Contribuciones Tard�as�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 206 ]
�
� |
G.vdsl: Proposal for OLR protocol
�
� |
Ikanos
,
Conexant
� |
Q4/15
� |
2005-04-27 |
|
[ 205 ]
�
� |
G.vdsl: NIPP-NAI VDSL2 Issues List
�
� |
Ikanos
� |
Q4/15
� |
2005-04-27 |
|
[ 204 ]
�
� |
G.vdsl: North American Regional Spectral Annex for VDSL2
�
� |
Ikanos
� |
Q4/15
� |
2005-04-27 |
|
[ 203 ]
�
� |
G.vdsl: Interleaving on the second latency path
�
� |
Ikanos
,
Lucent Technologies
,
Conexant
,
Alcatel USA
� |
Q4/15
� |
2005-04-27 |
|
[ 202 ]
�
� |
G.vdsl: Proposal to negotiate the speed of message transfer during Exchange phase
�
� |
Ikanos
,
2Wire
� |
Q4/15
� |
2005-04-27 |
|
[ 201 ]
�
� |
G.vdsl: Proposal for Channel Analysis and Exchange phase of initialization
�
� |
Aware
,
Texas Instruments
,
Infineon
,
Ikanos
,
Conexant
� |
Q4/15
� |
2005-04-27 |
|
[ 200 ]
�
� |
G.vdsl: Working text for PMD On-line reconfiguration
�
� |
Ikanos
� |
Q4/15
� |
2005-04-27 |
|
[ 199 ]
�
(Rev.1)� |
G.ethps - OAM behaviour in Ethernet protection switching
�
� |
Fujitsu
� |
Q9/15
� |
2005-04-26 |
|
[ 198 ]
�
� |
Draft new Recommendation G.voceth: Terminology Recommendation for Ethernet over Transport (for consent)
�
� |
Editor Rec. G.voceth
� |
Q12/15, Q11/15, Q3/15
� |
2005-04-26 |
|
[ 197 ]
�
� |
Transporting Synchronisation over Ethernet
�
� |
UK
� |
Q13/15, Q12/15, Q9/15
� |
2005-04-25 |
|
[ 196 ]
�
� |
10GLANPHY and G.709 OTN bit rates
�
� |
UK
� |
Q12/15, Q11/15, Q9/15
� |
2005-04-25 |
|
[ 195 ]
�
� |
VDSL2: Text proposal of a regional annex of VDSL2 for the TCM-ISDN environment
�
� |
NTT
,
SEI
,
SoftbankBB
,
NEC
,
Fujitsu
,
eAccess
,
ACCA Networks
� |
Q4/15
� |
2005-04-25 |
|
[ 194 ]
�
� |
G.vdsl2: List of Problems with the VDSL2 Draft
�
� |
2Wire
� |
Q4/15
� |
2005-05-04 |
|
[ 193 ]
�
� |
A proposal for use and coding of the VLI byte during 1xDSn/En non-VCAT/LCAS operation
�
� |
USA
� |
Q11/15, Q9/15
� |
2005-04-25 |
|
[ 192 ]
�
� |
G.vdsl2: Proposal for a new final Settling stage of initialisation
�
� |
2Wire
� |
Q4/15
� |
2005-05-01 |
|
[ 191 ]
�
� |
G.vdsl2: Proposal to introduce the concept of service priorities
�
� |
2Wire
� |
Q4/15
� |
2005-05-01 |
|
[ 190 ]
�
� |
G.vdsl2: Proposed Text for Tone Ordering
�
� |
2Wire
� |
Q4/15
� |
2005-05-01 |
|
[ 189 ]
�
� |
G.vdsl2: Bit Swap and OLR Proposal
�
� |
2Wire
� |
Q4/15
� |
2005-05-01 |
|
[ 188 ]
�
� |
Chromatic dispersion statistics on one implementation of G.655 fibre
�
� |
Corning Incorporated
� |
Q7/15, Q6/15, Q5/15
� |
2005-04-25 |
|
[ 187 ]
�
� |
Draft Revised ITU-T Recommendation G.652 (for consent)
�
� |
Editor Rec. G.652
� |
Q5/15
� |
2005-04-25 |
|
[ 186 ]
�
� |
Value for maximum spectral excursion in draft Recommendation G.dapp
�
� |
Finisar Corporation
� |
Q6/15
� |
2005-04-25 |
|
[ 185 ]
�
� |
Values for maximum optical path penalty in draft Recommendation G.dapp
�
� |
Finisar Corporation
� |
Q6/15
� |
2005-04-25 |
|
[ 184 ]
�
� |
Parameter values for 10Git/s single-channel applications with FEC in G.959.1
�
� |
Finisar Corporation
� |
Q6/15
� |
2005-04-26 |
|
[ 183 ]
�
� |
Values for maximum chromatic dispersion in Recommendation G.695
�
� |
Finisar Corporation
� |
Q6/15
� |
2005-04-25 |
|
[ 182 ]
�
� |
Usage of EDC techniques for 80km 10 Gbit/s applications in G.959.1
�
� |
Finisar Corporation
� |
Q6/15
� |
2005-04-25 |
|
[ 181 ]
�
� |
Preliminary comparison of SBS critical power definitions for various test fibers
�
� |
OFS
� |
Q5/15
� |
2005-04-25 |
|
[ 180 ]
�
� |
Small bending radius optimized G.652 compatible single mode fibres
�
� |
Draka Comteq
� |
Q10/15
� |
2005-04-21 |
|
[ 179 ]
�
� |
Draft new Recommendation G.8011.2/Y.1307.2 - Ethernet Virtual Private Line Service (for consent)
�
� |
Editor Rec. G.8011.2/Y.1307.2
� |
Q11/15
� |
2005-04-19 |
|
[ 178 ]
�
� |
Report of Q9, 11, 12/15 and 9/13 joint meeting, Genoa, Italy, 28 February-4 March 2005
�
� |
Rapporteurs Q9, 11, 12/15 and 5/13
� |
Q12/15, Q11/15, Q9/15
� |
2005-04-04 |
|
[ 177 ]
�
� |
Report of Q12/15 and Q14/15 joint interim meeting, Shenzhen, China, 21-25 March 2005
�
� |
Rapporteurs Q12 and 14/15
� |
Q14/15, Q12/15
� |
2005-04-04 |
|
[ 176 ]
�
� |
Error in Recommendation G.809 flow point pool link description
�
� |
Siemens AG
� |
Q12/15
� |
2005-03-22 |
Resultados :281 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):