Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1383 ]
�
� |
Draft working document on sharing and compatibility studies of IMT systems in the frequency band 7 125-8 400 MHz
�
� |
Egypt (Arab Republic of)
� |
� |
2024-06-13 |
|
[ 1382 ]
�
� |
Draft working document on sharing and compatibility studies of IMT systems in the frequency band 4 400-4 800 MHz
�
� |
Egypt (Arab Republic of)
� |
� |
2024-06-13 |
|
[ 1381 ]
�
� |
Draft document on sharing and compatibility studies of IMT systems in the frequency band 14.8-15.35 GHz
�
� |
Egypt (Arab Republic of)
� |
� |
2024-06-13 |
|
[ 1380 ]
�
� |
Calculation of pfd limits for protection of terrestrial IMT under WRC-27 AI 1.13
�
� |
Germany (Federal Republic of)
� |
� |
2024-06-13 |
|
[ 1379 ]
�
� |
Proposed draft reply liaison statement to Working Party 4C concerning WRC-27 agenda item 1.13
�
� |
Japan
� |
� |
2024-06-13 |
|
[ 1378 ]
�
� |
Proposed working document on frequency arrangements used for terrestrial IMT systems in the frequency ranges between 694/698 MHz and 2.7 GHz concerning WRC-27 agenda item 1.13
�
� |
Japan
� |
� |
2024-06-13 |
|
[ 1377 ]
�
� |
Proposals on working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27
�
� |
Japan
� |
� |
2024-06-13 |
|
[ 1376 ]
�
� |
Proposal on a draft reply liaison statement to Working Parties 4C and 7B for WRC-27 agenda items 1.12, 1.13, 1.14, 1.15
�
� |
Japan
� |
� |
2024-06-13 |
|
[ 1375 ]
�
� |
Proposal to finalize the work on draft revision of Recommendation ITU-R M.1036-7
�
� |
Japan
� |
� |
2024-06-13 |
|
[ 1374 ]
�
� |
Proposals to working document of document IMT-2030/2 "Process: submission, evaluation process and consensus building for IMT-2030"
�
� |
Japan
� |
� |
2024-06-13 |
|
[ 1373 ]
�
� |
Proposals to working document towards a preliminary draft new Recommendations ITU-R M.[IMT-2020.UNWANT.BS] and M.[IMT-2020.UNWANT.MS]
�
� |
Japan
� |
� |
2024-06-13 |
|
[ 1372 ]
�
� |
Proposals to working document toward preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] on "4.10 Positioning"
�
� |
Japan
� |
� |
2024-06-13 |
|
[ 1371 ]
�
� |
Proposals to working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
�
� |
Japan
� |
� |
2024-06-13 |
|
[ 1370 ]
�
� |
IMT characteristics for use in WRC-27 studies
�
� |
GSMA
� |
� |
2024-06-13 |
|
[ 1369 ]
�
� |
Considerations for the active antenna array radiation pattern model for IMT base stations
�
� |
Telefon AB - LM Ericsson
� |
� |
2024-06-13 |
|
[ 1368 ]
�
� |
Considerations on possible methodology to be used for sharing studies to assess protection of receiving space stations in the 7125-8400 MHz range (agenda item 1.7)
�
� |
France
� |
� |
2024-06-13 |
|
[ 1367 ]
�
� |
Proposals on Recommendation ITU-R S.[MITIGATION MEASURES]
�
� |
France
� |
� |
2024-06-13 |
|
[ 1366 ]
�
� |
Position and proposals regarding on the work on Recommendation ITU-R S.[MITIGATION MEASURES]
�
� |
Mozambique (Republic of)
,
Nigeria (Federal Republic of)
,
Papua New Guinea
� |
� |
2024-06-13 |
|
[ 1365 ]
�
� |
Proposed draft reply liaison statement to Working Party 4C - Work related to WRC-27 agenda item 1.13
�
� |
Germany (Federal Republic of)
� |
� |
2024-06-13 |
|
[ 1364 ]
�
� |
Further modifications to the working document of Document IMT-2030/1 "IMT-2030 background"
�
� |
IAFI
� |
� |
2024-06-13 |
|
[ 1363 ]
�
� |
Technical aspects of TDD technology for connectivity between space station and IMT user equipment for use in the proposed reply liaison statement to Working Party 4C regarding WRC-27 agenda item 1.13
�
� |
IAFI
� |
� |
2024-06-13 |
|
[ 1362 ]
�
� |
Propose updates to working DocumenT ITU-R M.[IMT-2020.UNWANT.MS]
�
� |
IAFI
� |
� |
2024-06-13 |
|
[ 1361 ]
�
� |
Further updates to the working document towards a preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.BS]
�
� |
IAFI
� |
� |
2024-06-13 |
|
[ 1360 ]
�
� |
Proposal for IMT characteristics study
�
� |
Korea (Republic of)
� |
� |
2024-06-13 |
|
[ 1359 ]
�
� |
Proposal for the test environments in IMT-2030 evaluation
�
� |
Korea (Republic of)
� |
� |
2024-06-13 |
|
[ 1358 ]
�
� |
Proposal for a working document of Document IMT-2030/2 "PROCESS"
�
� |
Korea (Republic of)
� |
� |
2024-06-13 |
|
[ 1357 ]
�
� |
Proposal for improving working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
�
� |
Korea (Republic of)
� |
� |
2024-06-13 |
|
[ 1356 ]
�
� |
Proposal for update to a working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
�
� |
Korea (Republic of)
� |
� |
2024-06-13 |
|
[ 1355 ]
�
� |
Consideration on an approach to develop technical and operational characteristics of IMT in the existing IMT bands for other IMT-related WRC-27 agenda items
�
� |
Samsung Electronics Co., Ltd.
