Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 148 ]
�
� |
Proposal for G.977.1 study points
�
� |
China Mobile Communications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q8/15
� |
2017-06-05 |
|
[ 147 ]
�
� |
Proposed work program for G.7711
�
� |
Fujitsu Limited (Japan)
� |
Q14/15
� |
2017-06-05 |
|
[ 146 ]
�
� |
Proposed MI lists for Clause 7 in G.8152
�
� |
Fujitsu Limited (Japan)
� |
Q14/15
� |
2017-06-05 |
|
[ 145 ]
�
� |
Comments and Concern on CSF for G.8113.2 and G.8121.2
�
� |
Fujitsu Limited (Japan)
� |
Q10/15
� |
2017-06-05 |
|
[ 144 ]
�
� |
Proposed update to CSF for G.8121
�
� |
Fujitsu Limited (Japan)
� |
Q10/15
� |
2017-06-05 |
|
[ 143 ]
�
� |
Proposed initial text of MSRP to G.8121
�
� |
Fujitsu Limited (Japan)
� |
Q9/15, Q10/15
� |
2017-06-05 |
|
[ 142 ]
�
� |
Querying and notification mechanism for Ethernet Linear APS protocol status
�
� |
NEC Corporation (Japan)
� |
Q9/15, Q14/15, Q10/15
� |
2017-06-05 |
|
[ 141 ]
�
� |
Proposed test for clause 6.4 of draft revised Recommendation G.7712/Y.1703
�
� |
Alcatel-Lucent Shanghai Bell
� |
Q14/15
� |
2017-06-05 |
|
[ 140 ]
�
� |
Propose G.7712/Y.1703 to align with G.872 for Figure 6-17
�
� |
Alcatel-Lucent Shanghai Bell
� |
Q14/15
� |
2017-06-05 |
|
[ 139 ]
�
� |
Editorial Comments for G.874
�
� |
Alcatel-Lucent Shanghai Bell
� |
Q14/15
� |
2017-06-05 |
|
[ 138 ]
�
� |
Proposed additional text for G.874 clause 6.1.4.1.1 to cover OTUCn GCC0
�
� |
Alcatel-Lucent Shanghai Bell
� |
Q14/15
� |
2017-06-05 |
|
[ 137 ]
�
� |
Consideration for 1000BASE-T and 10GBASE-T Interfaces on G.8273.2
�
� |
NEC Corporation (Japan)
� |
Q13/15
� |
2017-06-05 |
|
[ 136 ]
�
� |
G.8273.3 Editorial comments
�
� |
NEC Corporation (Japan)
� |
Q13/15
� |
2017-06-05 |
|
[ 135 ]
�
� |
Consideration of synchronizationUncertain flag
�
� |
NEC Corporation (Japan)
� |
Q13/15
� |
2017-06-05 |
|
[ 134 ]
�
� |
Proposal on the revision of G.651.1 and G.Sup.40
�
� |
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q5/15
� |
2017-06-05 |
|
[ 133 ]
�
� |
G.vdsl: Support of eoc datagram
�
� |
Nokia Corporation
� |
Q4/15
� |
2017-06-05 |
|
[ 132 ]
�
� |
A generic functional model for MPLS-TP Shared Ring Protection in G.8132
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
Q9/15
� |
2017-06-05 |
|
[ 131 ]
�
� |
Proposed text for network objectives in G.8132
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
Q9/15
� |
2017-06-05 |
|
[ 130 ]
�
� |
Proposal of the new Appendix IV to revised ITU-T Rec. L.109/L.60 Construction of optical/metallic hybrid cables
�
� |
Orange (France)
,
ORANGE POLSKA S.A.
