Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 527 ]
�
� |
Number of categories in Rec. ITU-T G.652
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q5/15
� |
2014-03-09 |
|
[ 526 ]
�
� |
Information and comment on zero-dispersion wavelength of G.652 fibre
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q6/15, Q5/15
� |
2014-03-09 |
|
[ 525 ]
�
� |
G.8261 Synchronous Ethernet Network Jitter Specification beyond 10GE
�
� |
Deutsche Telekom AG
� |
Q13/15
� |
2014-03-08 |
|
[ 524 ]
�
� |
G.8262 Synchronous Ethernet Equipment Jitter Specification beyond 10GE
�
� |
Deutsche Telekom AG
� |
Q13/15
� |
2014-03-08 |
|
[ 523 ]
�
� |
Withdrawn by submitter
�
Reposted as TD193/PLEN, "Draft revised Recommendation ITU-T G.976 (for Consent, 4 April 2014)"
� |
N/A (no se aplica)
� |
� |
2014-03-08 |
|
[ 522 ]
�
� |
Proposal to discuss optical cables for low-cost sustainable telecommunication infrastructure for remote areas in developing countries
�
� |
The ITU Association of Japan
� |
Q16/15
� |
2014-03-08 |
|
[ 521 ]
�
� |
G.8152 v0.05 Data Dictionary clauses 1.7 - 1.11
�
� |
Alcatel-Lucent USA Inc.
� |
Q14/15
� |
2014-03-08 |
|
[ 520 ]
�
� |
Proposal Work Areas for updating G.8052
�
� |
Alcatel-Lucent USA Inc.
� |
Q14/15
� |
2014-03-08 |
|
[ 519 ]
�
� |
Updates in the G.8271.1
�
� |
Telefon AB - LM Ericsson
� |
Q13/15
� |
2014-03-08 |
|
[ 518 ]
�
(Rev.1)� |
Proposal for the Multiplexing of ODU clients into OTUCn
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-03-08 |
|
[ 517 ]
�
� |
Cyclically Interleaved BCH "Swizzle" FEC for B100G IrDI or MV-IaDI
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-03-08 |
|
[ 516 ]
�
� |
Timing Distribution with PTP-over-OTN Overhead Proposal
�
� |
PMC-Sierra, Inc.
� |
Q13/15, Q11/15
� |
2014-03-08 |
|
[ 515 ]
�
� |
OTUCn Overhead Byte proposal
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-03-08 |
|
[ 514 ]
�
� |
Proposal for a scalable OTUCn frame structure
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-03-08 |
|
[ 513 ]
�
� |
Overview summary of B100G frame format and 400GE client mapping proposals
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-03-08 |
|
[ 512 ]
�
� |
400GbE client mapping proposals
�
� |
PMC-Sierra, Inc.
� |
Q11/15
� |
2014-03-08 |
|
[ 511 ]
�
� |
G.inp: Comparison of L2.1 power reduction methods
�
� |
TQ DELTA. LLC
� |
Q4/15
� |
2014-03-07 |
|
[ 510 ]
�
� |
Super-Product BCH (SP-BCH) Code for 100G and Beyond Networking
�
� |
Broadcom Corporation
� |
Q11/15
� |
2014-03-07 |
|
[ 509 ]
�
� |
G.hn, G.vdsl, G.fast : Objectives and Tools for PLC to DSL Interference Mitigation
�
� |
Metanoia Technologies, Inc.
� |
Q4/15, Q18/15
� |
2014-03-07 |
|
[ 508 ]
�
� |
G.hn: Using ACE symbols with precoding to save memory and complexity in Receiver
�
� |
Metanoia Technologies, Inc.
� |
Q18/15
� |
2014-03-07 |
|
[ 507 ]
�
� |
G.hn: Proposal to add SNR and throughput measurement tools in G.hn
�
� |
Metanoia Technologies, Inc.
� |
Q18/15
� |
2014-03-07 |
|
[ 506 ]
�
� |
G.hn: Special TXOP for IDCC / IDSW
�
� |
Metanoia Technologies, Inc.
� |
Q18/15
� |
2014-03-07 |
|
[ 505 ]
�
� |
G.hn: Comparison of the two options for Inter-Medium Bridging
�
� |
Metanoia Technologies, Inc.
