Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1619 ]
�
� |
Proposal of new appendix about network migration of SDTN in G.asdt
�
� |
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
� |
Q14/15, Q12/15
� |
2016-02-01 |
|
[ 1618 ]
�
� |
G.hn: Auto-Pairing mechanism
�
� |
ZTE Corporation
� |
Q18/15
� |
2016-02-01 |
|
[ 1617 ]
�
� |
Revised proposal of multi-dimensional modulation format in G.Sup.39
�
� |
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1616 ]
�
� |
Revised Proposals about the Super-Nyquist DWDM in G.sup39
�
� |
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1615 ]
�
(Rev.1)� |
Consideration and proposal on PTP event message in FlexO IrDI
�
C-1615 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
� |
ZTE Corporation
� |
Q13/15, Q11/15
� |
2016-02-01 |
|
[ 1614 ]
�
� |
Consideration and proposal on overhead format of FlexO
�
� |
ZTE Corporation
� |
Q11/15
� |
2016-02-01 |
|
[ 1613 ]
�
� |
Proposals about the scope of the G.metro
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1612 ]
�
� |
Considerations on overhead of FlexE aware client mapping method
�
� |
ZTE Corporation
� |
Q11/15
� |
2016-02-01 |
|
[ 1611 ]
�
(Rev.1)� |
Frequency error test results - CPRI over ODU2r
�
C-1611 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
� |
IP Light
� |
Q13/15, Q11/15
� |
2016-02-01 |
|
[ 1610 ]
�
� |
EVM related results and proposal of G.698.2
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1609 ]
�
� |
Proposals about centralized recovery for SDN controlled transport network
�
� |
China Telecommunications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co., Ltd.
,
ZTE Corporation
� |
Q9/15, Q14/15, Q12/15
� |
2016-02-01 |
|
[ 1608 ]
�
� |
Application code proposal in G.metro
�
� |
ADVA Optical Networking
,
China Unicom
,
Ericsson Canada, Inc.
,
Finisar Corporation
,
Huawei Technologies Co., Ltd.
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1607 ]
�
� |
Consideration of information between HEE and TEE in G.metro
�
� |
China Unicom
� |
Q6/15, Q14/15
� |
2016-02-01 |
|
[ 1606 ]
�
� |
Proposal of parameters for G.654.E fibre category
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q6/15, Q5/15
� |
2016-02-01 |
|
[ 1605 ]
�
� |
Short reach application codes and AWG requirement in G.metro
�
� |
China Unicom
,
Ericsson Canada, Inc.
,
Finisar Corporation
,
ZTE Corporation
� |
Q7/15, Q6/15
� |
2016-02-01 |
|
[ 1604 ]
�
� |
Field trials and proposal of G.654 for terrestrial application
�
� |
China Unicom
,
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
,
OFS Fitel, LLC
� |
Q6/15, Q5/15
� |
2016-02-01 |
|
[ 1603 ]
�
(Rev.1)� |
The requirement of Yang module in MPLS-TP
�
C-1603 Rev.1 adds Q14/15 as a destination Question. There is no change to the content of the Contribution.
� |
FiberHome Technologies Group
� |
Q14/15, Q10/15
� |
2016-02-01 |
|
[ 1602 ]
�
� |
The consideration of interworking between OTUC1 and OTU4
�
� |
FiberHome Technologies Group
� |
Q11/15
� |
2016-02-01 |
|
[ 1601 ]
�
� |
Proposal to the centralized restoration for G.asdtn and HRM
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q9/15, Q14/15, Q12/15
� |
2016-02-01 |
|
[ 1600 ]
�
(Rev.1)� |
The suggestion about multichannel parallel interfaces in B100G
�
C-1600 Rev.1 adds Q6/15 as a destination Question. There is no change to the content of the Contribution.