� |
Q16/15
� |
2017-06-05 |
|
[ 129 ]
�
� |
Proposed revision of L.314/L.85 to include live fibre detection in PONs
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q17/15
� |
2017-06-05 |
|
[ 128 ]
�
� |
Update profile version and clarify TableA.8 for G.8275.1
�
� |
NEC Corporation (Japan)
� |
Q13/15
� |
2017-06-05 |
|
[ 127 ]
�
� |
Add the data set parameter for multicast MAC address in G.8275.1
�
� |
NEC Corporation (Japan)
� |
Q13/15
� |
2017-06-05 |
|
[ 126 ]
�
� |
Additional data set parameters for sync management in G.7711
�
� |
NEC Corporation (Japan)
� |
Q14/15, Q13/15
� |
2017-06-05 |
|
[ 125 ]
�
� |
Proposal on revision of G.650.1 for cut-off wavelength measurement
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q5/15
� |
2017-06-05 |
|
[ 124 ]
�
� |
Comments on the draft G.8132/Y.1383
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
Q9/15
� |
2017-06-05 |
|
[ 123 ]
�
� |
Comments on the draft G.873.3
�
� |
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
� |
Q9/15
� |
2017-06-05 |
|
[ 122 ]
�
� |
AT&T OpenOMCI
�
� |
AT&T, Inc. (United States)
� |
Q2/15
� |
2017-06-05 |
|
[ 121 ]
�
� |
Skeleton and the proposed text for draft L.cci
�
� |
Waseda University
� |
Q16/15
� |
2017-06-05 |
|
[ 120 ]
�
� |
Considerations about the work in support of the 5G transport
�
� |
China Unicom
,
CAICT
,
ZTE Corporation (China)
� |
Q6/15
� |
2017-06-05 |
|
[ 119 ]
�
� |
proposals about the modification of Appendix V of G.959.1
�
� |
China Unicom
,
ZTE Corporation (China)
� |
Q6/15
� |
2017-06-05 |
|
[ 118 ]
�
� |
proposals about a minimum capability of 100G receiver for EVM in G.698.2
�
� |
China Unicom
,
CAICT
,
ZTE Corporation (China)
� |
Q6/15
� |
2017-06-05 |
|
[ 117 ]
�
� |
Proposed modification to the texts of draft L.110 (Currently L.dsa) in TD341(WP2/15)
�
� |
Waseda University
� |
Q16/15
� |
2017-06-05 |
|
[ 116 ]
�
� |
Proposed revision to clause 8.3.2, "For radiocommunication systems in bands above 6 GHz" in G.RoF
�
� |
National Institute of Information and Communications Technology
� |
Q2/15
� |
2017-06-05 |
|
[ 115 ]
�
� |
Discussion on types of the boxes and scope of the new Rec L.fdb
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
,
China Unicom
,
FiberHome
� |
Q16/15
� |
2017-06-05 |
|
[ 114 ]
�
� |
Proposal for OD/OM related issues in G.metro
�
� |
FiberHome Technologies Group (China)
� |
Q6/15
� |
2017-06-05 |
|
[ 113 ]
�
� |
Suggestions on OTN simplification for 5G and DCI applications
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
� |
Q11/15
� |
2017-06-05 |
|
[ 112 ]
�
� |
Proposals to modify the structure of L.108/L.79
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
,
YOFC
� |
Q16/15
� |
2017-06-05 |
|
[ 111 ]
�
� |
Discussions and comments for draft new Rec. L.wdc
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
,
China Unicom
,
Huawei
� |
Q17/15
� |
2017-06-05 |
|
[ 110 ]
�
� |
Draft new Rec. L.fdb "Requirements for Passive Optical Nodes: Fibre Distribution Box" (initial draft)
�
� |
Ministry of Industry and Information Technology (MIIT) (China)
,
China Unicom
,
Commscope
,
FiberHome
� |
Q16/15
� |
2017-06-05 |
|
[ 109 ]
�
� |
Oscillator related Sync Alarms
�
No file provided
� |
Rakon Limited
� |
Q13/15
� |
2017-06-05 |
|
[ 108 ]
�
� |
An example of 5G transport network application scenario
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
� |
Q11/15
� |
2017-06-05 |
|
[ 107 ]
�
� |
Performance updates on reference clocks for eEEC
�
� |
Rakon Limited
� |
Q13/15
� |
2017-06-05 |
|
[ 106 ]
�
� |
Proposal for ROADM related parameters in G.672
�
� |
FiberHome Technologies Group (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
� |
Q7/15
� |
2017-06-05 |
|
[ 105 ]
�
� |
Consideration on the management for SDN control of transport networks
�
� |
China Telecommunications Corporation
� |
Q14/15, Q12/15
� |
2017-06-05 |
|
[ 104 ]
�
� |
OMCI management support for XGS-PON
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
� |
Q2/15
� |
2017-06-05 |
|
[ 103 ]
�
� |
Consideration on performance and fault management in draft G.7702
�
� |
China Telecommunications Corporation
� |
Q14/15, Q12/15
� |
2017-06-05 |
|
[ 102 ]
�
� |
Proposal for G.8151 study points
�
� |
China Mobile Communications Corporation
� |
Q14/15
� |
2017-06-05 |
|
[ 101 ]
�
� |
Proposed text for Clause 6.4 of draft G.7702
�
� |
China Telecommunications Corporation
� |
Q14/15, Q12/15
� |
2017-06-05 |
|
[ 100 ]
�
� |
Proposals for open items in G.9807.1 Amd1
�
� |
China Telecommunications Corporation
,
FiberHome Technologies Group (China)
,
Futurewei Technologies US R&D Center (United States)
,
ZTE Corporation (China)
� |
Q2/15
� |
2017-06-05 |
|
[ 99 ]
�
� |
Comments on 5G transport over OTN
�
� |
KDDI Corporation (Japan)
� |
Q11/15
� |
2017-06-05 |
Resultados :398 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):