� |
Q18/15
� |
2014-03-07 |
|
[ 504 ]
�
� |
Example Alternative B100G ODU Frame Format
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2014-03-07 |
|
[ 503 ]
�
� |
Thoughts on FEC for 400G IrDI
�
� |
Alcatel-Lucent USA Inc.
� |
Q6/15, Q11/15
� |
2014-03-07 |
|
[ 502 ]
�
� |
Possible areas for B100G OTN Framing optimization
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2014-03-07 |
|
[ 501 ]
�
� |
Possible 400G Ethernet PCS format and implications for B100G OTN framing
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2014-03-07 |
|
[ 500 ]
�
� |
OTN B100G Framing Decisions
�
� |
Alcatel-Lucent USA Inc.
� |
Q11/15
� |
2014-03-07 |
|
[ 499 ]
�
� |
ODU SMP Lower Order 1-stage signalling
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2014-03-07 |
|
[ 498 ]
�
� |
Clarification of clockClass table [G.8275.1]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 497 ]
�
� |
ODU SMP Proposal Status
�
� |
Alcatel-Lucent USA Inc.
� |
Q9/15
� |
2014-03-07 |
|
[ 496 ]
�
� |
T-TSC-P/T-BC-P/APTSC Model for partial timing support [G.8273.4]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 495 ]
�
� |
T-BC SyncE transient testing method [G.8273]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 494 ]
�
� |
T-BC SyncE Transient Requirement [G.8273.2]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 493 ]
�
� |
T-BC Model [G.8273.2]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 492 ]
�
� |
T-BC Applicable Interfaces [G.8273.2]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 491 ]
�
� |
Bench Results of SyncE (for use as IEEE1588/GNSS holdover) [G.827x]
�
� |
Microsemi
� |
Q13/15
� |
2014-03-07 |
|
[ 490 ]
�
� |
IPR: Ikanos Communications on IPR declarations on G.9700 and G.9701.
�
� |
Ikanos Communications
� |
Q4/15
� |
2014-03-07 |
|
[ 489 ]
�
� |
Definition of Clock Behaviour with Regards to clockClass Usage [G.8275.1]
�
� |
Ciena Canada
� |
Q13/15
� |
2014-03-07 |
|
[ 488 ]
�
� |
T-BC Clock Models [G.8273.2]
�
� |
Ciena Canada
� |
Q13/15
� |
2014-03-07 |
|
[ 487 ]
�
� |
Application code compatible with 40GBASE-ER4 in G.695
�
� |
Ciena Canada
� |
Q6/15
� |
2014-03-07 |
|
[ 486 ]
�
� |
Proposal for Update to G.977 considering 40G and 100G Coherent Systems
�
� |
Ciena Canada
� |
Q8/15
� |
2014-03-07 |
|
[ 485 ]
�
� |
Proposed changes to Recommendation G.977 for 40G and 100G systems
�
� |
Ciena Canada
� |
Q8/15
� |
2014-03-07 |
|
[ 484 ]
�
� |
Layers in Transport SDN
�
� |
Ciena Canada
� |
Q14/15, Q12/15
� |
2014-03-07 |
|
[ 483 ]
�
� |
MEF Mobile Backhaul
�
� |
Ericsson Canada, Inc.
� |
Q6/15, Q3/15, Q2/15, Q13/15, Q12/15, Q10/15
� |
2014-03-07 |
|
[ 482 ]
�
� |
Adoption of MEF technical specifications
�
� |
Canada
� |
Q10/15
� |
2014-03-07 |
|
[ 481 ]
�
� |
G9979
�
� |
Canada
� |
Q18/15
� |
2014-03-07 |
|
[ 480 ]
�
� |
G.inp: Proposed edits to help complete the VDSL LPM Amendment
�
� |
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
Ikanos Communications
� |
Q4/15
� |
2014-03-07 |
|
[ 479 ]
�
� |
Protection Architectures for G.metro
�
� |
ADVA Optical Networking
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2014-03-07 |
|
[ 478 ]
�
(Rev.1-2)� |
Reference diagrams for G.metro
�
� |
ADVA Optical Networking
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Coriant GmbH & Co. KG
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2014-03-07 |
Resultados :337 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):