� |
Liaison statement to Working Parties 4A, 8D and Task Group 1/7 - Development of the epfd methodology for modelling interference by non-GSO satellite systems to stations in the radio astronomy service
�
� |
WP 7D
� |
� |
2001-10-03 |
|
[ 211 ]
�
� |
Liaison statement to Working Parties 4A, 7E and 8D concerning Agenda item 1.11 of WRC-03
�
� |
WP 7D
� |
� |
2001-10-03 |
|
[ 210 ]
�
� |
Non-GSO orbital parameters necessary to unambiguously define the active service arc for HEO-type system
�
� |
Japan
� |
� |
2001-10-03 |
|
[ 209 ]
�
� |
Liaison statement to WPs 4A, 8B, 8D and JTG 4-7-8-9 - Sharing between altimeters operating in the earth exploration-satellite service (Active) and other services in the band 5 140-5 250 MHz
�
� |
WP 7C - WG 1
� |
� |
2001-10-03 |
|
[ 208 ]
�
� |
Frequency sharing between non-GSO FSS systems using "highly elliptical orbits" and GSO FSS networks
�
� |
Japan
� |
� |
2001-10-03 |
|
[ 207 ]
�
� |
Proposed revision of Recommendation ITU-R S.727
�
� |
Japan
� |
� |
2001-10-03 |
|
[ 206 ]
�
� |
Proposed addition to Recommendation ITU-R S.1257
�
� |
Japan
� |
� |
2001-10-03 |
|
[ 205 ]
�
� |
Some considerations relating to the design and operation of HEO systems
�
� |
Japan
� |
� |
2001-10-03 |
|
[ 204 ]
�
� |
Continuous curves of epfd
�
� |
Japan
� |
� |
2001-10-03 |
|
[ 203 ]
�
� |
Electronic databank of FSS system characteristics
�
� |
Japan
� |
� |
2001-10-03 |
|
[ 202 ]
�
� |
Information for reply liaison statement to Joint Working Party 4-9S on PDNR [HAPS-FSS] - Methodology for interference evaluation, technical parameters and operational techniques for frequency sharing between the fixed service using high ...
�
� |
Japan
� |
� |
2001-10-03 |
|
[ 201 ]
�
� |
Proposed draft CPM text for the WRC-03 Agenda item 1.6
�
� |
France
� |
� |
2001-10-03 |
|
[ 200 ]
�
� |
Liaison Statement to WP 4-9S, for action, and WP 4A for information - Potential degradation of performance due to the use of dynamic channel assignment in broadband satellite transmission systems
�
� |
WP 4B
� |
� |
2001-10-03 |
|
[ 199 ]
�
� |
Report on Task Group 1/7 activities
�
� |
SG 4 Rapporteur to TG 1/7
� |
� |
2001-10-03 |
Results:548 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):