� |
� |
2024-06-13 |
|
[ 1354 ]
�
� |
Consideration on parameters, assumptions and scenarios for IMT-2030 networks in 4 400-4 800 MHz, 7 125-8 400 MHz and 14.8-15.35 GHz band in sharing studies under WRC-27 agenda item 1.7
�
� |
Samsung Electronics Co., Ltd.
� |
� |
2024-06-13 |
|
[ 1353 ]
�
� |
Proposal for a new ITU-R Report on coordination of stations in the FS with IMT stations in the frequency band 6 425-7 125 MHz
�
� |
Kenya (Republic of)
,
South Africa (Republic of)
,
Zimbabwe (Republic of)
� |
� |
2024-06-13 |
|
[ 1352 ]
�
� |
Proposals to the preliminary draft revision of Recommendation ITU-R M.1036-7 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations
�
� |
Mexico
� |
� |
2024-06-13 |
|
[ 1351 ]
�
� |
Proposals regarding the working document towards a preliminary draft new Recommendation / Report ITU-R S.[MITIGATION MEASURES]
�
� |
Mexico
� |
� |
2024-06-13 |
|
[ 1350 ]
�
� |
Proposals to the working document towards a preliminary draft new Report ITU-R M.[IMT.A2G] - Non-safety communications between base stations on ground and airborne user equipment devices supported by the terrestrial component of IMT
�
� |
Mexico
� |
� |
2024-06-13 |
|
[ 1349 ]
�
� |
Working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
�
� |
Finland
,
Germany (Federal Republic of)
,
United Kingdom of Great Britain and Northern Ireland
� |
� |
2024-06-12 |
|
[ 1348 ]
�
� |
Proposals on the technical performance requirements for draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
�
� |
Apple Incorporated
� |
� |
2024-06-12 |
|
[ 1347 ]
�
� |
IMT base station density estimations for sharing and compatibility studies in preparation for WRC-27
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2024-06-12 |
|
[ 1346 ]
�
� |
Considerations on IMT-2020 technology related work
�
� |
Nokia Corporation
,
Apple Incorporated
,
Huawei Technologies Sweden AB
,
Intel Corporation
,
InterDigital Communications Corp.
,
Qualcomm, Inc.
,
Samsung Electronics Co., Ltd.
,
Telefon AB - LM Ericsson
,
ZTE Corporation
� |
� |
2024-06-12 |
|
[ 1345 ]
�
� |
Proposed reply liaison statement to Working Party 4C on work related to WRC-27 agenda item 1.13
�
� |
China (People's Republic of)
� |
AI1.13
� |
2024-06-12 |
|
[ 1344 ]
�
� |
Proposed material for reply liaison statements to relevant Working Parties
�
� |
Canada
� |
� |
2024-06-11 |
|
[ 1343 ]
�
� |
IMT-2030: Some considerations on usage scenarios, geographical environments and test environments
�
� |
Canada
� |
� |
2024-06-11 |
|
[ 1342 ]
�
� |
Proposal on text of working document towards the preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ]
�
� |
ATIS NextG Alliance
� |
� |
2024-06-10 |
|
[ 1341 ]
�
� |
Proposal on test environments for IMT-2030
�
� |
ATIS NextG Alliance
� |
� |
2024-06-10 |
|
[ 1340 ]
�
� |
Assessment of the effect of zero-forcing on gain distribution for active antenna of IMT BS
�
� |
France
,
New Zealand
� |
� |
2024-06-07 |
|
[ 1339 ]
�
� |
Working document towards a preliminary draft new Report ITU-R M.[1.7 X BAND] - Sharing and compatibility studies and development of technical conditions for the use of International Mobile Telecommunications (IMT) in the frequency band 7 125-8 400 MHz (or parts thereof) for the terrestrial component of IMT
�
� |
France
� |
� |
2024-06-07 |
|
[ 1338 ]
�
� |
Information on 5G NR MBS standards and practices
�
� |
China (People's Republic of)
� |
� |
2024-06-07 |
|
[ 1337 ]
�
� |
Proposals on working documents towards preliminary draft new Recommendation ITU-R M.[IMT-2020.UNWANT.BS] and ITU-R M.[IMT-2020.UNWANT.MS]
�
� |
China (People's Republic of)
� |
� |
2024-06-07 |
|
[ 1336 ]
�
� |
Preparations on evaluation of the new IMT-2020 submission
�
� |
China (People's Republic of)
� |
� |
2024-06-07 |
|
[ 1335 ]
�
� |
Proposals on IMT-2030/2 "Process"
�
� |
China (People's Republic of)
� |
� |
2024-06-07 |
|
[ 1334 ]
�
� |
Considerations on the test environments of IMT-2030
�
� |
China (People's Republic of)
� |
� |
2024-06-07 |
Resultats:1631 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):