� |
FiberHome Technologies Group
� |
Q6/15, Q11/15
� |
2016-02-01 |
|
[ 1599 ]
�
� |
Proposals to clause 7.3 of G.asdtn on multi-layer and multi-domain control
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q14/15, Q12/15
� |
2016-02-01 |
|
[ 1598 ]
�
� |
G.vlc: requirements on Data link layer per uplink mode
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q18/15
� |
2016-02-01 |
|
[ 1597 ]
�
� |
G.vlc: Simulation results on DCO-OFDM and ACO-OFDM
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q18/15
� |
2016-02-01 |
|
[ 1596 ]
�
� |
Proposed modification of ASTAP input on disaster management
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2016-02-01 |
|
[ 1595 ]
�
� |
Test results and discussion of the EVM metrics
�
� |
CAICT, P.R.China
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1594 ]
�
� |
Proposed description on MDRU size consideration
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2016-02-01 |
|
[ 1593 ]
�
� |
100G system in-service OSNR monitoring and embedded OTDR test
�
� |
AICT, P.R.China
,
China Mobile Communications Corporation
,
ZTE Corporation
� |
Q6/15
� |
2016-02-01 |
|
[ 1592 ]
�
(Rev.1-2)� |
Propose SG15 to start pre-research project on IMT2020 Mobile back haul and front haul network
�
� |
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
� |
Q6/15, Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
� |
2016-02-01 |
|
[ 1591 ]
�
� |
Promote the progress of G.MDSP to address operators' urgent needs
�
� |
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
� |
Q9/15
� |
2016-02-01 |
|
[ 1590 ]
�
� |
Consideration in defining data model for transport network
�
� |
Fujitsu Limited
� |
Q14/15
� |
2016-02-01 |
|
[ 1589 ]
�
� |
Consideration in progressing LTP and LP in for transport network
�
� |
Fujitsu Limited
� |
Q14/15
� |
2016-02-01 |
|
[ 1588 ]
�
� |
Updated SDL diagrams for G.806
�
� |
Fujitsu Limited
� |
Q11/15
� |
2016-02-01 |
|
[ 1587 ]
�
� |
Counter processes text for G.8121.1
�
� |
Fujitsu Limited
� |
Q10/15
� |
2016-02-01 |
|
[ 1586 ]
�
� |
Comments on G.8121
�
� |
Fujitsu Limited
� |
Q10/15
� |
2016-02-01 |
|
[ 1585 ]
�
� |
Terminology for traffic shaping function
�
� |
Fujitsu Limited
� |
Q3/15, Q14/15, Q10/15
� |
2016-02-01 |
|
[ 1584 ]
�
� |
Update of G.709 Appendix VII
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2016-01-31 |
|
[ 1583 ]
�
� |
Reconsideration of G.709 Appendix XII - OTLC.4 Structure
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2016-01-31 |
|
[ 1582 ]
�
� |
New Ethernet Rates and impact on OTN standardization
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2016-01-31 |
|
[ 1581 ]
�
� |
Clarification of ODU SMP Bridge and Selector Operation
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2016-01-31 |
|
[ 1580 ]
�
� |
Proposal of electrical performance for revision of recommendation L.60
�
� |
FiberHome Technologies Group
� |
Q16/15
� |
2016-01-31 |
|
[ 1579 ]
�
� |
Revision proposal for Appendix I Chinese experience of recommendation L.60
�
� |
FiberHome Technologies Group
� |
Q16/15
� |
2016-01-31 |
|
[ 1578 ]
�
� |
Propose to include pilot-tone auxiliary channel protocol as the G.ROF PON adaptation function
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2016-01-31 |
|
[ 1577 ]
�
� |
Comparison of three technical approaches of PON adaptation function in G.ROF
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2016-01-31 |
|
[ 1576 ]
�
� |
Comments on Clauses 5 and 6 of draft revised Recommendation G.872
�
� |
Alcatel-Lucent USA Inc.
� |
Q12/15
� |
2016-01-31 |
|
[ 1575 ]
�
� |
Proposal re Clause 11 of draft revised Recommendation G.872
�
� |
Alcatel-Lucent USA Inc.
� |
Q12/15
� |
2016-01-31 |
|
[ 1574 ]
�
� |
Proposed new material for media element in G.798
�
� |
Coriant GmbH & Co. KG
,
ZTE Corporation
� |
Q6/15, Q14/15, Q12/15, Q11/15
� |
2016-01-29 |
|
[ 1573 ]
�
� |
Proposed new material for OSC layer in G.798
�
� |
Coriant GmbH & Co. KG
� |
Q11/15
� |
2016-01-29 |
|
[ 1572 ]
�
� |
Proposed changes to clause 12/G.798
�
� |
Coriant GmbH & Co. KG
� |
Q11/15
� |
2016-01-29 |
|
[ 1571 ]
�
� |
Proposed changes to clause 11/G.798
�
� |
Coriant GmbH & Co. KG
� |
Q11/15
� |
2016-01-29 |
|
[ 1570 ]
�
� |
Proposed changes to clauses 9 and 10/G.798
�
� |
Coriant GmbH & Co. KG
� |
Q11/15
� |
2016-01-29 |
Resultats:371 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):